Details <strong>of</strong> Schemes cleared techno-economically by CEA during 1.1.2003 - 31.3.2003<br />
HYDRO SCHEMES<br />
Annexure - I<br />
Sl.No. Name <strong>of</strong> Scheme/State/ Installed Estimated Date<br />
Executing Agency Capacity Completion <strong>of</strong> CEA<br />
(MW) Cost Clearance<br />
1. Subansiri Lower HEP in 8x250 US$39.648 M 13.01.2003<br />
Arunachal Pradesh/Assam =2000 +Rs.6418.37 Crs.<br />
by NHPC (12/02 PL)<br />
2. Tipaimukh HEP in Manipur 6x250<br />
= Rs. 6608.68 Crs.<br />
Rs.5163.86 Crs. 20.1.2003<br />
by NEEPCO =1500 (12/02 PL) (Techno-economic<br />
appraisal found<br />
in order)<br />
2.7.03 (TEC)<br />
3. Jalaput Dam Toe HEP in 3x6 Rs.69.68 Crs. 31.1.03<br />
Orissa/AP by M/s Orissa =18 (Completed Cost)<br />
<strong>Power</strong> Consortium Ltd.<br />
4. Karcham Wangtoo HEPIn H.P. 4x250 US$117.44 M 31.3.03<br />
by M/s Jaypee Karcham Hydro =1000 +Rs.5345.88 Crs.<br />
Corpn. Ltd. (M/s JKHCL) =Rs.5909.59 Crs<br />
(Completed Cost)<br />
SUB-TOTAL (HYDRO) 4518 MW<br />
THERMAL SCHEMES<br />
Sl.No. Name <strong>of</strong> Scheme/State/ Installed Estimated Date<br />
Executing Agency Capacity Completion <strong>of</strong> CEA<br />
(MW) Cost Clearance<br />
1 Anpara ‘C’ TPS in U.P. by 2x500 Jap.Yen B 35.657 16.1.2003<br />
UPRVUNL =1000 + Rs.2100.233 Crs.<br />
(Completed Cost)<br />
=Rs. 3526.51 Crs.<br />
2 Vijayawada TPS-Stage-IV 1x660 Euro231.730 M 28.2.2003<br />
in A.P. by APGENCO =660 +Rs.1600.609 Crs.<br />
(Completed Cost)<br />
=Rs. 2705.73 Crs.<br />
3 Kutch Lignite TPS Extn 1x75 Rs.304.69 Crs. 6.3.2003<br />
(Unit 4) in Gujarat by GEB =75 (Completed Cost)<br />
Sub Total (T) 1735 MW<br />
GRAND Total (H+T) 6253 MW<br />
57