No *<br />

Table 3%. Capital cost estimate Of commercial<br />

1-GWe DKsa and PWR plants<br />

(Expressed in millions of 1998.0 dollars)<br />

Item DKSR JPWR<br />

Direct Costs<br />

20 Land and Land rights<br />

21 Structures and Lmpr ovement s<br />

22 Reactor plant equipment<br />

23 Turbine plant equipment<br />

24 Electric plant equipment<br />

25 Miscellaneous plant equipment<br />

26 Naira condenser heat rejection system<br />

Total direct costs<br />

Indirect costs<br />

91 COnstructiQIl SeHViCes<br />

92 Home office engineering and service<br />

93 Field office engineering and service<br />

Total indirect costs<br />

Total plant capital cost<br />

2 2<br />

1124 11%<br />

180 139<br />

180 113<br />

54 44<br />

317 1%<br />

~<br />

E4 22<br />

-<br />

491 444<br />

95 70<br />

53 53<br />

34 30<br />

- -<br />

162 153<br />

65% 597<br />

A discussion OF some sf <strong>the</strong> important assmptiofts ana results for<br />

<strong>the</strong> major accounts follows e<br />

Account 21. Structures and improvements. The primary and major<br />

structure in <strong>the</strong> DMSR plant is <strong>the</strong> reactor containment building. While<br />

layouts of internal areas would differ, comparable costs with <strong>the</strong> PWR<br />

are expected. An allowance has been entered for plant lifetime storage<br />

of radioactively contaminated items including provisions to facilitate<br />

decommissioning operations.<br />

The o<strong>the</strong>r structures parallel <strong>the</strong> PWR structures in cost. The tur-<br />

bine rooms are considered comparable. A supercritical steam turbine for<br />

<strong>the</strong> DMSR is considerably smaller than a PWR turbine, but space was allowed<br />

for extra piping and equipment that may be required to adapt <strong>the</strong> super-<br />

critical system to a molten-salt steam generator.<br />

Space was also allowed<br />

for handling and storing coolant salt fog. noma1 operations and for