5.4 Installation of Shunt Pump<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Installation / System<br />

In case of the drop of the<br />

return water temperature under<br />

55 °C, shunt pump must be<br />

used to supply the return water<br />

at 55°C<br />

In case of usage of the<br />

shunt pump, temperatures of<br />

boiler water was specified at<br />

section of “Temperatures of<br />

Radiator Water” which was<br />

explained on chapter 6.2<br />

Attention In case of drop of the return water<br />

temperature under 55 °C because of installation, shunt<br />

pump must be used to supply return water at 55°C. It is an<br />

essential to use a shunt pump which was calculated at<br />

proper flow quantity and pressure height. Unusage of this<br />

pump or/and usage of a pump that is not suitable, wrong<br />

assembly, falty connections and placement of the pump<br />

may damage to the boiler in long or short term. In case of<br />

these circumstances pump will be out of warranty.<br />

Attention: It is important that installation which<br />

pump connected to must be designed and applied in<br />

accordance with projects and standards. Engineering<br />

calculations must be in accordance with EN installation<br />

design standards.<br />

Attention: As long as device works with shunt<br />

pump, connections of electrical panel and mechanical<br />

installation must be installed by experienced people,<br />

process of first start-up of the device must be done by<br />

authorized technical service. Otherwise the device will be<br />

out of warranty.<br />

Electricshock Danger! Before protective hat and<br />

pieces of cover is taken out, all electrical connections on<br />

boiler must be disassembled. Works that will be done when<br />

electric is on, must be carried on by authorized people after<br />

all necessary precuations are supplied.<br />