Introduction <strong>of</strong> High Temperature<br />

Endurance Conductors - Use <strong>of</strong> special<br />

aluminum alloy strands, INVAR reinforced<br />

conductors can be operated at temperature<br />

level up to 230º C as against 85/95º C for<br />

normal ACSR Conductor. These conductors<br />

<strong>of</strong>fer thermal capacity <strong>of</strong> the order <strong>of</strong> 2 to 3<br />

times <strong>of</strong> ACSR for same diameter and<br />

comparable mechanical strengths. Use <strong>of</strong><br />

INVAR conductor in Indian power system<br />

has been taken up on experimental basis.<br />

Use <strong>of</strong> Compact towers for transmission<br />

lines has reduced ROW requirement from<br />

85 m to 64 m ( a reduction <strong>of</strong> 25% )<br />

HotLine Maintenance – An excellent O&M<br />

practice that has enhanced the availability<br />

<strong>of</strong> POWERGRID’s Transmission System.<br />

Hotline washing by helicopters<br />

Use <strong>of</strong> helicopters for hotline washing in<br />

geographically tough terrains, has facilitated<br />

the process, on many occasions in a much<br />

easier way.<br />

Erection <strong>of</strong> Emergency Restoration<br />

System by helicopter<br />

The devastation caused by cyclone <strong>of</strong><br />

Gujarat in June 1999, Orissa in October<br />

1999 and earthquake <strong>of</strong> Gujarat in 2001 was<br />

attended by POWERGRID on war footing<br />

and normalcy was restored within few days<br />

which otherwise would have taken several<br />

months, using Emergency Restoration<br />

System. Use <strong>of</strong> helicopters facilitates ERS<br />

in geographically tough terrains.<br />

UPGRADING & UPRATING OF<br />

TRANSMISSION LINES<br />

Feasibility studies for Upgrading & Uprating<br />

<strong>of</strong> Transmission Lines have already been<br />

completed by POWERGRID for following<br />

voltage level:<br />

1. 66kV D/C to 132kV D/C<br />

2. 110kV D/C to 132kV D/C<br />

3. 132kV D/C to 400kV S/C<br />

4. 220kV D/C to 400kV S/C (Already<br />

implemented on Kishtwar-Kishenpur Line)<br />

Implementation <strong>of</strong> these is proposed to be<br />

undertaken on need basis. Further, Feasibility<br />

studies for converting 400 kV Double Circuit lines<br />

to HVDC Bi-poles are also underway.<br />

Modern survey techniques for<br />

Transmission Line<br />

POWERGRID explored use <strong>of</strong> satellite<br />

imageries for route alignment and preliminary<br />

survey for its transmission lines and Air<br />

Borne Laser Terrain Mapping (ALTM)<br />

techniques in association with National<br />

Remote Sensing Agency (NRSA) and<br />

activities have been initiated to undertake<br />

surveys using these techniques for the<br />

forthcoming Parbati-II, Barh and Kudankulam<br />

Projects.<br />

E-GOVERNANCE<br />

POWERGRID is systematically developing<br />

competency to deploy Information Technology for<br />

efficient and effective discharge <strong>of</strong> its functions.<br />

Some <strong>of</strong> the salient achievements are Web<br />

based Enterprise wide Information Portal as a<br />

step towards E-Governance, State-<strong>of</strong>-the-Art Multi<br />

Locational Video Conferencing System,<br />

Inspection Management System on internet<br />

based B2B platform, Engineering Project<br />

management system developed in-house,<br />

Enterprise wide Converged IT and Communication<br />

System, Establishment <strong>of</strong> state-<strong>of</strong>-the-art 1200<br />

node IT network infrastructure at Gurgaon <strong>of</strong>fice<br />

complex with innovative features like Wi-Fi.<br />

POWERGRID has also initiated implementation<br />

<strong>of</strong> ERP.<br />

POWERGRID implemented Video conferencing<br />

facility in the capacity <strong>of</strong> technical expert cum<br />

co-ordinator for MOP and CPSUs under MOP<br />

and successfully completed the first consultancy<br />

venture in IT for M/s Delhi Transco Ltd.<br />

CONTRIBUTING TO DISTRIBUTION REFORMS<br />

UNDER APDRP<br />

Under Accelerated <strong>Power</strong> Development &<br />

Reforms Program (APDRP) <strong>of</strong> <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>,<br />

POWERGRID has been assigned the role <strong>of</strong><br />

Advisor-cum-Consultant (AcC) to lend its<br />

managerial and technical expertise for developing<br />

105 distribution circles spread over 18 States.<br />

During 2003-04, APDRP Schemes for 35 Circles/<br />

towns amounting to Rs. 1558 Crore were<br />

approved where POWERGRID was Advisor cum<br />

Consultant. In addition, POWERGRID has<br />

undertaken implementation <strong>of</strong> APDRP schemes<br />

worth Rs. 663 Crore on bilateral basis, in the<br />

States <strong>of</strong> Bihar, Goa and Meghalaya.<br />

POWERGRID is also executing Rural<br />

Electrification works <strong>of</strong> 2400 villages in Bihar on<br />

behalf <strong>of</strong> BSEB costing about Rs. 178 Crore,<br />

covered under “Pradhan Mantri’s Gramodaya<br />

Yojana (PMGY)”.<br />

ENCOURAGING GRID DISCIPLINE<br />

POWERGRID, in its efforts to ensure delivery <strong>of</strong><br />

quality power and to maintain grid discipline,<br />

extended the implementation <strong>of</strong> Availability Based<br />