Chapter - 7<br />

Transmission<br />

Transmission projects continue to be accorded a high priority in the context <strong>of</strong> the need to evacuate<br />

power from the generating stations to the load centres, system strengthening and creation <strong>of</strong> National<br />

Grid. POWERGRID’s transmission projects construction targets for the year 2003-04 and achievement<br />

are summarised below:<br />

Works Programme for the year Achievement upto % <strong>of</strong><br />

2003-2004 (Ckt. Kms.) March, 2004 Achievement<br />

800/400/220 kV 1580 2487 157<br />

EHV AC & 500 kV<br />

HVDC lines<br />

CENTRAL SECTOR TRANSMISSION<br />

POWERGRID, the ‘Central Transmission Utility’, is the sole agency responsible to establish the requisite<br />

transmission capacity in the central sector to match the generation capacity addition and encourage<br />

inter-state/inter-regional exchange <strong>of</strong> power to mitigate the situation <strong>of</strong> surplus/deficit <strong>of</strong> energy in various<br />

regions. POWERGRID’s transmission lines and sub-stations completed during the year 2003-04 are<br />

shown in the following table:<br />

S. No. Name <strong>of</strong> the line/Sub-station Voltage Class<br />

1. Salem-Udumalpet S/C 400 kV<br />

2. LILO <strong>of</strong> Chamera-I – Kishenpur S/C at Chamera-II 400 kV<br />

3. Unified Load Despatch and Communication<br />

Scheme in North-Eastern Region<br />

-<br />

4. Agra (POWERGRID) – Agra (UPPCL) D/C 400 kV<br />

5. LILO <strong>of</strong> Purnea (BSEB) –Dhalkola (WBSEB) at Purnea (Existing) 132 kV<br />

6. LILO <strong>of</strong> Bongaigaon-Malda at Purnea 400 kV<br />

7. LILO <strong>of</strong> Panki-Naubasta at Kanpur 220 kV<br />

8. Meramundali-Jeypore S/C 400 kV<br />

9. Series Compensation on 400 kV Panki-Muradnagar line 400 kV<br />

10. Ranganadi-Ziro S/C line 132 kV<br />

11. LILO <strong>of</strong> Davangere-Hoody at Hiriyur 400 kV<br />

12. Mau- Balia S/C 132 kV<br />

13. Khamam – Nagarjunasagar S/C 400 kV<br />

14. Purnea Sub-station 400 /220 kV<br />

15. Hiriyur Sub-station 400 /220 kV<br />

16. Ziro Sub-station 132/33 kV<br />

17. ICT at Salakati 220/ 132 kV<br />

18. ICT – III at Biharshariff 400/ 200 kV<br />

TOWARDS FORMATION OF NATIONAL GRID<br />

POWERGRID has envisaged establishment <strong>of</strong> an integrated National <strong>Power</strong> Grid in the country by the<br />

year 2012 with an inter-regional power transfer capacity <strong>of</strong> 30,000 MW. A perspective transmission plan<br />

has been evolved for strengthening the regional grids with ultimate objective <strong>of</strong> establishment <strong>of</strong> strong<br />

& vibrant National <strong>Power</strong> Grid in a phased manner to support the generation capacity addition program<br />

<strong>of</strong> about 1,00,000 MW during X & XI Plans. The major considerations followed while formulating such a<br />

perspective plan are, creation <strong>of</strong> “Transmission Highways” from potential generating resources mainly