ANP PROJECT PROGRESS REPORT<br />

<strong>the</strong> necessary information for two of <strong>the</strong> six lnconel<br />

shells is available, and Lycoming is expediting<br />

work on <strong>the</strong>se two shells. Additional design in-<br />

formation is still needed for <strong>the</strong> remaining shells,<br />

but mandrels are being rough machined for pro-<br />

ducing <strong>the</strong>m.<br />

The beryllium reflector for <strong>the</strong> ETU is being<br />

machined by The Brush Beryllium Co., but some<br />

information on this item is still lacking because<br />

of design modifications, The island holes are<br />

now being drilled at <strong>ORNL</strong> and <strong>the</strong> island will<br />

be sent to The Brush Beryllium Co. for contouring<br />

when this operation is completed.<br />

The heat exchanger suppliers are still studying<br />

assembly methods and techniques for fabricating<br />

<strong>the</strong> channel sections of <strong>the</strong> fuel-to-NaK heat ex-<br />

changers. Potentially, this equipment still appears<br />

to be one of <strong>the</strong> controlling factors in <strong>the</strong> assembly<br />

schedule.<br />

Orders for <strong>the</strong> boron carbide tiles and boron-<br />

copper cermets have been placed with <strong>the</strong> Norton<br />

Company and <strong>the</strong> Allegheny Ludlum Steel Corp.,<br />

respectively. A fabricator has not yet been se-<br />

lected to form <strong>the</strong> boron-copper cermets into <strong>the</strong><br />

desired shapes.<br />

Fabrication of <strong>the</strong> heavy l-in.-thick pressure<br />

shells, which must be specially formed, will re-<br />

74<br />

quire equipment that is not widely available.<br />

Because of <strong>the</strong> special dies which will be re-<br />

quired, <strong>the</strong> delivery of <strong>the</strong>se heavy shells may<br />

also affect <strong>the</strong> reactor comptetion date.<br />

Knapp Mills, lnc.; has been selected as <strong>the</strong><br />

supplier of <strong>the</strong> lead shielding, which will be pre-<br />

formed and bolted to <strong>the</strong> reactor. It is proposed<br />

that only <strong>the</strong> side pieces be mounted on <strong>the</strong> ETU<br />

because of space and time considerations. No<br />

design drawings are available to describe <strong>the</strong><br />

water shield, but it is anticipated that this, too,<br />

will be prefabricated.<br />

A number of jigs and fixtures for use in assembly<br />

have been designed and are being procured. These<br />

include fixtures for assembling <strong>the</strong> reflector-<br />

moderator, assembly and checking fixtures for<br />

<strong>the</strong> main heat exchangers, templates and a gage<br />

for checking <strong>the</strong> shells, and several handling<br />

devices.<br />

An area in Building 9201-3 is now being modi-<br />

fied for use as a reactor assembly area. The<br />

area will be enclosed and air-conditioned, and<br />

it will be serviced by an overhead crane. It is<br />

anticipated that <strong>the</strong> area will be ready for use<br />

when <strong>the</strong> first reactor parts arrive in August.<br />

w<br />

%<br />

rn<br />

t

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!