Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.12 RTI Service Issues<br />
1.12.1 RTI MIB Tests<br />
The LOV fryer will ONLY operate with RTI systems that have the new RTI updated<br />
three-pole float switch. If the float switch is the older two-pole switch, call RTI. These<br />
float switches are polarity specific which may short to ground and damage an MIB<br />
board.<br />
Normal measurements (MIB J6 8-pin connector with everything connected)<br />
AC voltage measurements:<br />
Pin 1 to Pin 2 - 24 VAC.<br />
Pin 2 to Pin 8 - 24 VAC when waste tank is full, 0 VAC when it is not full.<br />
Pin 2 to Pin 3 - 24 VAC when RTI fill pump is on, 0 VAC when it is off.<br />
Using the RTI test box, PN# 108-0716 allows a quick and easy way to check the 24VAC, the waste<br />
full switch and when the RTI pump is operating.<br />
Troubleshooting<br />
All return and drain valves should be closed and pump should be off while the MIB is resetting. If any<br />
of the valves or the pump is on during reset, the MIB board is bad or wires are shorted.<br />
JIB solenoid is not opening:<br />
Take these readings when the JIB valve is in the open position:<br />
1. Reset the power; wait 60 seconds and see if the valve opens.<br />
2. Check voltage at ATO board on J8. Pin 9 to Pin 16 should be 24 VAC.<br />
RTI pump is not operating or JIB is not filling:<br />
See page 1-26 to ensure that no other function is taking priority over adding oil to jug.<br />
With the JIB button pressed:<br />
1. Voltage at MIB board from Pin 1 to Pin 2 should be 24 VAC; if not, check connections from RTI<br />
24VAC transformer and check transformer.<br />
2. Voltage at MIB board from Pin 2 to Pin 3 should be 24 VAC; if not, the MIB board is bad or wires to<br />
pump relay are shorted or both.<br />
3. Voltage at Add pump relay should be 24 VAC; if not, check wiring from MIB board. The relay is<br />
located on top of RTI system.<br />
Waste full signal:<br />
Pin 2 to Pin 8 should be 24 VAC when full, 0 VAC when not full; if no voltage level change, the<br />
connection from RTI switch or MIB board is bad.<br />
1-23