TPle fuel makeup requirements are expressed in metric tons of UaOg<br />

for 30 years of operation in a 1-GWe plant at 75% capacity factor and are<br />

averages for ten 30-year cycles. The effect of this averaghg is most<br />

pronounced for option A; <strong>the</strong> fuel makeup requirement is only a fraction<br />

of <strong>the</strong> average for <strong>the</strong> first one or two reactor lifetimes and is somewhat<br />

greater than <strong>the</strong> average for <strong>the</strong> last cycles. Thus, while this option<br />

would require more uramim than <strong>the</strong> o<strong>the</strong>rs in <strong>the</strong> very long tern, its per-<br />

fomance for <strong>the</strong> first few reactor lifetimes would be quite attractive.<br />

Even for <strong>the</strong> long-term, this resource requirement would be well below<br />

that of current-generation LWRs. Option B illustrates <strong>the</strong> long-term sav-<br />

ing in uranium resources that could be achieved if higher enrichments<br />

could be tolerated for <strong>the</strong> relatively small amsunts of makeup fuel, Be-<br />

cause <strong>the</strong> resource savings are principally long tlem and <strong>the</strong> required<br />

uranium enrichment exceeds currently perceived denaturing limits this<br />

appears to be OR^ of <strong>the</strong> less gromhsi~~g options, The two remaining 0p-<br />

tions, C and D, both show favorable resource utilization properties for<br />

long times with only minor penalties for discarded uranium (option C> or<br />

uranium subjected to reenrichment (optism B), Of <strong>the</strong>se, option P) clearly<br />

would be preferable if reenrichent were an acceptable procedure<br />

Tke preceding four converter options and/or <strong>the</strong> break-even breeder<br />

would require <strong>the</strong> availability of a cornpPex and expensive fuel cleanup<br />

facility withh <strong>the</strong> primary containment of each reactor installation.<br />

The technology for an integrated proeessfng facility has not been fully<br />

developed, and past work clearly indicates that a substantial development<br />

effort would be required to produce a commercially functional system.<br />

Even <strong>the</strong>n, <strong>the</strong> capital, operating, and maintenance costs of such a system<br />

possibly would have a signiffcant adverse impact on <strong>the</strong> overall economic<br />

perforname of <strong>the</strong> associated DMSR. O<strong>the</strong>r factors to be considered for<br />

<strong>the</strong>se options included <strong>the</strong> willingness of <strong>the</strong> reactor operator to assme<br />

* Conceivably, a single cleanup facility could serve several reactors<br />

at a cornon site, but such an arrangement would complieate <strong>the</strong> 0peratiQn<br />

and would add problem~ of inventory accountability among <strong>the</strong> various<br />

units.<br />