Installation / System<br />
5. Installation/ System<br />
5.1 Heating System Connection<br />
63 9810.0156 – Rev.04 –12/01/2007<br />
Connect the heating system to inlet and outlet of the<br />
boiler.<br />
Mount the filling and discharging connection and its<br />
valve to related connection field at back side of the boiler.<br />
Move the boiler to its operation area and balance it<br />
with the balancing bolts.<br />
Mount the safety equipments connections.<br />
Maximum opening pressure can not be upper than 3<br />
bar (maximum operating pressure).<br />
Connect the safety valves (at inlet and oultet of<br />
boiler), expansion pipes and safety valve in accordance<br />
with the boiler.Ensure that expansion tank is filled by water<br />
and water level and direction of installation is correct. All<br />
pipes must be iron made. Usage of the plastic pipes are<br />
forbidden.<br />
Connect the closed expansion tank and the safety<br />
valve to the boiler properly at the closed heating<br />
installation.Be sure that the expansion tank is full with<br />
water and water pressure is suitable.<br />
Caution: Safety valve must be mounted onto<br />
boiler directly according to related standards. There<br />
must not be any valve, diameter reducer equipment,<br />
pump and these kind of equipments between boiler<br />
and safety valve. Safety valve must be unadjustable<br />
and suitable to CE standards and connection<br />
diameter. There must be a safety valve at tne nearest<br />
point to the boiler on the safety valve installation. In<br />
case of incompliance to the explanations mentioned<br />
on the top, the boiler will be out of warranty and<br />
manufacturer company is not responsible for physical<br />
and sipiritual damages.<br />