One 2.50 Km long tunnel with <strong>Power</strong> House<br />

on the right bank <strong>of</strong> river Dikrong near<br />

Choppo Village at a distance <strong>of</strong> about 12<br />

Km. from Doimukh has been proposed. Cost<br />

estimate for Stage – I activities <strong>of</strong> the project<br />

has been approved by CEA in Nov’ 02. The<br />

amount has been kept to carry out the<br />

activities such as observation <strong>of</strong> Hydro –<br />

meteorological data, Discharge data & Silt<br />

data . Drilling and Drifting works , access<br />

road, temporary road, Environmental impact<br />

studies will be continued. Feasibility Report<br />

<strong>of</strong> the project has been submitted to CEA<br />

on 22.03.04. Cost estimate for 2nd Stage<br />

activities amounting to Rs.7.46Crs.has been<br />

submitted to CEA on 02.04.04.<br />

4. SURVEY & INVESTIGATION WORKS:<br />

Survey and investigation works <strong>of</strong> the<br />

following schemes are going on.<br />

i. Papumpam H.E.Project (60MW), Arunachal<br />

Pradesh.<br />

ii. Hirit H.E.Project (50MW), Arunachal<br />

Pradesh.<br />

The status <strong>of</strong> submission <strong>of</strong> PFRs to CEA are as follows:-<br />

iii. Kameng Dam H.E.Project (600MW),<br />

Arunachal Pradesh.<br />

iv. Bhareli Dam – I H.E.Project (1120MW),<br />

Arunachal Pradesh.<br />

v. Bhareli Dam – II H.E.Project (600MW),<br />

Arunachal Pradesh.<br />

vi. Tenga H.E.Project (600MW), Arunachal<br />

Pradesh.<br />

vii. Papu H.E.Project (200MW), Arunachal<br />

Pradesh.<br />

viii. Talong H.E.Project (300MW), Arunachal<br />

Pradesh.<br />

ix. Kapak Leyak H.E.Project (160MW),<br />

Arunachal Pradesh.<br />

PROJECTS UNDER PRE – FEASIBILITY<br />

STUDIES:<br />

Under the 50,000 MW Hydro – electric Initiative<br />

launched by the Hon’ble Prime Minister, NEEPCO<br />

has been entrusted the work <strong>of</strong> preparation <strong>of</strong><br />

18 Pre – Feasibility Reports <strong>of</strong> development <strong>of</strong><br />

hydroelectric projects in the states <strong>of</strong> Arunachal<br />

Pradesh & Nagaland.<br />

Sl. Name <strong>of</strong> Project State Installed Remarks<br />

No Capacity (MW)<br />

IN THE 1 ST PHASE<br />

1. Bhareli Dam - II H.E.Project Arunachal Pradesh 600 Submitted on 30.09.03<br />

2. Kameng Dam H.E.Project Arunachal Pradesh 600<br />

3. Tenga H.E.Project Arunachal Pradesh 600<br />

4. Papu H.E.Project Arunachal Pradesh 200<br />

5. Talong H.E.Project Arunachal Pradesh 300<br />

6. Kapak Leyak H.E.Project Arunachal Pradesh 160<br />

IN THE 2ND PHASE<br />

1 Pakke Arunachal Pradesh 110 Submitted on 28.11.03<br />

2 Seba Arunachal Pradesh 80<br />

3 Bhareli – I Arunachal Pradesh 1120<br />

4 Utung Arunachal Pradesh 110 Submitted on 30.01.04<br />

5 Chanda Arunachal Pradesh 110 Submitted on 25.02.04<br />

6 Badao Arunachal Pradesh 120 Submitted on 27.02.04<br />

IN THE 3RD PHASE<br />

1. Yangnyu Storage Nagaland 135 Will be submitted in April ‘ 04<br />

2. Tizu Nagaland 365<br />

3. Dikhu Dam Nagaland 470<br />

4. Kimi H.E.Project Arunachal Pradesh 535 Assessed as not feasible.<br />

The replacement for these<br />

schemes will be provided<br />

by CEA.<br />

5. Bichom – II Arunachal Pradesh 205<br />

6. Bichom Storage - I Arunachal Pradesh 190<br />

TOTAL 6010<br />

93