06.08.2013 Views

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

FTA Manual.pdf - Industrial Air

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.3 Chimney Connection<br />

63 9810.0156 – Rev.04 –12/01/2007<br />

Installation / System<br />

Caution! Waste gas way must be as short as<br />

possible. Waste gas pipes must be installed as in slanting<br />

direction towards chimney and connections must have full<br />

imperviousness.<br />

The chimney must be designed considering<br />

technical specifications determined in DIN 4705 and built<br />

according to DIN 18160.<br />

Both boiler back pressures and boiler pressures<br />

must be in consideration at chimney calculations.<br />

If the waste gas heat is under 160°C in continuous<br />

operating, it is forbidden to use an ordinary chimney.<br />

Warning! ! To change the burner power may effect<br />

waste gas temperature. It is advised to attach an<br />

absorbtion restrictive for high rating exhaust chimneys.<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!