08.08.2013 Views

View/Open - University of Zululand Institutional Repository

View/Open - University of Zululand Institutional Repository

View/Open - University of Zululand Institutional Repository

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

About 77% <strong>of</strong> respondents did not have knowledge about the factors undermining financial<br />

discipline in the study area. However, the following reasons were obtained as setbacks from<br />

respondents: corruption (61%), mismanagement (29.7%), poor planning (42%) unequal<br />

political representation (21 %), lack <strong>of</strong> transparency (9%), unemployment (6%) and non­<br />

payment <strong>of</strong>services by residents (10%). The chief financial <strong>of</strong>ficer has been suspended for<br />

further investigations into his possible involvement in financial irregularities.<br />

Respondents were required to comment on the perceived level <strong>of</strong> the adequacy <strong>of</strong><br />

infrastructural facilities. Table 6.30 describes whether the infrastructural facilities are<br />

adequate enough in ensuring sustainable development in the study area. Approximately 13%<br />

Table 6.30: The level <strong>of</strong>adequacy <strong>of</strong>infrastructural facilities <strong>of</strong> U1undi in 2007<br />

Infrastructural<br />

facilities<br />

Frequency Percentage<br />

I<br />

I<br />

Cumulative<br />

percentage<br />

Adequate 3.2 13 I 13<br />

,<br />

Inadequate<br />

18 72 I 85 I!<br />

N/A 3.8 15 i 100<br />

I<br />

Total 25 100 I 100<br />

<strong>of</strong> respondents affirmed an adequate level <strong>of</strong> infrastructural facilities in ensuring sustainable<br />

growth and development <strong>of</strong> Ulundi. Meanwhile most responses (72%) saw the existing<br />

infrastructural facilities as inadequate to promote sustainable local economic development.<br />

However, about 15% felt that they had little or no insight into the subject matter.<br />

The rates <strong>of</strong> non-payment for municipal servIces and facilities to the Ulundi Local<br />

Municipality by users were 62% and 61 % for 2005 and 2006 respectively. Currently, over<br />

60% <strong>of</strong> households are owing the municipality and most <strong>of</strong> them are nat regular in settling<br />

their municipal bills (Mhlongo, Pers. Comm., Tuesday, 24-12-2007). The Ulundi municipal<br />

management has the feeling that the ageing infrastructure leads to diminished service delivery<br />

and may worsen in years to come unless the trend <strong>of</strong>no payment is reversed. The council has<br />

given serious consideration to the approval and implementation <strong>of</strong> a proper debt collection<br />

190<br />

I I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!