2 Pong (6x60), BBMB<br />

3 Bhadra (1x2), KPCL<br />

4 Sharavathy Ph-A (10x103.5), KPCL<br />

5. Shivasamudram (6x3+4x6), VVNL<br />

6. Pykara (3x6.65+1x11+2x14), TNEB<br />

7. Maithon (1x20), DVC<br />

8. Bhira Tail Race (2x40), MSEB<br />

9. Koyna Gen. Complex<br />

(4x70+4x80+4x80), MSEB<br />

10 Tillari(1x60), MSEB<br />

11. Khandong (2x25), NEEPCO<br />

h) Achievement during the year 2003-04<br />

(1.4.2003 to 31.03.2004)<br />

The following 4 (2 in Central Sector & 2 in<br />

State Sector) out <strong>of</strong> the 11 schemes<br />

A view <strong>of</strong> TG Hall<br />

programmed for the year 2003-04 with an<br />

installed capacity <strong>of</strong> 600.00 MW have been<br />

completed at an expenditure <strong>of</strong> about<br />

Rs.32.205 Crores against the estimated cost<br />

<strong>of</strong> Rs.34.65 Crores during the year 2003-04<br />

to accrue a benefit <strong>of</strong> 36.00 MW.<br />

Sl. No. Name <strong>of</strong> scheme (I.C. in MW),<br />

Agency<br />

1 Shanan Ph-A (4x15 + 1x50), PSEB<br />

2 Pong (6x60), BBMB<br />

3. Bhira Tail Race (2x40), MSEB<br />

4. Khandong (2x25), NEEPCO<br />

Works on remaining 7 schemes are in advanced<br />

stage and report regarding their completition are<br />

awaited from the respective utilities.<br />

31