Manpower level per MW generated Man <strong>Power</strong> Level per MW = 2.01<br />

C 2 - Transmission & Distribution 19.0 10.0<br />

> Level <strong>of</strong> Interface Metering At 33 KV, metering yet to be completed<br />

> Quality <strong>of</strong> transmission and distribution network $ Approx 4.5% increase in length <strong>of</strong> transmission lines each yr <strong>for</strong> last 3 years.<br />

$ 1225.63 kms <strong>of</strong> transmission lines, 40 substations, 656 capacitors and 12465 kms<br />

<strong>of</strong> distribution lines were added in 2000-01.<br />

$ There were a total <strong>of</strong> 40 power trans<strong>for</strong>mer failures in 2000-01<br />

$ There was an investment <strong>of</strong> approximately Rs. 750 crores in 2001-02 to improve<br />

the T&D infrastructure.<br />

$ Distribution Trans<strong>for</strong>mer Failure Rate has been brought down from 19.23% to<br />

18.17% (1999-00 to 2001-02).<br />

> Units metered (distribn end) / Units input in the<br />

transmission system<br />

From 2000-01 to 2001-02 there has been an improvement <strong>of</strong> 0.59%<br />

> Energy Audit (11 kV) $ Metering at 400 KV and 220 KV levels are already available.<br />

$ 110 KV, 66 KV and 33 KV metering is to be completed by December 2002.<br />

$ All 11 KV Banks and Feeders have been metered with electronic tri vector<br />

meters.<br />

$ 280660 IP Sets, 788140 BJ/KP Installations and 16,200 Street Lights have been<br />

metered.<br />

$ Sample meters have been set up in each taluk.<br />

$ One Time Regularization Scheme has resulted in 7.5 lakh domestic, <strong>for</strong>ty<br />

thousand commercial and 79 thousand IP sets getting regularized till April 9th<br />

2002<br />

> Collection efficiency Collection Efficiency = 101% (Average <strong>of</strong> last three years)<br />

> Manpower in T&D per "000 consumers Manpower = 36,985<br />

Consumers =12,687 thousand (2001-02 figures)<br />

Manpower per "000 consumers <strong>for</strong> KPTCL = 2.92<br />