Full vat element wire routing<br />
3<br />
6<br />
2<br />
5<br />
1<br />
4<br />
6L 5L 4L 3L 2L 1L<br />
Pull the element wires through the<br />
bushings on either side of the frypot<br />
and down the back. Element wires<br />
should be routed to the right of the<br />
ATO temperature probe on the back<br />
wall of the frypot.<br />
Dual vat element wire routing<br />
Pull the element wires through the<br />
bushings on either side of the frypot<br />
and down the back. Element wires<br />
should be routed to the center of the<br />
frypot between the ATO temperature<br />
probes.<br />
Element grounding and wire<br />
routing<br />
To ground the element wires, use the<br />
hole in the frypot frame located under<br />
the bushing that the element wires pass<br />
through. Using a screw through the<br />
ground wires ring terminal, connect it<br />
to the frypot using the probe ground<br />
clip. Use a tie wrap to tie up half of the<br />
element wires after the wires are pulled<br />
through the bushing. Do not pull tie<br />
wrap tight, leave it slack at about one<br />
inch<br />
Index Marker marks<br />
Position 1<br />
1-6<br />
6<br />
R<br />
5<br />
R 4R<br />
3<br />
6<br />
9<br />
2<br />
5<br />
8<br />
3R<br />
1<br />
4<br />
7<br />
2<br />
R<br />
1R