66<br />

8 Kahalgaon-II TPP,Ph-II, Bihar Coal 500<br />

9 Sipat-II TPP,Chattisgarh Coal 1000<br />

NEW PROJECTS<br />

1 Sipat-I TPP, Chattisgarh@ Coal 1980<br />

2 Barh TPP,Bihar Coal 1980<br />

3 North Karanpura TPP, Jharkhand Coal 1980<br />

4 Kawas-II CCPP,Gujarat LNG/ Natural Gas 1300<br />

5 Gandhar-II CCPP,Gujarat LNG/ Natural Gas 1300<br />

6 Loharinag Pala HEPP,Uttaranchal Hydro 600<br />

7 Tapoban Vishnugad HEPP,Uttaranchal Hydro 520<br />

8 Kayamkulam CCPP-II,Kerala LNG/ Natural Gas 1950<br />

9 LataTapovan HEPP, Uttaranchal # Hydro 108<br />

10 Nabinagar TPP, Bihar (Under JV) Coal 1000<br />

11 Bhilai CPP-II, Chattisgarh (Under JV) Coal 500<br />

12 Ennore TPP,Tamil Nadu (Under JV) Coal 1000<br />

* 1000 MW already commissioned<br />

Note : JV – Joint Venture<br />

# Thru NTPC Hydro Ltd. –a wholly owned subsidiary <strong>of</strong> NTPC<br />

@ The Investment approval for Sipat-I TPP has been accorded and the main plant contract for SG<br />

package and TG package have been awarded in April,2004<br />

A) ON-GOING PROJECTS — 8,010 MW<br />

8010 MW capacities for Talcher-II (Out <strong>of</strong><br />

totalcapacity <strong>of</strong> 2000 MW for Talcher-II, 1000<br />

MW has been already commissioned),<br />

Rihand-II, Ramagundam-III, Koldam HEPP,<br />

Vindhyachal-III, Kahalgaon-II, Sipat-II and<br />

Unchahar-III is already under construction:<br />

Talcher-II (4x500 MW), Orissa<br />

Commissioning Schedule : Unit-V (May’ 2005)<br />

Unit-VI (February<br />

‘2006)<br />

Present Status : Unit-III and IV are<br />

under Commercial<br />

operation. Erection<br />

work is in progress<br />

as per schedule for<br />

Unit-V & VI.<br />

Ramagundam-III (1x500 MW), Andhra<br />

Pradesh<br />

Commissioning Schedule : Unit-VII (August<br />

2005)<br />

Present Status : Civil construction<br />

and erection work<br />

is in progress as<br />

per schedule.<br />

Rihand-II (2x500 MW), Uttar Pradesh<br />

Commissioning Schedule : Unit-III (August<br />

2005)<br />

Unit-IV (May 2006)<br />

Present Status : Civil construction<br />

and erection work<br />

in both the units is<br />

in progress as per<br />

schedule.<br />

Koldam HEPP (4X200 MW), Himachal Pradesh<br />

Commissioning Schedule : Unit-I (November<br />

2008)<br />

Unit-II (January<br />

2009)<br />

Unit-III (March 2009)<br />

Unit-IV (April 2009)<br />

Present Status : - Main dam<br />

package has been<br />

awarded Dec.’03<br />

and excavation<br />

work has been<br />

taken up.<br />

- Price bids for<br />

<strong>Power</strong> House &<br />

penstock package<br />

opened on 31 st<br />

Mar’2004.Price bids<br />

for Electromechanical<br />

Pkg<br />

have been opened<br />

on 5 th April’2004.<br />

- NIT for desilting<br />

arrangement<br />

package has been<br />

issued on 31 st<br />

Mar’2004.