09.08.2013 Views

Bright House Networks Information Services ... - AT&T Clec Online

Bright House Networks Information Services ... - AT&T Clec Online

Bright House Networks Information Services ... - AT&T Clec Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Version 4Q01: 12/01/01<br />

Attachment 4-Central Office<br />

Page 18<br />

of receipt of a Bona Fide Application. The Application Response will include, at a<br />

minimum, the configuration of the space, the Cable Installation Fee, Cable Records<br />

Fee, and the space preparation fees, as described in Section 8.<br />

6.10.5 In Louisiana, when space has been determined to be available, AT&T will provide a<br />

written response (“Application Response”) within thirty (30) calendar days for one (1)<br />

to ten (10) Applications; thirty-five (35) calendar days for eleven (11) to twenty (20)<br />

Applications; and for requests of more than twenty (20) Application it is increased by<br />

five (5) calendar days for every five (5) Applications received within five (5) business<br />

days. The Application Response will include, at a minimum, the configuration of the<br />

space, the Cable Installation Fee, Cable Records Fee, and the space preparation fees,<br />

as described in Section 8.<br />

6.11 Application Modifications.<br />

6.12 If a modification or revision is made to any information in the Bona Fide Application<br />

prior to Bona Fide Firm Order, with the exception of modifications to Customer<br />

<strong>Information</strong>, Contact <strong>Information</strong> or Billing Contact <strong>Information</strong>, either at the request<br />

of BHN or necessitated by technical considerations, said Application shall be<br />

considered a new Application and shall be handled as a new Application with respect<br />

to response and provisioning intervals and AT&T may charge BHN an application fee.<br />

Where the Application Modification does not require assessment for provisioning or<br />

construction work by AT&T, no application fee will be required. The fee for an<br />

Application Modification where the modification requested has limited effect (e.g.,<br />

requires limited assessment and no capital expenditure by AT&T) shall be the<br />

Subsequent Application Fee as set forth in Exhibit C. Major changes such as<br />

requesting additional space or adding equipment may require BHN to submit the<br />

Application with an Application Fee.<br />

6.13 Bona Fide Firm Order.<br />

6.13.1 BHN shall indicate its intent to proceed with equipment installation in a AT&T<br />

Premises by submitting a Firm Order to AT&T. The Bona Fide Firm Order must be<br />

received by AT&T no later than thirty (30) calendar days after AT&T’s Application<br />

Response to BHN’s Bona Fide Application or the Application will expire.<br />

6.13.2 AT&T will establish a firm order date based upon the date AT&T is in receipt of a<br />

Bona Fide Firm Order. AT&T will acknowledge the receipt of BHN’s Bona Fide Firm<br />

Order within seven (7) calendar days of receipt indicating that the Bona Fide Firm<br />

Order has been received. A AT&T response to a Bona Fide Firm Order will include a<br />

Firm Order Confirmation containing the firm order date. No revisions will be made to<br />

a Bona Fide Firm Order.<br />

7. Construction and Provisioning<br />

CCCS 148 of 369

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!