2 Pong (6x60), BBMB<br />
3 Bhadra (1x2), KPCL<br />
4 Sharavathy Ph-A (10x103.5), KPCL<br />
5. Shivasamudram (6x3+4x6), VVNL<br />
6. Pykara (3x6.65+1x11+2x14), TNEB<br />
7. Maithon (1x20), DVC<br />
8. Bhira Tail Race (2x40), MSEB<br />
9. Koyna Gen. Complex<br />
(4x70+4x80+4x80), MSEB<br />
10 Tillari(1x60), MSEB<br />
11. Khandong (2x25), NEEPCO<br />
h) Achievement during the year 2003-04<br />
(1.4.2003 to 31.03.2004)<br />
The following 4 (2 in Central Sector & 2 in<br />
State Sector) out <strong>of</strong> the 11 schemes<br />
A view <strong>of</strong> TG Hall<br />
programmed for the year 2003-04 with an<br />
installed capacity <strong>of</strong> 600.00 MW have been<br />
completed at an expenditure <strong>of</strong> about<br />
Rs.32.205 Crores against the estimated cost<br />
<strong>of</strong> Rs.34.65 Crores during the year 2003-04<br />
to accrue a benefit <strong>of</strong> 36.00 MW.<br />
Sl. No. Name <strong>of</strong> scheme (I.C. in MW),<br />
Agency<br />
1 Shanan Ph-A (4x15 + 1x50), PSEB<br />
2 Pong (6x60), BBMB<br />
3. Bhira Tail Race (2x40), MSEB<br />
4. Khandong (2x25), NEEPCO<br />
Works on remaining 7 schemes are in advanced<br />
stage and report regarding their completition are<br />
awaited from the respective utilities.<br />