(Inserted as per IDC decision taken vide item 5 on<br />
12.11.2002)<br />
14. WATER & POWER Rule 14(a) - Water<br />
Where water lines are provided by the Corporation, it<br />
will be provided upto the main roads only. The<br />
applicants shall take water lines from the mains lines<br />
opposite to their plots at their expenses.<br />
Rule 14(b) - Power<br />
(i) Power line <strong>of</strong> class upto 11 KV will be provided<br />
upto the premises <strong>of</strong> the allottee at the cost <strong>of</strong><br />
<strong>RIICO</strong>. Thereafter, the cost <strong>of</strong> service line from the<br />
power line to inside the premises shall be borne by<br />
the applicant.<br />
(ii) <strong>RIICO</strong> in no case will provide cost for the laying<br />
<strong>of</strong> power lines above 11 KV class whether inside<br />
or outside the industrial area.<br />
(iii) Where sub-division <strong>of</strong> allotted plot has been<br />
allowed by <strong>RIICO</strong> and a separate connection is<br />
desired in such sub-divided plot, the complete cost<br />
<strong>of</strong> electric connection would be borne by the<br />
applicant. This condition is also to be incorporated<br />
in the permission given for sub-division.<br />
(iv) In case <strong>of</strong> load extension <strong>of</strong> an industry, all the<br />
charges will be paid by the applicant and <strong>RIICO</strong><br />
will not bear the charges for allowing load<br />
extension.<br />
(v) In the case where electric connection is existing<br />
and the plot has been transferred/ sold/ auctioned<br />
and transferee/ purchaser requires a new<br />
connection in the plot, all charges towards the<br />
connection will be borne by the applicant. <strong>RIICO</strong><br />
will not bear any cost. This condition is required to<br />
be incorporated in the relevant terms and<br />
conditions.<br />
(vi) Where exclusive feeder, directly from sub station,<br />
is required by any plot allottee, the complete cost<br />
will be borne by the applicant.<br />
(vii) In cases <strong>of</strong> industrial areas where power supply<br />
arrangements are not to be undertaken by <strong>RIICO</strong><br />
as stipulated in plot allotment letter, the entire cost<br />
<strong>of</strong> electrification will be borne by the applicant.<br />
(viii) If any extra financial burden has come upon the<br />
plot allottee due to change in the policy <strong>of</strong> the<br />
concerned State Power Utility, the same would be<br />
borne by the allottee.