03.08.2013 Views

index of the reports of the bridge and structures standards committee

index of the reports of the bridge and structures standards committee

index of the reports of the bridge and structures standards committee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INDEX OF THE REPORTS OF THE BRIDGE AND<br />

STRUCTURES STANDARDS COMMITTEE<br />

Railways.<br />

Informal-2 To consider <strong>the</strong> provisions laid down for Risk Coefficient in IS:875 (Part-3)-1987<br />

<strong>and</strong> make recommendations to formulate <strong>the</strong> uniform values <strong>of</strong> Risk Coefficient for<br />

design <strong>of</strong> high rise hoarding along <strong>the</strong> Railway track on Indian Railways.<br />

Informal-3 To consider <strong>the</strong> loss <strong>of</strong> camber <strong>and</strong> corresponding speed restriction to be imposed<br />

on existing <strong>bridge</strong>s.<br />

Seventieth Meeting - January, 1999<br />

836 Modification to <strong>bridge</strong>s for MBG suitability-provision <strong>of</strong> additional holding down<br />

bolts.<br />

837 Revision <strong>of</strong> clause 5.16 <strong>of</strong> IRS Bridge sub-structure <strong>and</strong> Foundation code for<br />

checking suitability <strong>of</strong> foundation <strong>of</strong> existing <strong>bridge</strong>s for introduction <strong>of</strong> New rolling<br />

stock/locomotives etc.<br />

838 Live load due to working <strong>of</strong> Plasser's Quick Relay System (PQRS) on PSC/RCC<br />

slab/girder <strong>bridge</strong>s<br />

839 Revision <strong>of</strong> clause No.4.3 <strong>of</strong> IRS Bridge Substructure <strong>and</strong> Foundation code<br />

regarding estimation <strong>of</strong> design discharge.<br />

840 Use <strong>of</strong> M.S. plates at panel points <strong>of</strong> CC Cribs used for temporary arrangement.<br />

841 Amendment to Clauses 4.6.1, 4.6.2.1, <strong>and</strong> 16.8.2.2 <strong>of</strong> IRS Concrete Bridge Code<br />

(2 nd Revision 1996)-Provision <strong>of</strong> low relaxation prestressing steel str<strong>and</strong>s.<br />

842 Design <strong>of</strong> M20 grade Mass concrete stepped piers <strong>of</strong> st<strong>and</strong>ard spans 6.1 m to 76.2<br />

m conforming to MBG Loading-1987 suitable for Zone I to III.<br />

843 Design <strong>of</strong> 30.5m span Welded open web girder (through type) to MBG Loading.<br />

844 Design <strong>of</strong> M20 grade mass concrete stepped piers <strong>of</strong> st<strong>and</strong>ard spans 6.1 m to 30.5<br />

m conforming to MBG Loading-1987 for seismic Zone IV & V.<br />

845 Loading st<strong>and</strong>ard for Gauge conversion routes.<br />

846 Dynamic load testing <strong>of</strong> PSC/RCC Railway Bridge Girders.<br />

847 Review <strong>of</strong> action taken on pending items<br />

Informal-1 Use <strong>of</strong> Ready Mix Concrete in Engg.Works<br />

Informal-2 Heavy Mineral Loading-1995<br />

Fourteenth Extra-Ordinary Meeting - June 1999<br />

848 Report on Durability <strong>of</strong> Concrete Structures<br />

Seventy-First Meeting – October, 1999<br />

849 Use <strong>of</strong> Thermo-Mechanically Treated (TMT) bars in RCC works on Railways<br />

850 Design <strong>of</strong> 45.7m welded open web girder (through type) to HM loading.<br />

851 Design <strong>of</strong> 45.7m welded open web girder (through type) to HM loading-1995.<br />

852 Design <strong>of</strong> 45.7m welded open web girder (through type) to MBG loading.<br />

853 Design <strong>of</strong> sub-structure for 6.1m PSC deck slab conforming to HM loading-1995.<br />

854 Dynamic effect on ballasted deck <strong>bridge</strong>s.<br />

855 Increase in allowable bearing pressure for checking suitability <strong>of</strong> foundation <strong>of</strong> old<br />

<strong>bridge</strong>s.<br />

856 Fabrication <strong>of</strong> steel <strong>bridge</strong> girders by trade.<br />

857 Preparation <strong>of</strong> IRS codes for elastomeric, PTFE <strong>and</strong> Pot bearing for Railway<br />

<strong>bridge</strong>s <strong>and</strong> to issue st<strong>and</strong>ard drawings.<br />

858 Defining temperature gradient across depth <strong>of</strong> girder.<br />

859* Review <strong>of</strong> action taken on pending items.<br />

Fifteenth Extra-Ordinary Meeting – February 2000<br />

859* <strong>of</strong> 71 st i) Item No. 832 <strong>of</strong> 69 th BSC:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!