09.08.2013 Views

Bright House Networks Information Services ... - AT&T Clec Online

Bright House Networks Information Services ... - AT&T Clec Online

Bright House Networks Information Services ... - AT&T Clec Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment 1<br />

Page 23<br />

Exhibit C<br />

6.3.2 The OCN, From RAO, and Invoice Number will control the invoice sequencing. The<br />

From RAO will be used to identify to BHN which AT&T RAO is sending the<br />

message. AT&T and BHN will use the invoice sequencing to control data exchange.<br />

AT&T will be notified of sequence failures identified by BHN and resend the data as<br />

appropriate.<br />

Version 4Q01 12/01/01<br />

THE DATA WILL BE PACKED USING ATIS EMI RECORDS.<br />

6.4 Pack Rejection<br />

6.4.1 BHN will notify AT&T within one business day of rejected packs (via the mutually<br />

agreed medium). Packs could be rejected because of pack sequencing discrepancies or<br />

a critical edit failure on the Pack Header or Pack Trailer records (i.e. out-of-balance<br />

condition on grand totals, invalid data populated). Standard ATIS EMI Error Codes<br />

will be used. BHN will not be required to return the actual rejected data to AT&T.<br />

Rejected packs will be corrected and retransmitted to BHN by AT&T.<br />

6.5 Control Data<br />

6.6 Testing<br />

BHN will send one confirmation record per pack that is received from AT&T. This<br />

confirmation record will indicate BHN received the pack and the acceptance or<br />

rejection of the pack. Pack Status Code(s) will be populated using standard ATIS<br />

EMI error codes for packs that were rejected by BHN for reasons stated in the above<br />

section.<br />

6.6.1 Upon request from BHN, AT&T shall send test files to BHN for the Optional Daily<br />

Usage File. The Parties agree to review and discuss the file’s content and/or format.<br />

For testing of usage results, AT&T shall request that BHN set up a production (LIVE)<br />

file. The live test may consist of BHN’s employees making test calls for the types of<br />

services BHN requests on the Optional Daily Usage File. These test calls are logged<br />

by BHN, and the logs are provided to AT&T. These logs will be used to verify the<br />

files. Testing will be completed within 30 calendar days from the date on which the<br />

initial test file was sent.<br />

CCCS 48 of 369

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!