Table 31. Bases for capital or investment cost estimates<br />

Plant site, Middletom<br />

(New England area)<br />

Bases Excluded costs<br />

eode of accounts, NUS-531<br />

and NUWG-8241, -0242, -0243<br />

(direct and indirect accounts)<br />

Cost date, 1978.6<br />

Regulation codes and standards,<br />

1976<br />

Evaporative c001511g<br />

Commercial plant size (optimum),<br />

loo0 me<br />

Cash flow, 1978 to eomercial<br />

operation in 1988<br />

Capital costs in 1978<br />

do bl ar s 1 kWe<br />

Nuclear liability insurance<br />

Interest during construction<br />

Escalation during construction<br />

Contingency allowance<br />

OWtIerSi CQsts %lTcPUdiI'lg expenses<br />

for taxes and property insurance,<br />

spare parts, staff training<br />

General and administrative site<br />

selecti~n, and o<strong>the</strong>r owner-related<br />

expenses<br />

<strong>Salt</strong> and fuel inventory, incIuding<br />

chemical processing system<br />

me capital costs estimated for <strong>the</strong> DHSR and <strong>the</strong> PWR by major (two-<br />

digit) accounts are given in Table 32. A fur<strong>the</strong>r breakdown (for three-<br />

digit a@co%mts), which aiso includes <strong>the</strong> estimate for <strong>the</strong> coaa-fired<br />

plant, is given in Appendix A (Table A.1).<br />

ule for <strong>the</strong> DMSR (adapted to <strong>the</strong> CONCEPT V cash €How schedule) is also<br />

given in Appendix A (Table ik.2).<br />

A cumulative cash flaw sched-<br />

The capital costs of <strong>the</strong> fuel treatment<br />

facilities are not included here but are taken into account in <strong>the</strong> fuel<br />

cycle cost (see Sect. 5.3.4). However, space and equipment for handling<br />

<strong>the</strong> coolant salt are included in <strong>the</strong> reactor plant estimates.<br />

The DXSR is estimated to cost $653 million, or about .$65O/kWe in 1978<br />

dollars. This compares with about $600/kWe for a PWR plant and $38O/kWe<br />

for a coal plant without flue-gas cleaning.