Generator Barrel concreting has been<br />

completed.<br />

Erection <strong>of</strong> Turbine Operating Mechanism<br />

is in progress. The Erection <strong>of</strong> Hydro-<br />

Mechanical Equipments is in progress.<br />

Commissioning Schedule<br />

Closure <strong>of</strong> Diversion Tunnel T-2 would be planned<br />

during 2nd quarter <strong>of</strong> 2004-2005 subject to<br />

observance <strong>of</strong> water discharge in the river for<br />

impoundment <strong>of</strong> reservoir and commissioning <strong>of</strong><br />

the units.<br />

Expenditure<br />

Total expenditure incurred on Tehri Stage-I (1000<br />

MW) upto March, 2004 is Rs.6009.29 cr.<br />

(Provisional).<br />

REHABILITATION<br />

Rehabilitation is being implemented in two<br />

phases. The Phase-1 covers those families<br />

affected by construction <strong>of</strong> C<strong>of</strong>fer Dam, including<br />

the Old Tehri Town. In Phase-11, all remaining<br />

families to be affected due to impoundment are<br />

being rehabilitated.<br />

The Phase-1 Rural Rehabilitation is nearly<br />

completed, with 98.5 <strong>of</strong> the families i.e. all those<br />

families who have come forward have been paid<br />

compensation and rehabilitated.<br />

In Phase-11, 2463 out <strong>of</strong> 3365 rural families have<br />

been rehabilitated through allotment <strong>of</strong> land or<br />

payment <strong>of</strong> cash in lieu there<strong>of</strong>. Under Phase-<br />

11, families residing upto EL 780 m. are being<br />

rehabilitated first and balance families above EL<br />

780 m. are planned to be rehabilitated by<br />

June,2004.<br />

The Urban affected population has been<br />

rehabilitated in New Tehri Town and at<br />

Rishikesh/Dehradun as per their option. The NTT<br />

has been developed at a height <strong>of</strong><br />

1350-1850 M., and has all modern facilities<br />

including a University Campus, Hospital,<br />

Educational and Financial Institutions, Markets,<br />

Places <strong>of</strong> worship and public utility buildings.<br />

The major recommendations <strong>of</strong> the Hanumantha<br />

Rao Committee, approved by the Govt. in Dec.,<br />

1998 in regard to rehabilitation <strong>of</strong> the affected<br />

population include definition <strong>of</strong> family so as to<br />

make all major sons and major daughters who<br />

attained the age <strong>of</strong> 21 years, and dependent<br />

parent (Mother/Father) <strong>of</strong> the fully affected entitled<br />

land owner on 19.07.1990, eligible for ex-gratia<br />

payment <strong>of</strong> 750 days minimum agricultural wage<br />

each, grant <strong>of</strong> house construction assistance to<br />

the urban land owner families, linked with the<br />

progress <strong>of</strong> construction and shifting, allotment<br />

<strong>of</strong> one constructed shop to shop owners not<br />

running the shops, recognition <strong>of</strong> the right <strong>of</strong><br />

people, living in the villages upstream <strong>of</strong> Tehri<br />

reservoir, over the water from Bhagfrathi and<br />

Bhilangna rivers and tributaries for drinking and<br />

irrigation purposes.<br />

The responsibility for the Rehabilitation &<br />

Resettlement was transferred to the State Govt.<br />

in 1999, to be carried out under the overall<br />

supervision and control <strong>of</strong> Commissioner, Garhwal<br />

assisted by various State Govt. <strong>of</strong>ficials, with<br />

funds for R&R to be provided by THDC.<br />

ENVIRONMENT<br />

Environmental clearance was accorded by MOEF<br />

vide their letter dated; 19.7.1990.<br />

Various studies as per the Environmental<br />

clearance conditions have been completed and<br />

Action Plans drawn up wherever required. Action<br />

for the protection and upgradation <strong>of</strong> environment<br />

is being actively pursued. THDC is carrying out<br />

Catchment Area Treatment in the high and very<br />

high credibility classification. An area <strong>of</strong> 52,204<br />

ha. was to be treated under the Catchment Area<br />

Treatment Programme. An area <strong>of</strong> 46540 ha.<br />

has been treated till March’04 and balance <strong>of</strong><br />

5664 Ha. in non-forest area shall be treated by<br />

June,2004. In accordance with the conditions<br />

laid down by the MOEF, Forest Deptt., Govt. <strong>of</strong><br />

Uttaranchal has set up a Botanical Garden which<br />

is located adjacent to the Reservoir in an area<br />

<strong>of</strong> 14.28 Ha. at Koti in Tehri Garhwal. The<br />

construction work and plantation <strong>of</strong> species<br />

coming under submergence in the Botanical<br />

Garden has already been completed by the Forest<br />

Deptt. GOUA at project cost. The consultancy<br />

and implementation <strong>of</strong> the Action Plan for<br />

mitigating the possible impact on “Mahseer Fish”<br />

due to construction <strong>of</strong> Tehri Dam has been taken<br />

up by the National Research Centre on Cold<br />

Water Fisheries, Bhimtal, Distt. Nainital. MOEF<br />

granted forest clearance in June, 1987 with<br />

stipulation that the project authorities will carry<br />

out compensatory afforestation in an area <strong>of</strong> 3815<br />

ha. <strong>of</strong> non forest land. An area <strong>of</strong> 4516 ha. has<br />

already been planted in districts <strong>of</strong>Jhansi and<br />

Lalitpur in U.P. The plantation done on non-forest<br />

land is being converted into protected forest by<br />

State Forest deptt. KOTESHWAR PROJECT(400<br />

MW) The Koteshwar H.E. Project is an integral<br />

part <strong>of</strong> the 2400 MW Tehri Hydro <strong>Power</strong><br />

Complex. CCEA has approved the execution <strong>of</strong><br />

Koteshwar H.E Project (4X100 MW), at a cost<br />

<strong>of</strong> Rs.1301.56 Cr. including IDC <strong>of</strong>Rs.190.04 Cr.<br />

at Oct.’99 price level.<br />

STATUS OF PROJECT WORKS<br />

a) Infrastructure Works<br />

Necessary access to the Project in the<br />

101