- Page 3: Annual Report 2003-04 lR;eso t;rs M
- Page 7 and 8: POLICY INITIATIVES / DECISIONS TAKE
- Page 9 and 10: ACCELERATED POWER DEVELOPMENT AND R
- Page 11 and 12: The construction and operation of g
- Page 13 and 14: Control room of a power plant POWER
- Page 15 and 16: Capacity Addition : Programme and A
- Page 17 and 18: THE ELECTRICITY ACT, 2003 The Elect
- Page 19 and 20: Distribution Reforms & Accelerated
- Page 21 and 22: APDRP Status As on 31.03.2004 (Rs.
- Page 23: in Eastern & North-Eastern Regions
- Page 27 and 28: During 2003-04 Rs. 600 crore have b
- Page 29 and 30: ANNEXURE-II Physical and financial
- Page 31 and 32: Government has approved a new schem
- Page 33 and 34: DEMAND SIDE MANAGEMENT (DSM) The De
- Page 35 and 36: Renovation and Modernisation RENOVA
- Page 37 and 38: 2 Pong (6x60), BBMB 3 Bhadra (1x2),
- Page 39 and 40: open access, the person owning the
- Page 41 and 42: Development of water resources of t
- Page 43 and 44: Power Development Activities in Nor
- Page 45 and 46: Implementation of official language
- Page 47 and 48: in Hindi was introduced. Hindi book
- Page 49 and 50: Vigilance Activities/Disciplinary C
- Page 51 and 52: which included 46 surprise inspecti
- Page 53 and 54: version of Purchase-Manual, DVC S.R
- Page 55 and 56: women employees to training program
- Page 57 and 58: Chapter - 17 Physically Challenged
- Page 59 and 60: of the Organisation (Hearing Handic
- Page 61 and 62: Apart from the above functions CEA
- Page 63 and 64: Details of Schemes cleared techno-e
- Page 65 and 66: Badarpur Thermal Power Station INTR
- Page 67 and 68: PUBLIC SECTOR UNDERTAKINGS Chapter
- Page 69 and 70: units of 500 MW at Singrauli, Korba
- Page 71 and 72: MOU PERFORMANCE NTPC is the first p
- Page 73 and 74: - Diversion tunnel civil works are
- Page 75 and 76:
JOINT VENTURE WITH SAIL (i) The tur
- Page 77 and 78:
ASH UTILISATION During the year 200
- Page 79 and 80:
National Hydroelectric Power Corpor
- Page 81 and 82:
MOP for sanction. DPR has been subm
- Page 83 and 84:
CWC with inputs of certain investig
- Page 85 and 86:
Power Grid Corporation of India Ltd
- Page 87 and 88:
Introduction of High Temperature En
- Page 89 and 90:
wide telecom network at an estimate
- Page 91 and 92:
It was not possible to achieve impr
- Page 93 and 94:
Rural Electrification Corporation L
- Page 95 and 96:
Cumulatively, since launch of the p
- Page 97 and 98:
Sl No Name of the Power Stations Ge
- Page 99 and 100:
One 2.50 Km long tunnel with Power
- Page 101 and 102:
Himalayas. The power house site is
- Page 103 and 104:
e deducted from the Capital Cost of
- Page 105 and 106:
Tehri Hydro Development Corporation
- Page 107 and 108:
Generator Barrel concreting has bee
- Page 109 and 110:
STATUTORY BODIES Chapter - 21.9 Dam
- Page 111 and 112:
unit #3 of BTPS ‘B’ have been i
- Page 113 and 114:
Bhakra Beas Management Board Bhakra
- Page 115 and 116:
Hydel Channel are being carried out
- Page 117 and 118:
Central Power Research Institute Th
- Page 119 and 120:
of programs on Energy Environment L
- Page 121 and 122:
for the financial year 2001-02 and
- Page 123 and 124:
assist the Director (Grievances). T
- Page 125 and 126:
As a result of said effort the stat
- Page 127 and 128:
employees only, as officers of Clas
- Page 129 and 130:
Statement - II INSTALLED CAPACITY (
- Page 131 and 132:
Statement - IV INSTALLED CAPACITY (
- Page 133 and 134:
Statement - VI INSTALLED CAPACITY (