CWC with inputs <strong>of</strong> certain investigations results<br />
by NHPC. Recently CWC has changed Dam<br />
Axis. Tentative schedule for completion <strong>of</strong> DPR<br />
is June’04.<br />
12. Lakhwar Vyasi HE Project (420MW),<br />
Uttranchal.<br />
An MOU was signed on 1.11.2003 between<br />
NHPC and Government <strong>of</strong> Uttranchal. Collection<br />
<strong>of</strong> data/records for preparation <strong>of</strong> revised DPR is<br />
in progress.<br />
13. Kotlibhel HE Project (850 MW)<br />
Uttranchal Government has entrusted the<br />
Kotlibhel Project to NHPC and MOU was signed<br />
between NHPC and Uttranchal Government on<br />
22.9.03, which envisages cascade development<br />
<strong>of</strong> Kotlibhel Project. Stage-I estimate amounting<br />
to Rs.22.85 crorers for preparation <strong>of</strong> FR <strong>of</strong> the<br />
three stage <strong>of</strong> the project submitted to CEA on<br />
01.12.03. Based on reconnaissance survey and<br />
preliminary study, NHPC has proposed three<br />
stage development.<br />
A KOTLI BHEL STAGE-IA (At Mudeth): It is<br />
proposed to be constructed on river<br />
Bhagirathi, 2 kms upstream <strong>of</strong> Devprayag<br />
with an installed capacity <strong>of</strong> 300MW.<br />
B KOTLI BHEL SAGE-IB(At Pali) It is<br />
proposed to be constructed on river<br />
Alaknanda, 6 kms upstream <strong>of</strong> Devpryag<br />
with an installed capacity <strong>of</strong> 250 MW.<br />
C KOTLI BHEL SAGE-I I (Near Kaudiyala):<br />
It is proposed to be constructed on river<br />
Ganga, 20 Kms downstream <strong>of</strong> Devprayag<br />
with installed capacity <strong>of</strong> 300 MW.<br />
Site clearance (Stage-I) for Kotlibhel cascade<br />
scheme has been accorded by MOEF through<br />
their letter dated: 20.10.03. Survey &<br />
Investigation works are in progress.<br />
E JOINT VENTURE PROJECTS.<br />
1. Indira Sagar HE Project (8x125 MW),<br />
Madhya Pradesh<br />
The project is under execution by NHDC, a<br />
Joint Venture Company with equity<br />
participation <strong>of</strong> MOP/NHPC and GOMP<br />
incorporated in Aug. 2000 to take up<br />
execution <strong>of</strong> Indira Sagar HE Project (1000<br />
MW) and Omkareshwar Project (520 MW).<br />
The Government has accorded sanction for<br />
incorporation <strong>of</strong> NHDC and cost estimate<br />
for execution <strong>of</strong> Indira Sagar project in March,<br />
2002. The construction <strong>of</strong> all the project<br />
components are going as per approved<br />
2.<br />
schedule and the project is to be<br />
commissioned by May, 2005. However with<br />
the pace <strong>of</strong> the work, 4 Units <strong>of</strong> the project<br />
have already been commissioned by March<br />
2004 much ahead <strong>of</strong> schedule. The overall<br />
project is expected to be completed by<br />
December 2004.<br />
Omkareshwar HE Project (8x65 MW),<br />
Madhya Pradesh<br />
CCEA approval has been accorded on<br />
29.05.2003. Notification <strong>of</strong> award for the<br />
work <strong>of</strong> turnkey execution <strong>of</strong> (8x65 MW)<br />
520 MW Omkareshwar project has also been<br />
issued to M/s Jai Prakash – Voith Simens<br />
Consortium, New Delhi on 09.06.2003. The<br />
contractor has started mobilizing resources<br />
to take up construction <strong>of</strong> the project and<br />
many <strong>of</strong> construction activities have since<br />
been started in full swing. The infrastructure<br />
works are also in full swing.<br />
3 Purulia Pumped Storage Scheme (4x225<br />
MW), West Bengal.<br />
PIB meeting to consider formation <strong>of</strong> Joint<br />
Venture and investment decisions was held<br />
on 24.03.04. Minutes <strong>of</strong> meeting awaited.<br />
Tripartite <strong>Power</strong> Purchase Agreement with<br />
Govt. <strong>of</strong> W. B., WBPDC, for purchase <strong>of</strong><br />
input power and with Govt. <strong>of</strong> W.B., WBSEB<br />
for sale <strong>of</strong> generated power has been signed<br />
on 02.08.2003. CEA vide letter dated<br />
19.9.03, has expressed that point raised by<br />
it on Revised Cost Estimate have been<br />
resolved.<br />
F SMALL HYDROELECTRIC PROJECTS<br />
1. Kambang Small HE Project (6 MW), Ar.<br />
Pradesh<br />
The Project is under execution by NHPC<br />
on deposit basis from Arunachal State<br />
Government and construction works are<br />
going on in full swing. Commissioning <strong>of</strong><br />
the project is expected shortly.<br />
2 Sippi Small HE Project (4 MW), Ar.<br />
Pradesh<br />
The Project is under execution by NHPC<br />
on deposit basis from Arunachal State<br />
Government and construction works are<br />
going on in full swing. Commissioning <strong>of</strong><br />
the project is expected shortly.<br />
G DEVELOPMENT<br />
POWER<br />
OF GEOTHERMAL<br />
NHPC has been appointed as a Nodal<br />