ARTICLE: 3<br />

3 CONDITIONS SUBSEQUENT<br />

3.1 Satisfaction <strong>of</strong> conditions subsequent by the TSP<br />

Draft Standard Transmission Services Agreement<br />

3.1.1 Within thirty (30) days from the date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> Intent , the<br />

Selected Bidder, on behalf <strong>of</strong> the TSP shall provide the Contract<br />

Per<strong>for</strong>mance Guarantee, acquire <strong>for</strong> the Acquisition Price, one hundred<br />

percent (100%) equity shareholding <strong>of</strong> …………….… [Insert Name <strong>of</strong> the<br />

SPV] from ………..…….. [Insert name <strong>of</strong> holding company <strong>of</strong> the SPV],<br />

who shall sell to the Selected Bidder, the equity shareholding <strong>of</strong><br />

…………….… [Insert Name <strong>of</strong> the SPV], along with all its related assets<br />

and liabilities, and apply to the Appropriate Commission <strong>for</strong> grant <strong>of</strong><br />

Transmission License.<br />

The Selected Bidder on behalf <strong>of</strong> the TSP will provide to the Long Term<br />

Transmission Customers the Contract Per<strong>for</strong>mance Guarantee <strong>for</strong> an<br />

aggregate amount <strong>of</strong> Rs. …………………….. Crores (Rupees<br />

………………………….. Crores only) [BPC to insert value both in<br />

numbers and figures] [Contract Per<strong>for</strong>mance Guarantee would be<br />

computed on the basis <strong>of</strong> Rs. 6 lakhs per km <strong>for</strong> the total Transmission<br />

Line length (including all 765 kV, 400 kV and other lines irrespective <strong>of</strong><br />

conductors per phase, substations, switching stations, trans<strong>for</strong>mers etc.)<br />

<strong>of</strong> the Project], which shall be provided separately to each <strong>of</strong> the Long<br />

Term Transmission Customers <strong>for</strong> the amount calculated pro-rata in the<br />

ratio <strong>of</strong> their Allocated Project Capacity, as on the date seven (7) days<br />

prior to the Bid Deadline (rounded <strong>of</strong>f to the nearest Rupees one Lakh<br />

(Rs. 100,000) with the principle that amounts below Rupees Fifty<br />

Thousand (Rs. 50,000) shall be rounded down and amounts <strong>of</strong> Rupees<br />

Fifty Thousand (Rs. 50,000) and above shall be rounded up).<br />

3.1.2 The Contract Per<strong>for</strong>mance Guarantee shall be initially valid <strong>for</strong> a period<br />

up to three (3) months after the Scheduled COD <strong>of</strong> the Project and shall<br />

be extended from time to time to be valid <strong>for</strong> a period up to three (3)<br />

months after the COD <strong>of</strong> the Project. In case the validity <strong>of</strong> the Contract<br />

Per<strong>for</strong>mance Guarantee is expiring be<strong>for</strong>e the validity specified in this<br />

Article, the TSP shall, at least thirty (30) days be<strong>for</strong>e the expiry <strong>of</strong> the<br />

Contract Per<strong>for</strong>mance Guarantee, replace the Contract Per<strong>for</strong>mance<br />

Guarantee with another Contract Per<strong>for</strong>mance Guarantee or extend the<br />

validity <strong>of</strong> the existing Contract Per<strong>for</strong>mance Guarantee until the validity<br />

period specified in this Article.<br />

3.1.3 The TSP agrees and undertakes to duly per<strong>for</strong>m and complete the<br />

following activities within six (6) months from the Effective Date, unless<br />

such completion is affected due to the Long Term Transmission<br />

Customers’ failure to comply with their obligations under Article 3.2 <strong>of</strong><br />

this Agreement or by any Force Majeure Event, or if any <strong>of</strong> the activities<br />

is specifically waived in writing by the Majority Long Term Transmission<br />

Customers:<br />