90<br />
North Eastern Electric <strong>Power</strong> Corporation Ltd.<br />
(NEEPCO) Shillong.<br />
North Eastern Electric <strong>Power</strong> Corporation Ltd.<br />
(NEEPCO) was constituted in 1976 under the<br />
company’s act 1956 with the objective <strong>of</strong><br />
developing the power potential <strong>of</strong> the North<br />
Eastern Region <strong>of</strong> the country through planned<br />
development <strong>of</strong> power generation projects which<br />
in turn would effectively promote the development<br />
<strong>of</strong> the North Eastern Region. Since then<br />
NEEPCO has grown into one <strong>of</strong> the pioneer<br />
public sectors with an authorised share capital<br />
<strong>of</strong> Rs. 3500.00Crs. and having an installed<br />
capacity <strong>of</strong> 1130MW (755 MW hydro & 375 MW<br />
thermal) meets more than 50% <strong>of</strong> the energy<br />
requirements <strong>of</strong> the NE Region. The main<br />
objectives <strong>of</strong> Corporation are to add to the power<br />
generating capacity in the North Eastern Region<br />
by ensuring optimum utilisation <strong>of</strong> commissioned<br />
generation projects, to generate adequate internal<br />
resources ensuring justifiable return on<br />
investment, to continue sustained efforts to obtain<br />
POWER GENERATION:<br />
During the period from 1st January’ 03 to 31st March ‘ 04, NEEPCO generated 2124 MU from<br />
hydro stations against a target <strong>of</strong> 2343 MU and<br />
2733 MU from thermal stations against a target<br />
Chapter - 21.6<br />
the receivables from State Electricity Boards /<br />
Departments and to undertake long term feasibility<br />
studies for optimum development <strong>of</strong> hydro power<br />
resources <strong>of</strong> the North Eastern Region.<br />
1. CAPACITY ADDITION PROGRAMME FOR<br />
THE 10TH PLAN:<br />
During 9th Plan, NEEPCO added 754 MW<br />
(174 MW Thermal and 580 MW Hydro<br />
<strong>Power</strong>) as per the capacity addition<br />
programme. The proposed capacity addition<br />
during the 10th Plan has been fixed as 365<br />
MW (280 MW Thermal and 85 MW Hydro).<br />
Out <strong>of</strong> this, Kopili H.E. <strong>Power</strong> Station – 2nd Stage with one unit <strong>of</strong> 25MW has already<br />
been commissioned.<br />
2. PROJECTS UNDER OPERATION AND<br />
MAINTENANCE :<br />
The following completed Projects are under<br />
Operation and Maintenance:<br />
SI No. Name <strong>of</strong> the Projects State Installed Capacity<br />
1 Kopili Hydro Electric <strong>Power</strong> Station Assam 150 MW<br />
2 Kopili H.E. <strong>Power</strong> Station - Ist Stage Extension. Assam 100 MW<br />
3 Assam Gas Based <strong>Power</strong> Station. Assam 291 MW<br />
4 Agartala Gas Turbine <strong>Power</strong> Station. Tripura 84 MW<br />
5 Doyang Hydro Electric <strong>Power</strong> Station. Nagaland 75 MW<br />
6 Ranganadi Hydro Electric <strong>Power</strong> Station. Arunachal Pradesh 405 MW<br />
7 Kopili H.E <strong>Power</strong> Station – 2nd Stage. Assam 25 MW<br />
TOTAL 1130 MW<br />
<strong>of</strong> 2666.32 MU. The cumulative generation since<br />
inception till 31 st March ‘ 04 from NEEPCO <strong>Power</strong><br />
Stations was 26395 MUs. Station wise target<br />
Vs achievement from 1 st January ‘ 03 to 31 st<br />
March ‘ 04 are given below.<br />
Sl No Name <strong>of</strong> the <strong>Power</strong> Stations Generation Target Actual Generation<br />
(01.01.03 to 31.03.04) (01.01.03 to 31.03.04)<br />
A) HYDRO<br />
i) Kopili Hydro Electric <strong>Power</strong> Station<br />
(150 MW), Assam.<br />
633 MU 500 MU<br />
ii) Kopili H.E.<strong>Power</strong> Station – 1st stage<br />
Extension (100MW), Assam.<br />
414 MU 452 MU<br />
iii) Doyang Hydro Electric <strong>Power</strong> Station<br />
(75 MW), Nagaland<br />
196 MU 167 MU<br />
iv) Ranganadi Hydro Electric <strong>Power</strong><br />
Station (405 MW), Arunachal Pradesh.<br />
1100 MU 1005 MU<br />
Sub – Total (A) 2343 MU 2124 MU