05.08.2013 Views

ORNL-2106 - the Molten Salt Energy Technologies Web Site

ORNL-2106 - the Molten Salt Energy Technologies Web Site

ORNL-2106 - the Molten Salt Energy Technologies Web Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANP PROJECT PROCRESS REPORT<br />

1 2 5 10 2 5 102 2 5<br />

TIME (sec)<br />

EeoRH<br />

<strong>ORNL</strong>-LR-DWG (4919<br />

2 5 io4<br />

Fig. 1.2.4. Power Density in <strong>the</strong> Off-Gas Line as a Function of Time and Gas Volume in <strong>the</strong> Ex-<br />

pansion Tank for a Fuel Flow Rate of 22 gpm.<br />

The activities to be expected at shutdown and<br />

100 and 300 days after shutdown for reactor oper-<br />

ating periods of 500 and lo00 hr at 60 Mw are<br />

presented in Table 1.2.3, which also gives <strong>the</strong><br />

average beta-ray energies, <strong>the</strong> gamma-ray energies,<br />

and <strong>the</strong> gamma-ray yields in photons per 100<br />

disintegrations. It has been assumed that, at<br />

shutdown, <strong>the</strong> fuel is dumped instantaneously SO<br />

that no more plating takes place. Also, <strong>the</strong><br />

activities of RhlOBm and Rh106 are zero at shut-<br />

38<br />

down, since <strong>the</strong>se nuclides are carried away with<br />

<strong>the</strong> fuel and have a chance to build up only when<br />

<strong>the</strong>ir precursors decay.<br />

The gamma activity at 100 days after shutdown<br />

for 500 hr of operation at 60 Mw is approximately<br />

2 x 105 curies, and at 300 days after shutdown,<br />

for <strong>the</strong> same operating conditions, it is about<br />

8 x IO3 curies. These high activities at times<br />

long after shutdown must be contended with in<br />

any disassembly procedure suggested for <strong>the</strong> ART.<br />

W<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!