06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Installation<br />

3.1 Delivery Contents<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Installation<br />

- 1 unit boiler body on transpalet with outside<br />

insulation packed with stretch film<br />

- Coat group in cardboard box that is ready for<br />

mounting, joint package that is necessary for fitting<br />

coat to the boiler.<br />

- Filed user and assemble manuel in boiler package.<br />

- Connection flange, mounted to the boiler, ready for<br />

welding, 2 unit ( Flange fits to boiler easily. There is<br />

no connection flange on Yakut Plus series)<br />

- 2 unit clingrite gasket, in accordance with connection<br />

flanges, mounted to the boiler ( in accordance with<br />

the boiler, There is no clingrite gasket on Yakut Plus<br />

series )<br />

- 8 unit M16x70 bolt, mounted to the boiler, in<br />

accordance with connection flanges.<br />

- 8 unit M16 washer, in accordance with connection<br />

flanges.<br />

- Ceramic wick for insulating the surroundings of<br />

burner (Ø22mm)<br />

- Ceramic blanket for insulating the surroundings of<br />

burner where is inside of the boiler.<br />

- Explosion cover mounted to the boiler,<br />

- Burner Connection Flange mounted to the boiler,<br />

Materials mentioned above are equipments that is<br />

delivered with boiler.<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!