Untitled - Ministry of Power
Untitled - Ministry of Power
Untitled - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Apart from the above functions CEA also<br />
undertakes design and engineering <strong>of</strong> power<br />
projects with a view to develop in house technical<br />
know-how and also to assist the State Electricity<br />
Boards, Generating Companies & State<br />
authorities requiring such assistance . Besides<br />
this, the monitoring <strong>of</strong> fly-ash generation by coal<br />
/lignite thermal power projects is being carried<br />
out on all India basis.<br />
Subordinate Offices:<br />
1. Northern Regional Electricity Board, New<br />
Delhi<br />
2. Western Regional Electricity Board, Mumbai<br />
3. Southern Regional Electricity Board,<br />
Bangalore<br />
4. Eastern Regional Electricity Board,Kolkatta<br />
5. North-Eastern Regional Electricity Board,<br />
Shillong<br />
6. Regional <strong>Power</strong> Survey Office, New Delhi<br />
7. Regional <strong>Power</strong> Survey Office, Bangalore<br />
8. Regional <strong>Power</strong> Survey Office, Mumbai<br />
9. Regional <strong>Power</strong> Survey Office, Kolkatta<br />
10. Regional Inspectorate Office, New Delhi<br />
11. Regional Inspectorate Office, Chennai<br />
12. Regional Inspectorate Office, Panaji (Goa)<br />
13. Regional Inspectorate Office, Shillong<br />
TECHNO ECONOMIC APPRAISAL OF POWER<br />
SCHEMES<br />
(Period 1.1.2003 to 31.3.2004)<br />
The Central Electricity Authority had been<br />
according Techno-economic Clearance/ Appraisal<br />
to generation schemes (Hydro and Thermal )<br />
and Transmission schemes etc. under the then<br />
Electricity (Supply) Act, 1948 before the<br />
enactment <strong>of</strong> the Electricity Act, 2003. CEA’s<br />
consultation u/s 44(2A) <strong>of</strong> repealed Electricity<br />
(Supply) Act, 1948 was also being conveyed to<br />
the concerned State Electricity Boards/<br />
Regulatory Commissions for captive power plants.<br />
The Electricity Act, 2003 came into force w.e.f.<br />
10th June, 2003. As per The Electricity Act,<br />
2003, concurrence <strong>of</strong> CEA is now required for<br />
only Hydro Generating Schemes. Technoeconomic<br />
Clearance <strong>of</strong> CEA to Thermal<br />
generation and Transmission schemes as well<br />
as consultation for captive power plants are not<br />
required now.<br />
During the period, Central Electricity Authority<br />
accorded TEC/TEA to 10 Nos. Generating<br />
Schemes aggregating to a capacity <strong>of</strong> 7783 MW<br />
comprising <strong>of</strong> 6 Nos. Thermal Schemes with<br />
total capacity <strong>of</strong> 3265 MW and 4 No. Hydro<br />
Schemes with total capacity <strong>of</strong> 4518 MW under<br />
the repealed Electricity (Supply) Act, 1948.<br />
Further, 6 Nos. Hydro Schemes aggregating to<br />
a capacity <strong>of</strong> 1526 MW were accorded Techno-<br />
Economic Clearance / Appraisal under the<br />
Electricity Act, 2003.<br />
Thus, during the period from 1st January 2003 to<br />
31st March, 2004, CEA accorded TEC/TEA to<br />
16 No. schemes (details as per Annex-I & II)<br />
aggregating to a capacity <strong>of</strong> 9309 MW<br />
comprising 6No. Thermal schemes aggregating<br />
to capacity <strong>of</strong> 3265 MW and 10 No. Hydro<br />
schemes aggregating to a capacity <strong>of</strong> 6044 MW.<br />
RESEARCH AND DEVELOPMENT<br />
Under the provision <strong>of</strong> Electricity Act, 2003<br />
Central Electricity Authority will function and<br />
perform such duties so as to promote research<br />
in matters affecting the generation, transmission,<br />
distribution and trading <strong>of</strong> electricity.<br />
IMPORTANT TASKS HANDLED DURING<br />
2003-2004<br />
1. Preparation <strong>of</strong> Perspective Plan for<br />
Research & Development<br />
A standing Committee on R&D for<br />
preparation <strong>of</strong> a Perspective Research and<br />
Development Plan for next 15 years was<br />
constituted by the <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> under<br />
the Chairmanship <strong>of</strong> Chairman, CEA. The<br />
report <strong>of</strong> the Committee ‘National Perspective<br />
Plan for R&D in <strong>Power</strong> Sector’ has since<br />
been submitted.<br />
2. CEA Chairs at IIT, Delhi<br />
An MoU exists between CEA and the IIT,<br />
Delhi for creation <strong>of</strong> two CEA Chair<br />
Pr<strong>of</strong>essorships, one in the Center for Energy<br />
Studies and the other in Electrical<br />
Engineering Department to fulfil following<br />
objectives concerning <strong>Power</strong> Sector.<br />
To take part in the academic programs<br />
<strong>of</strong> IIT, Delhi, as full time pr<strong>of</strong>essors/<br />
55