nickel line through a sintered metal filter into<br />

heated cl-in.-diam by 3-ft-high nickel product<br />

storage vessels. The caps de-filling operation<br />

is not illustrated but will consist in transferring<br />

salt horn a product vessel to an array of 60 en-<br />

riching capsules in a furnace. Product vessels<br />

and enriching capsules will be stored in cell G<br />

until needed at <strong>the</strong> MSRE.<br />

KOH<br />

I<br />

STATUS<br />

Engineering design is estimated to be 95% com-<br />

pleted, and fabrication of <strong>the</strong> equipment is 85%<br />

253<br />

GAS<br />

AN A LYS IS<br />

Fig. 26,l. MSRE 233U Fuel <strong>Salt</strong> Preparation System.<br />

completed. The project has been delayed because<br />

<strong>the</strong> TURF building is not completed; consequently,<br />

<strong>the</strong> cost-plus-fixed-fee (CPFF) contractor and <strong>the</strong><br />

laboratory forces have beten delayed in starting <strong>the</strong><br />

installation of equipment. Assuming that <strong>the</strong> build-<br />

ing will bc available on September 15, 1967, and<br />

that <strong>the</strong> CPFF contractor and ORNI, Eorces each<br />

require dbout one month for <strong>the</strong>ir portions of <strong>the</strong><br />

job, <strong>the</strong> full-scale cold run should start December<br />

1, 1967; hot tuns should start January 20, 1968,<br />

and be completed in mid-April 1968.