27.09.2012 - Indian Bureau of Mines
27.09.2012 - Indian Bureau of Mines
27.09.2012 - Indian Bureau of Mines
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
inspecti<br />
on<br />
20. RECLAMATION /REHABILITATION OF TAILING PONDS<br />
No proposal for reclamation <strong>of</strong> tailing pond was made.<br />
Year Area occupied<br />
Area stabilised/<br />
Means <strong>of</strong> rehabilitation<br />
(ha)<br />
rehabilitated<br />
Cumulative as on 01.04. 34.9744 0 No proposal for<br />
2012<br />
stabilization. The<br />
During previous year<br />
2011-12<br />
34.9744 0<br />
tailing pond is still active.<br />
During the year 2012-13 34.9744 0<br />
Cumm as on date <strong>of</strong><br />
inspection<br />
34.9744 0<br />
Name<br />
<strong>of</strong> the<br />
new<br />
macine<br />
Name<br />
<strong>of</strong> the<br />
new<br />
macine<br />
21. INPUT /OUTPUT OF MACHINERY PERFORMANCE<br />
A. New Machinery<br />
Sector<br />
Private<br />
/Public<br />
Sub<br />
type<br />
Electric<br />
/diesel<br />
B. Write <strong>of</strong>f machinery<br />
Sector<br />
Private<br />
/Public<br />
Sub<br />
type<br />
Electric<br />
/diesel<br />
Specification<br />
capacity<br />
Specification<br />
capacity<br />
Capacity<br />
unit<br />
Capacity<br />
unit<br />
No.<strong>of</strong><br />
new<br />
items<br />
No.<strong>of</strong><br />
new<br />
items<br />
removed<br />
Origin<br />
Indigenous<br />
/ imported<br />
Origin<br />
Indigenous<br />
/ imported<br />
Purchace<br />
date<br />
Write<br />
<strong>of</strong>f<br />
date<br />
C. Machinery on site<br />
Name <strong>of</strong><br />
machine<br />
Specification Capacity unit No. <strong>of</strong><br />
machine<br />
% <strong>of</strong> availability % <strong>of</strong><br />
utilization<br />
Shovel EX-1100 5.7 cum 2 86% 49%<br />
Shovel EX-1200 5.9 cum 1 86% 47%<br />
Dumper KOMATSU 100 T 7 90% 59%<br />
Drill IDM-30,45 ;ROC<br />
L8<br />
150mm 3 77% 47%<br />
Dozer Komatsu 410hp 1 72% 36%<br />
Grader CAT 280 hp 1 96% 12%<br />
Water<br />
Sprinkler<br />
28KL 1 51% 22%<br />
Cost Commisioning<br />
date<br />
Write<br />
<strong>of</strong>f<br />
Values<br />
22. PLANTATION<br />
Plantation Inside mining lease Outside mining lease<br />
No. <strong>of</strong> trees Area in Rate <strong>of</strong> No. <strong>of</strong> trees Area in<br />
hect survival<br />
hect<br />
Remark<br />
s<br />
Rate <strong>of</strong><br />
survival