One 2.50 Km long tunnel with <strong>Power</strong> House<br />
on the right bank <strong>of</strong> river Dikrong near<br />
Choppo Village at a distance <strong>of</strong> about 12<br />
Km. from Doimukh has been proposed. Cost<br />
estimate for Stage – I activities <strong>of</strong> the project<br />
has been approved by CEA in Nov’ 02. The<br />
amount has been kept to carry out the<br />
activities such as observation <strong>of</strong> Hydro –<br />
meteorological data, Discharge data & Silt<br />
data . Drilling and Drifting works , access<br />
road, temporary road, Environmental impact<br />
studies will be continued. Feasibility Report<br />
<strong>of</strong> the project has been submitted to CEA<br />
on 22.03.04. Cost estimate for 2nd Stage<br />
activities amounting to Rs.7.46Crs.has been<br />
submitted to CEA on 02.04.04.<br />
4. SURVEY & INVESTIGATION WORKS:<br />
Survey and investigation works <strong>of</strong> the<br />
following schemes are going on.<br />
i. Papumpam H.E.Project (60MW), Arunachal<br />
Pradesh.<br />
ii. Hirit H.E.Project (50MW), Arunachal<br />
Pradesh.<br />
The status <strong>of</strong> submission <strong>of</strong> PFRs to CEA are as follows:-<br />
iii. Kameng Dam H.E.Project (600MW),<br />
Arunachal Pradesh.<br />
iv. Bhareli Dam – I H.E.Project (1120MW),<br />
Arunachal Pradesh.<br />
v. Bhareli Dam – II H.E.Project (600MW),<br />
Arunachal Pradesh.<br />
vi. Tenga H.E.Project (600MW), Arunachal<br />
Pradesh.<br />
vii. Papu H.E.Project (200MW), Arunachal<br />
Pradesh.<br />
viii. Talong H.E.Project (300MW), Arunachal<br />
Pradesh.<br />
ix. Kapak Leyak H.E.Project (160MW),<br />
Arunachal Pradesh.<br />
PROJECTS UNDER PRE – FEASIBILITY<br />
STUDIES:<br />
Under the 50,000 MW Hydro – electric Initiative<br />
launched by the Hon’ble Prime Minister, NEEPCO<br />
has been entrusted the work <strong>of</strong> preparation <strong>of</strong><br />
18 Pre – Feasibility Reports <strong>of</strong> development <strong>of</strong><br />
hydroelectric projects in the states <strong>of</strong> Arunachal<br />
Pradesh & Nagaland.<br />
Sl. Name <strong>of</strong> Project State Installed Remarks<br />
No Capacity (MW)<br />
IN THE 1 ST PHASE<br />
1. Bhareli Dam - II H.E.Project Arunachal Pradesh 600 Submitted on 30.09.03<br />
2. Kameng Dam H.E.Project Arunachal Pradesh 600<br />
3. Tenga H.E.Project Arunachal Pradesh 600<br />
4. Papu H.E.Project Arunachal Pradesh 200<br />
5. Talong H.E.Project Arunachal Pradesh 300<br />
6. Kapak Leyak H.E.Project Arunachal Pradesh 160<br />
IN THE 2ND PHASE<br />
1 Pakke Arunachal Pradesh 110 Submitted on 28.11.03<br />
2 Seba Arunachal Pradesh 80<br />
3 Bhareli – I Arunachal Pradesh 1120<br />
4 Utung Arunachal Pradesh 110 Submitted on 30.01.04<br />
5 Chanda Arunachal Pradesh 110 Submitted on 25.02.04<br />
6 Badao Arunachal Pradesh 120 Submitted on 27.02.04<br />
IN THE 3RD PHASE<br />
1. Yangnyu Storage Nagaland 135 Will be submitted in April ‘ 04<br />
2. Tizu Nagaland 365<br />
3. Dikhu Dam Nagaland 470<br />
4. Kimi H.E.Project Arunachal Pradesh 535 Assessed as not feasible.<br />
The replacement for these<br />
schemes will be provided<br />
by CEA.<br />
5. Bichom – II Arunachal Pradesh 205<br />
6. Bichom Storage - I Arunachal Pradesh 190<br />
TOTAL 6010<br />
93