03.08.2013 Views

index of the reports of the bridge and structures standards committee

index of the reports of the bridge and structures standards committee

index of the reports of the bridge and structures standards committee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INDEX OF THE REPORTS OF THE BRIDGE AND<br />

STRUCTURES STANDARDS COMMITTEE<br />

185/3 Revision <strong>of</strong> <strong>the</strong> existing Bridge Rules in connection with impact on multiple track<br />

railway <strong>bridge</strong>s <strong>and</strong> highway <strong>bridge</strong>s.<br />

186/4 Revising <strong>the</strong> impact factor at present specified for <strong>the</strong> design <strong>of</strong> narrow <strong>and</strong> light<br />

gauge <strong>bridge</strong>s.<br />

187/5 Revision <strong>of</strong> Bridge Rules for longitudinal loads.<br />

188/6 Rules for <strong>the</strong> lateral <strong>and</strong> longitudinal distribution <strong>of</strong> loads on <strong>bridge</strong>s in <strong>the</strong> Bridge<br />

Rules.<br />

189/7 Method adopted for calculating permissible stresses in struts subject to eccentric<br />

loading.<br />

190/8 Revision <strong>of</strong> certain clauses <strong>of</strong> <strong>the</strong> steel <strong>structures</strong> Code, i.e. Change <strong>of</strong> title <strong>of</strong><br />

<strong>the</strong> Code <strong>and</strong> o<strong>the</strong>r clauses likewise- Alternative loading, filter floor beams, limits <strong>of</strong><br />

working stresses for occasional loads etc.<br />

191/9 Drawings <strong>of</strong> reinforced concrete box culverts.<br />

192/10 Draft IRS Code <strong>of</strong> Practice for masonry <strong>and</strong> plain cement concrete Arches-<br />

percentage <strong>of</strong> over stress.<br />

193/11 Tests for reduction in present impact allowances for design <strong>of</strong> stringers <strong>and</strong> cross<br />

girders <strong>of</strong> open deck <strong>bridge</strong>s.<br />

194/12 Revising certain clauses <strong>of</strong> <strong>the</strong> Steel Bridge Code regarding prestressing, existing<br />

<strong>bridge</strong>s, bearings <strong>and</strong> bed plates, web tension <strong>and</strong> compression members etc.<br />

195/13 Design <strong>of</strong> turntables <strong>and</strong> make recommendations regarding chief features.<br />

Twenty - second Meeting-December 1941<br />

196/1 Use <strong>of</strong> RC pipes with single oval reinforcement st<strong>and</strong>ard pipes.<br />

197/2 Sleeper pad plates <strong>of</strong> different kinds.<br />

198/3 Revision <strong>of</strong> certain clauses <strong>of</strong> Steel Bridge Code regarding effective spans ,<br />

limits <strong>of</strong> working stresses compression members etc. etc..<br />

199/4 Revision <strong>of</strong> Rule 8(a) (ii), regarding longitudinal distribution <strong>of</strong> loads <strong>and</strong> Rules 19<br />

to 21 regarding lateral loads o<strong>the</strong>r than wind loads.<br />

200/5 Clause 24 <strong>of</strong> <strong>the</strong> pier <strong>and</strong> abutment Code regarding application <strong>of</strong> loads.<br />

201/6 Clause 24 <strong>of</strong> <strong>the</strong> pier <strong>and</strong> abutment Code regarding application <strong>of</strong> loads.<br />

202/7 Revision <strong>of</strong> <strong>the</strong> Welding Code.<br />

203/8 Tests on welds in Tiscor <strong>and</strong> Tiscom steel welding <strong>of</strong> high tensile steels.<br />

204/9 Periodically cleaning <strong>and</strong> oiling <strong>the</strong> bearing <strong>of</strong> large <strong>bridge</strong> spans.<br />

205/10 Drawings <strong>of</strong> <strong>the</strong> goods shed.<br />

206/11 Drawings <strong>of</strong> <strong>the</strong> foot over <strong>bridge</strong>s.<br />

207/12 Drawings <strong>of</strong> <strong>the</strong> piers <strong>and</strong> abutments.<br />

208/13 Drawings <strong>of</strong> plate girder spans for broad gauge with high tensile steel flanges <strong>and</strong><br />

webs.<br />

Twenty - third Meeting- November, 1942<br />

209/1 Principles governing <strong>the</strong> design foundation wells <strong>of</strong> <strong>bridge</strong>s.<br />

210/2 Revision <strong>of</strong> <strong>the</strong> welding Code.<br />

211/3 Designs for RC pipe with two concentric reinforcing rings.<br />

212/4 Correction slips to (a) Steel Bridge Code <strong>and</strong> (b) steel <strong>structures</strong> Code regarding<br />

(a) erection stresses working stresses, lateral bracing etc. (b) working stresses in<br />

ro<strong>of</strong> purlins, etc.<br />

213/5 Drawings <strong>of</strong> plate girder spans for MG with hts flanges <strong>and</strong> webs.<br />

214/6 Typical drawings <strong>of</strong> <strong>the</strong> piers <strong>and</strong> abutments <strong>and</strong> calculations.<br />

215/7 Drawings <strong>of</strong> <strong>the</strong> foot-over <strong>bridge</strong>.<br />

216/8 Drawings <strong>of</strong> reinforce concrete box culverts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!