Sl No Name <strong>of</strong> the <strong>Power</strong> Stations Generation Target Actual Generation<br />
(01.01.03 to 31.03.04) (01.01.03 to 31.03.04)<br />
B) THERMAL<br />
v) Assam Gas Based <strong>Power</strong> Station<br />
(291 MW), Assam.<br />
2003.32 MU 1998 MU<br />
vi) Agartala Gas Turbine <strong>Power</strong> Station<br />
(84 MW), Tripura.<br />
663.00 MU 735 MU<br />
Sub – Total (B) 2666.32 MU 2733 MU<br />
TOTAL (A+B) 5009.32 MU 4857 MU<br />
Total earnings is Rs. 797.10 Crs. (Provisional) in<br />
terms <strong>of</strong> sale <strong>of</strong> <strong>Power</strong> during 1st January’03 to<br />
March’ 04. Earnings from Kopili H.E. Project is<br />
Rs. 70.20Crs., Assam Gas Based <strong>Power</strong> Project<br />
is Rs. 364.87Crs., Agartala Gas Turbine Project<br />
is Rs. 133.98Crs., Doyang H.E. Project is<br />
Rs.32.66Crs., Ranganadi H.E Project is<br />
Rs.170.81Crs. and UI Charges (Net) is<br />
Rs.24.58Crs.<br />
2. PROJECTS UNDER EXECUTION<br />
i) TUIRIAL H.E. PROJECT (60 MW) -<br />
MIZORAM: The Tuirial H.E. Project in<br />
Mizoram is located in the Border <strong>of</strong> Cachar<br />
District <strong>of</strong> Assam and Aizwal District <strong>of</strong><br />
Mizoram and envisages construction <strong>of</strong> a<br />
77 M high Homogenous Earth fill Dam<br />
across the Tuirial river with an installed<br />
capacity <strong>of</strong> 2 x 30 MW, surface <strong>Power</strong><br />
House on the left bank <strong>of</strong> the river. The<br />
cost <strong>of</strong> the Project at June’ 97 price level is<br />
Rs. 368.72Crs.(including IDC) and completion<br />
cost <strong>of</strong> the Project is Rs.448.19Crs. at Jan<br />
’97 price level. The project has been taken<br />
up as a Central Sector Scheme under loan<br />
assistance <strong>of</strong> JBIC, Japan with 85% <strong>of</strong> the<br />
project cost being financed under JBIC loan<br />
assistance and balance 15% from Govt. <strong>of</strong><br />
India’s assistance. The infrastructural work<br />
for the project has been completed. All 5<br />
(five) Packages have been awarded and work<br />
<strong>of</strong> the project is in progress. Land<br />
acquisition for the project area is completed<br />
and for submergence area is in progress.<br />
The project is scheduled to be<br />
ii)<br />
commissioned in 2006 – 07.<br />
KAMENG H.E. PROJECT (600 MW) -<br />
ARUNACHAL PRADESH: The proposed<br />
Kameng H.E. Project is located in the West<br />
Kameng district <strong>of</strong> Arunachal Pradesh. The<br />
project comprises <strong>of</strong> construction <strong>of</strong> a 96.50<br />
M. high concrete gravity Dam across the<br />
river Bichom and diverting the water through<br />
a 6.70 M. dia., 8.75 km long Tunnel to<br />
Tenga reservoir created by constructing a<br />
60.50 M. high concrete gravity Dam across<br />
the Tenga river. Water <strong>of</strong> both these rivers<br />
is proposed to be taken through a 7.0 M.<br />
dia, 5.86 km long HRT to Kimi <strong>Power</strong> House<br />
with an installed capacity <strong>of</strong> 4 x 150 MW =<br />
600 MW. Infrastructure works under 2nd Stage are nearing completion and 432.56<br />
Ha <strong>of</strong> land has been acquired by NEEPCO.<br />
Pre- PIB meeting for investment decision<br />
was held on 6.10.2003 and the PIB note<br />
was circulated. Tender for all Packages have<br />
been floated. Techno - Commercial Bids <strong>of</strong><br />
Package – I, II & III were opened on<br />
30.01.04 and evaluation completed. Price Bid<br />
shall be opened on 08.04.04. Techno -<br />
Commercial Bids <strong>of</strong> Packages – IV & V<br />
were opened on 27.02.04 and evaluation is<br />
under progress. Award <strong>of</strong> work is in process<br />
and construction activities for the plant will<br />
start immediately after obtaining CCEA<br />
clearance.<br />
iii) TRIPURA GAS TURBINE POWER<br />
PROJECT (280MW) - TRIPURA: Tripura<br />
Gas Turbine Project is located at Manarchak<br />
in Tripura and its phased capacity will<br />
depend on availability <strong>of</strong> gas. Techno –<br />
Economic clearance from CEA has been<br />
obtained on 25.04.03. All statutory and nonstatutory<br />
clearances, including MOEF<br />
clearances, have been obtained. Pre – PIB<br />
meeting was held on 20.06.03 and the<br />
project is posed for PIB clearance. The<br />
consultancy works <strong>of</strong> the project has been<br />
awarded to CEA and MOU for the same<br />
signed on 08.10.03. PTC shall trade the<br />
power outside NE Region and the States <strong>of</strong><br />
Tripura, Assam, Punjab and Haryana have<br />
given their consent letters for taking power<br />
from the project. NIT for EPC contract was<br />
floated on 06.11.03 and the same will be<br />
opened on 30.04.04. 80.735 Ha <strong>of</strong> land has<br />
already acquired for the project by NEEPCO.<br />
Evacuation <strong>of</strong> power from this project is<br />
being finalised by PGCI. Bilateral power<br />
trading agreement between PGCIL &<br />
91