National Hydroelectric <strong>Power</strong> Corporation Ltd.<br />
(NHPC)<br />
National Hydroelectric <strong>Power</strong> Corporation (NHPC)<br />
was set up in 1975. NHPC has become the<br />
largest organisation for Hydro <strong>Power</strong> development<br />
in India, with capabilities to undertake all the<br />
activities from conceptualization to commissioning<br />
<strong>of</strong> Hydro Projects. Execution <strong>of</strong> Geothermal and<br />
Tidal <strong>Power</strong> Projects in the country has also<br />
been included in the corporate objectives <strong>of</strong><br />
NHPC.<br />
NHPC is a Schedule “A” Enterprise <strong>of</strong> the<br />
Government <strong>of</strong> India with an Authorized Share<br />
Capital <strong>of</strong> Rs. 15,000 Crores and an Investment<br />
base more than Rs. 20,000 Crores.<br />
The Corporation has following operating power<br />
stations and under-construction projects -<br />
A. OPERATING POWER STATIONS<br />
Following eight Projects have been commissioned<br />
by NHPC in India :<br />
1. Baira Siul (HP)1 180 MW (3x60 MW)<br />
2. Loktak (Manipur) 105 MW (3x35 MW)<br />
3. Salal (J&K) 690 MW (6x115 MW)<br />
4. Chamera -I (HP) 540 MW (3x180 MW)<br />
5. Tanakpur (U’chal)1 120 MW (3 x 40 MW)<br />
6. Uri (J&K) 480 MW (4x120 MW)<br />
7. Rangit (Sikkim) 60 MW (3 x 20 MW)<br />
8. Chamera - II (HP) 300 MW (3x 100 MW)<br />
2475 MW<br />
During the current financial year (upto March<br />
2004), NHPC <strong>Power</strong> Stations generated 11045.52<br />
MU against the target <strong>of</strong> 9400 MU excluding a<br />
deemed generation <strong>of</strong> 70.82 MU.<br />
B. ONGOING PROJECTS<br />
(Status ending March 2004)<br />
1. Dulhasti HE Project (3x130 MW), J&K<br />
Excavation <strong>of</strong> Head Race Tunnel has been<br />
completed on 27.08.03. 5812m (58.42%) HRT<br />
Lining has been done till March 04. The balance<br />
lining work <strong>of</strong> HRT is expected to be completed<br />
by Nov.’04. All other works except HRT has<br />
already been completed.<br />
2. Dhauliganga HE Project, Stage-I (4x70<br />
MW) Uttaranchal<br />
Day Lighting <strong>of</strong> 5290 M long Head Race Tunnel<br />
achieved on 30.06.2003.Completion <strong>of</strong> 437 M long<br />
Tail Race Tunnel Concrete lining in May 2003.<br />
Chapter - 21.2<br />
985500 cum (98.55%) <strong>of</strong> Spillway Excavation<br />
has been done. 8, 30,500 cum (83.05%) <strong>of</strong><br />
Dam embankment placement has been done .<br />
Flip Bucket Excavation completed in May<br />
2003.Concrete lining <strong>of</strong> Silt flushing Tunnel has<br />
been completed in October 2003.Concrete lining<br />
<strong>of</strong> 112 M long Intake Tunnel-I and 96 M long<br />
Intake Tunnel-II has been completed in<br />
September 2003 and May 2003 respectively.4416<br />
M (83.47%) concrete lining <strong>of</strong> Head race Tunnel<br />
has been done. Surge Shaft excavation has been<br />
completed in November 2003. 52M Surge Shaft<br />
lining has been achieved out <strong>of</strong> 95m. Steel<br />
liner erection in pressure shafts has been<br />
completed. Erection <strong>of</strong> generating units is in<br />
progress. The project is scheduled to be<br />
commissioned by March’05.<br />
3. Chamera HE Project Stage-II (300 MW),<br />
HP<br />
The Project is being executed on Turnkey basis<br />
and agreements with the consortium members<br />
were signed on 18.7.99. M/s Indo Canadian<br />
Hydro Consortium. The Project has been<br />
commissioned ahead <strong>of</strong> schedule. The Project<br />
was dedicated to the Nation by Hon’ble Prime<br />
Minister <strong>of</strong> India on 9.2.2004.<br />
4. Teesta HE Project Stage-V (3x170 MW),<br />
Sikkim<br />
Teesta –V located in East Sikkim is a run <strong>of</strong><br />
river peaking scheme on Teesta river. The project<br />
is to generate 2573 MUs <strong>of</strong> Energy in a 90 %<br />
dependable year. All the major works are going<br />
as per schedule and Project is expected to be<br />
completed as per schedule i.e. by Feb. 07.<br />
5. Teesta Low Dam Project, Stage-III (132<br />
MW), West Bengal.<br />
Teesta Low Dam Project-III (132 MW) was<br />
entrusted to NHPC on 15th Nov. 2000. Govt.<br />
accorded CCEA clearance on 30/10/2003 with<br />
completion schedule <strong>of</strong> Project as March 2007.<br />
Major Civil Works have been awarded in Oct’03.<br />
6. Subansiri (Lower) HE Project (2000 MW)<br />
Ar. Pradesh.<br />
Subansiri Lower HE Project (2000 MW) was<br />
entrusted to NHPC on 1st May 2000 Govt.<br />
accorded CCEA clearance on 9th Sept. 2003<br />
with completion period <strong>of</strong> Project in 7 years.<br />
Major civil works have been awarded.<br />
73