31.07.2013 Views

27.09.2012 - Indian Bureau of Mines

27.09.2012 - Indian Bureau of Mines

27.09.2012 - Indian Bureau of Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MCDR INSPECTION REPORT<br />

INDIAN BUREAU OF MINES<br />

MINES CONTROL AND CONSERVATION OF MINERALS DIVISION<br />

BHUBANESWAR REGIONAL OFFICE<br />

Mine file no. ORI/MN/KJR/MCDR-39/BBS<br />

Mine code No. 30 ORI 08035<br />

1) Name <strong>of</strong> Inspecting <strong>of</strong>ficer : Mr. Prem Prakash<br />

2) Designation : Sr.Assistant Controller <strong>of</strong> <strong>Mines</strong><br />

3) Accompanying mine <strong>of</strong>ficial with designation: Mr. T K Jena ,Manager <strong>Mines</strong><br />

4) Date <strong>of</strong> Inspection : <strong>27.09.2012</strong><br />

5) Date <strong>of</strong> Previous Inspection : 15.06.2011<br />

PART –I GENERAL INFORMATION<br />

1. (a) Name <strong>of</strong> the Mine : Katamati Iron Mine<br />

(b) Name <strong>of</strong> Lessee :Tata Steel Ltd.<br />

(c ) Category <strong>of</strong> Mine : A-Fully Mechanized.<br />

(d) Mode <strong>of</strong> working : OC<br />

(e) Location <strong>of</strong> Mine<br />

State : Odisha<br />

District : Keonjhar<br />

Tehsil/Taluka : Barbil<br />

Police Station : Joda<br />

Village : Deojhar<br />

Post/Pin Code : Deojhar/758038<br />

(f) Date <strong>of</strong> first opening : May 1934<br />

(g) Weekly day <strong>of</strong> rest : Sunday<br />

(h) Status <strong>of</strong> Mine :Working<br />

(i) Mine Correspondence address:-<br />

Phone : 9234301340<br />

Fax : 06596-290737<br />

E-Mail : gm.<strong>of</strong>fice@tatasteel.com<br />

2. Lease No.<br />

a. Lease area in ha with forest area, if any:<br />

Lease area – 403.3238 ha<br />

Forest – 199.1720 ha<br />

Non Forest –204.1518 ha<br />

b. Period <strong>of</strong> lease : 20 years (17.01.83 to 16.01.03)<br />

c..In case <strong>of</strong> forest area if the permission has been taken,<br />

its details like area permitted to be worked and letter no. etc.: the forest clearance has not<br />

yet granted<br />

d If the area is worked on any interim<br />

Govt. order, or court order, its details. : N/A<br />

e. Date <strong>of</strong> Expiry : 16.1.2003 (Under Deemed Renewal)<br />

3. (a)Mineral(s) included in the lease deed: Iron Ore<br />

(b) Mineral worked :Iron Ore<br />

4. Name and address <strong>of</strong> (incl.FAX, E-Mail, if any)<br />

a) Lessee address 24,Homi Modi street, Fort<br />

Bombay house,Mumbai-400001<br />

b) i)Nominated owner with address Mr. H M Nerurkar<br />

M.D. Tata Steel, Jamshedpur<br />

ii)Date <strong>of</strong> appointment 09.04.2009


c) i)Name <strong>of</strong> Agent with address Mr. S.Kuchroo<br />

Tata Steel Ltd., Noamundi<br />

Singhbhum west, Jharkhand<br />

ii) Date <strong>of</strong> appointment 1.08.2010<br />

d) i)Mining engineer(whole/part time)<br />

Mr Tapan kumar Jena<br />

Phone/fax nos<br />

Mob.09234554362<br />

ii)Education Qualification B.E(Mining)<br />

iii)Date <strong>of</strong> appointment 6.6.2011<br />

e) i)Manager Mr Tapan kumar Jena<br />

ii)Education Qualification B.E(Mining)<br />

iii)Date <strong>of</strong> appointment 6.6.2011<br />

f ) i)Geologist Vijay A Verlekar<br />

ii)Education Qualification MSc geology<br />

iii)Date <strong>of</strong> appointment 15.6.2011<br />

5. Details about Mining plan/Mining Scheme<br />

a) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

plan<br />

b) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

scheme<br />

c) Condition while approving the MP/MS/<br />

Modification<br />

d) Period <strong>of</strong> mining plan/mining scheme in<br />

force:<br />

-- 314(3)/ 2000/MCCM(C)/MP-14<br />

DT: 06.07.2001<br />

-- 29.09.2009<br />

-- General<br />

-- From 2008-2009 to 2012-13<br />

(Financial Year)<br />

PART II-Technical details/ documen<br />

1. Details about employment.<br />

Maximum number <strong>of</strong> persons employed on any day during the year(i) below ground (ii) above ground<br />

and (iii) in all in the mines. 146 on 28.02.2012<br />

Classification Average daily employment Average No. <strong>of</strong><br />

Direct Contract Total days worked in<br />

a year<br />

OPENCAST<br />

a) Managerial person 7 - 7 312<br />

b) Supervisory persons 2 - 2<br />

c) Workers 44 - 44<br />

d) Ministerial persons 6 - 6<br />

c) Employment in plant - 35 35<br />

f) Others - 2 2<br />

UNDERGROUND<br />

- - -<br />

Remarks<br />

a) Managerial person* - - -<br />

b) Supervisory persons - - -<br />

c) Workers - - -<br />

d) Ministerial persons - - -<br />

c) Employment in plant - - -<br />

f) Others - - - * If common,<br />

please state


S.No<br />

.<br />

2. Community Development Plan (in and around the mines) :<br />

Proposed action<br />

towards<br />

Socioeconomic<br />

development<br />

during t the year<br />

General<br />

Development in<br />

area<br />

Expenditure<br />

proposed for<br />

the year<br />

2011-12<br />

Expenditure<br />

incurred in<br />

2011-12<br />

Expenditure<br />

proposed for<br />

the year<br />

2012-13<br />

Expenditure<br />

actually<br />

incurred upto<br />

Aug'12 for<br />

the year<br />

2012-13<br />

Remarks<br />

1 a) Housing<br />

b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />

c) Sanitaion 102 2.81 10.00 0.00<br />

d) Health 48.6 1.5 8.00 0.20<br />

2 Training 11.29 0.7 25.00<br />

3<br />

4<br />

Employment to<br />

local inhabitants<br />

inhabitants 7.036 1.26<br />

Infrastrucure<br />

(Civil jobs<br />

14.00 1.75<br />

including roads) 529 434.2 140.00 81.85<br />

a)Constructional<br />

work(School<br />

,Community<br />

Centre etc)<br />

Health camps,medicine<br />

distribution<br />

Mason,carpentary,winding,w<br />

elding<br />

Kharif seeds, grocery,<br />

fingerlings, Pady fan,<br />

Sprayer machine<br />

Construction community<br />

centre & Boundary wall<br />

0.90 School building<br />

b)Irrigation 2.9 Ponds<br />

5 Education 0.03 23.00 1.13<br />

6 Sports Activities<br />

Environment<br />

1.5 1.34 5.00 0.20<br />

7 Management 3.75 2.00<br />

Gross Total 928.176 573.31 292.00 94.73<br />

Distribution <strong>of</strong> stationeries in<br />

schools, Coaching classes for<br />

8th to 10th std.<br />

Inter village Football<br />

Tounament<br />

3. Status <strong>of</strong> compliance <strong>of</strong> MCDR.88 including therewith the rectification <strong>of</strong> outstanding violation <strong>of</strong> the<br />

rules.<br />

Date <strong>of</strong> last<br />

inspection<br />

Violation pointed out Compliance reported<br />

15.06.2011 Rule 13 (1), 16 (1) & 33(2) complied<br />

During current inspection, No serious/ major violation <strong>of</strong> MCDR’88 was observed.<br />

4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 13(2) or prohibition <strong>of</strong><br />

deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.:<br />

Not recommended


(b) If rule 13(2) or 56 has been imposed in the past, its details needs to be included specially giving reasons<br />

and letter number. : NA<br />

5.Scientific mining (As per latest approved mining plan/scheme)<br />

Item Proposal Actual work done Remarks<br />

i) Exploration (Rule 13)<br />

(2011-12) (2011-12)<br />

a) Type <strong>of</strong> prospecting and exploration i.e. drilling,<br />

NIL proposed bore<br />

pitting, drilling etc.<br />

15m,750m<br />

holes were in<br />

b) Total area covered<br />

ii) Workings (Rule 13)<br />

16 ha NIL forest area and the<br />

forest clearance has<br />

not yet granted/<br />

obtained<br />

a) Opencast/ underground Opencast Opencast<br />

b) Manual/ mechanized Mechanized Mechanized<br />

c) No. and size <strong>of</strong> each pit (L x W x H) one one<br />

d) Bench size (1 x w x h) length can be Width:25m Width:25m<br />

defined as regular or irregular<br />

Height:12m approx<br />

Regular<br />

Height:12m<br />

appreox<br />

Regular<br />

e) Ore to waste ratio pit wise if possible<br />

otherwise for mine.<br />

1:0.11 1:0.14<br />

f) Total area covered under excavation/pits Not specific for the<br />

year<br />

--g)<br />

Production<br />

iii) Waste disposal (Rule 13)<br />

7.02 mill. te 4.42 mill. te<br />

a) Location <strong>of</strong> dumps Dump no.3 Dump no.3 .<br />

b) Method <strong>of</strong> dumping whether advancing/<br />

retreat<br />

Retreating Retreating<br />

c) Total area covered under waste dump Not specific for the<br />

year<br />

--d)<br />

No. & size <strong>of</strong> each waste dump with<br />

number <strong>of</strong> steps lift/ bench.<br />

02 nos. 02 nos.<br />

e) Yearly generation <strong>of</strong> waste quantity. 630000 348000<br />

f) Year-wise quantity <strong>of</strong> top soil removed,<br />

utilized & stacked.<br />

NIL NIL<br />

6.Conservation <strong>of</strong> mineral-both quantitative and qualitative.<br />

i) Mineral (Rule 15)<br />

A1 No benches in ore and waste waste-2, Ore-5<br />

A2 Percentage <strong>of</strong> recovery <strong>of</strong> ore pit –wise w.r.t. ROM Total About 95 %<br />

materials<br />

ii) Sub grade mineral / fines ( Rule 16 )<br />

B1 Separate stacking from waste Separate Subgrade Dump is<br />

maintained<br />

B2 Location <strong>of</strong> stacking 11900E to 12250E and 9850N<br />

to 10250N<br />

B3 Total area covered for stacking 8.02 ha<br />

B4 No. & size <strong>of</strong> each stack 1, 360x400, 3 steps<br />

B5 Quantity <strong>of</strong> Yearly generation utilisation & total quantity<br />

Available during inspection with grade<br />

252887 tonnes(FY’2011-12),


iii)Beneficiation ( Rule 20 )<br />

C1 Efforts for improving<br />

low grade & sub grade<br />

mineral<br />

C2 Efforts for improving<br />

percentage <strong>of</strong> recovery<br />

<strong>of</strong> ore<br />

7. Environment Management both quantitative & qualitative:<br />

A Land Environment<br />

A1) Landscape : Hilly<br />

A2) Aesthetic Environment: Satisfactory<br />

ROM is despatched to Noamundi wet Processing plant for<br />

beneficiation <strong>of</strong> low grade & subgrade ore .<br />

Hydrocyclone & jigging plant is introduced at Noamundi Processing<br />

plant to improve recovery <strong>of</strong> iron values from fines.<br />

A3) Soil & land use pattern: Top soil is stored separately & subsequently used for plantation.<br />

A4) Agriculture: No Agriculture land was there within the lease<br />

A5) Forest (Flora & fauna) :Diversified flora species & fauna exist inside the lease.<br />

A6) Vegetation: vegetation disturbed only in broken area.<br />

A7) Public building, places & monuments (protected monument & historical monument),<br />

Places <strong>of</strong> worship & places <strong>of</strong> tourist interest. : No monuments within the lease.<br />

B Water Environment:<br />

B1) Surface water: Toewall,garland drain etc. are provided around the<br />

dump to prevent the contamination <strong>of</strong> surface water.<br />

B2 ) Ground water : Ground Water table not intercepted yet due to opencast working.<br />

B3) Quality <strong>of</strong> water: The water quality is monitored regularly and all the parameters are<br />

within the permissible limit.<br />

C) Air Environment :<br />

C1) Noise : Monitoring is done regularly & noise levels are within the permissible limit.<br />

C2) Air : Monitoring is done regularly & parameters are within the permissible limit.<br />

C3) Climatic condition : Sub-tropical<br />

D) Socio economic environment:<br />

D1) Social & demographic pr<strong>of</strong>ile : Within the colony there is presence <strong>of</strong> people <strong>of</strong> different<br />

region and religion and <strong>of</strong> varied demographic.<br />

D2) Recommending health & safety : OHSAS-18001 system is in place and hence OHS aspect<br />

is taken care.<br />

D3) Human settlement :Within the ML area there is a colony for employees.<br />

D4)Recreational facility : recreational facilities being provided for the<br />

employee like parks ,garden,club,fountain park etc<br />

8. Sensitive technical items on conservation <strong>of</strong> mineral, scientific mining and protection <strong>of</strong> Environment: Is<br />

being taken care as per mining plan (Specific issues that are required to be kept in focus for examination &<br />

monitoring should be stated here) : There is no specific issues.


9. Scrutiny <strong>of</strong> annual return on cost <strong>of</strong> operation. Reserves, production, pit mouth value, stock, land use<br />

pattern and fixe assets for the year 2011-12.:<br />

(revised annual return for the year 2011-12 submitted to this <strong>of</strong>fice and available in the file is referred)<br />

a) Production:2011-12 -- 4419000 Tons (ROM)<br />

b) Cost <strong>of</strong> operation Rs 571.76 per ton<br />

c) Pit’s Mouth Value Rs 571.76 per ton (captive Mine)<br />

d) Reserves 50.50 million tonnes (cat.111)<br />

e) Stock at <strong>Mines</strong> head 337874.485 tonnes (ROM)<br />

f) Land Use Mining & allied activities.<br />

PART - III – PERFORMANCE OF MINES – NA<br />

PART - IV – PROPOSAL FOR FURTHER ACTION FOR<br />

a) <strong>Indian</strong> <strong>Bureau</strong>e <strong>of</strong> <strong>Mines</strong> (Any issue related to CGPB,SGPB, assistance,consultancy, annual<br />

programme and studies etc.) :Nil<br />

b) The state government(Illegal mining, mining dispute, infrastructure, mineral based industry,<br />

mineral policy etc) : nil<br />

c) The central govt. (infrastructure development, mineral policy and legislation, mineral based<br />

industry etc.) : Nil<br />

MCDR DATABASE<br />

Prem Prakash<br />

Senior Assistant Controller <strong>of</strong> <strong>Mines</strong><br />

INDIAN BUREAUE OF MINES.


1. Mine Details 2. Inspection details<br />

Name <strong>of</strong> Mine Katamati Iron Mine Mine file No.<br />

Name <strong>of</strong> the lessee M/S-TATA STEEL Mine Code No 301807035<br />

Lease Area 403.3238 Ha Date <strong>of</strong> first opening May 1934<br />

Date <strong>of</strong> execution 27.10.84 Date <strong>of</strong> inspection 15.6.11<br />

Expiry Date 16.1.2003(Under Deemed Earlier two dates <strong>of</strong> inspection 3.8.2010 &<br />

Renewal)<br />

15.06.2011<br />

State Odisha Name & Designation <strong>of</strong> the Mr. Prem Prakash<br />

inspecting <strong>of</strong>ficer<br />

Sr. ACOM<br />

District<br />

Keonjhar<br />

ID <strong>of</strong> inspecting <strong>of</strong>ficer<br />

MCDR Inspection<br />

Police Station<br />

Joda<br />

Type <strong>of</strong> inspection<br />

Post Deojhar Name & designation <strong>of</strong> mine<br />

Official accompanying)<br />

Village Deojhar Weekly day <strong>of</strong> rest Sunday<br />

Pin Code 758038 Type <strong>of</strong> Mine(OC,UG, BOTH) OC<br />

Phone Category <strong>of</strong> mines (A-Mech, A1-<br />

Manual, B-Manual, B1-Very<br />

small)<br />

A-Mech<br />

3. LAND DETAILS ( WITHIN LEASE AREA )<br />

Mr. T K Jena<br />

Mgr.(<strong>Mines</strong>),<br />

Mr. Indranil<br />

Saha,(geologist)<br />

Mr.Rajesh Kumar<br />

(Sr.Mgr.Operations)


Code Type <strong>of</strong> land Area ha Code Type <strong>of</strong> land Area ha<br />

1 Reserve forest 57.5520 18 Degraded by dump 8.0169<br />

2 Protected forest 141.6200 19 Degraded land by pit in forest 17.6022<br />

3 Forest unclassified 0 20 Degtraded land by dump in forest 0<br />

4 Forest sanctuary 0 21 Degraded land by pit in non forest 33.7716<br />

5 Forest National Park 0 22 Degraded land by dump in non forest 8.0169<br />

6 Forest Mineralized 23 Degraded land by road in forest 4.9535<br />

7 Forest Non Mineralized 24 Degraded land by road in non forest 0<br />

8 Non-Forest Pvt. Land 0.077 25 Degraded land by plant, building, town<br />

in forest<br />

0<br />

9 Non-Forest Agricultural 0 26 Degraded land by plant, building, town 7.3299<br />

Irrigated land<br />

in non forest<br />

10 Non-Forest agricultural non<br />

irrigated land<br />

70.9212 27 Degraded by tailing pond in Forest 5.1434<br />

11 Non-Forest private , other land 0 28 Degraded by tailing pond in non Forest 21.8141<br />

12 Non-Forest Govt. grazing land. 0 29 Degraded land others in forest(railway<br />

abandoned)<br />

3.48<br />

13 Non- Forest Govt. waste land 129.119 30 Degraded land others in non<br />

forest(railway abandoned)<br />

3.00<br />

14 Non-forest Govt. other land 4.0347 31 Forest land acquired 199.1720<br />

15 Non Forest Mineralised. 32 Non forest land acquired 193.77<br />

16 Non Forest non mineralized land 33 Area in forest 199.1720<br />

17 Degraded land by pit 51.3738 34 Area in Non forest 204.1518<br />

4. Mineral:<br />

Main<br />

Mineral(s)<br />

Associated<br />

Mineral(s)<br />

Captive<br />

use<br />

End<br />

Product<br />

Non-captive use<br />

Domestic Export<br />

Yes No Yes No<br />

Iron Ore Yes Steel Yes<br />

5. MINING PLAN/MINING SCHEME<br />

Date <strong>of</strong> approval <strong>of</strong> mining plan with<br />

no<br />

No. 314(3)/2000-MCCM(C)/MP14.<br />

Dated 6.7.2001 valid from 2001-02 to<br />

2007-08<br />

Mining plan modified vide letter<br />

No.314(3)/ 2007- MCCM(C)/MP-2<br />

Dated: 19.7.07 valid from<br />

2006-07 to 2007-08<br />

6. NOMINATED OWNER /AGENT DATA<br />

Additional<br />

conditions<br />

Approval<br />

letter<br />

attached<br />

Approval<br />

letter<br />

attached<br />

Date <strong>of</strong> approval<br />

<strong>of</strong> mining scheme<br />

Ist Scheme <strong>of</strong> Mining<br />

314(3)/2009/MCCM(C)/MS/19<br />

dated 29.09.2009 valid from 2008-<br />

09 to 2012-13<br />

A. Lessee B. Owner C. Agent<br />

Name <strong>of</strong> TATA STEEL H. M. Nerurkar S . Kuchroo<br />

Date <strong>of</strong> nomination 09.04.2009 1.8.2010<br />

Postal address,State Jharkhand Jharkhand<br />

District E.Singhbhum W.Singhbhum<br />

Village & Post Jamshedpur Noamundi<br />

Pin Code 831001 833217<br />

Remarks<br />

Remarks


Fax<br />

E-mail<br />

Phone<br />

7. MINING ENGINER /GEOLOGIST DATA (APPOINTED UNDER RULE 42 OF MCDR,1988)<br />

AND MINES MANAGER ( APPOINTED UNDER MMR ,1961 )<br />

Status Name Designation Educational Date <strong>of</strong><br />

Qualification appointment<br />

Mining Tapan Kumar Head, B. E (Mining) 6/6/2011<br />

Engineer/ Jena Katamati<br />

Geologist Viraj A<br />

Verlekar<br />

Geologist M.Sc.(Geology) 15/6/2011<br />

Manager Tapan Kumar Head, B. E (Mining) 6/6/2011<br />

Jena Katamati<br />

8.EXPLORATION:<br />

a)Cumulative exlploration as on 1.4.2011<br />

No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m) 100x100,<br />

200x200<br />

Max Depth(m) 166m Max Depth(m) Max length(m)<br />

Min depth(m) 2.3m In-depth(m) Min.length(m)<br />

Total meterage 6000.43 Total meterage Total length<br />

b) Exploration carried out during the year 2011-12<br />

No <strong>of</strong> boreholes NIL* Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m)<br />

Max Depth(m)<br />

NA Max Length(m)<br />

Max Depth(m) NIL<br />

Min depth(m) NIL In-depth(m) Min.length(m)<br />

Total meterage NIL Total meterage Total length(m)<br />

Remarks<br />

*- all the proposed holes were planned in forest area withnan anticipation to get forest clearance but no<br />

exploration could be carried out due to forest clearance not accorded<br />

c) Cumulative Exploration carried out as on date <strong>of</strong> inspection<br />

No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m) 100x100,<br />

200x200<br />

Max Depth(m) 166m In-depth(m) Max Length(m)<br />

Min. depth(m) 2.3m Min depth(m) Min length(m)<br />

Total meterage 6000.43 Total meterage Total length(m)


9. EXPLORATORY MINING YEAR: No proposal made.<br />

10. EXTENT OF OPEN – PIT DEVELOPMENT<br />

Pit size No. <strong>of</strong><br />

OB<br />

benches<br />

600m x<br />

800m<br />

Ht<br />

bench(m)<br />

Width<br />

(m)<br />

No. <strong>of</strong><br />

benches’<br />

in ore<br />

Ht.(m) Width(m) Pit<br />

depth<br />

(m)<br />

Top<br />

RL<br />

(m)<br />

Bottom<br />

RL (m)<br />

Overall<br />

pit<br />

slope<br />

2 6-12 20-50 5 6-12 20-50 70 712 642


A Mineral Reserve<br />

(1) Proved Mineral Reserve(111)<br />

(2) Probable Mineral Reserve(121 and 122)<br />

B Remaining Resources<br />

(1) Feasibility Mineral Resource(211)<br />

(2) Pre-feasibility Mineral Resource(221 and 222)<br />

(3) Measured Mineral Resource(331)<br />

(4) Indicated Mineral Resource(332)<br />

(5) Inferred Mineral Resource(333)<br />

(6) Reconnaissance Mineral Resource(334)<br />

ii) Annual Production<br />

50.50<br />

-<br />

58.18<br />

-<br />

-<br />

-<br />

-<br />

4.71<br />

Fe > 58%<br />

Fe > 58%<br />

Year Mineral Production (t) Closing stock (t)<br />

2011-12 Iron Ore (ROM) 4419000 327874.485<br />

17. SALE OF MINERAL PRODUCT (MINERAL –WISE )<br />

Sale <strong>of</strong> mineral in the year 2011-12: NIL<br />

Whole ROM is dispatched to Noamundi plant for processing. No sale <strong>of</strong> mineral product is there.<br />

18. SUBGRADE MINERAL AND MINERAL REJECT<br />

a) Sub –grade mineral<br />

Name <strong>of</strong><br />

Mineral<br />

Hematite Cumulative<br />

as on<br />

01.04.2012<br />

During the<br />

year 2011-<br />

12<br />

During the<br />

year 2012-<br />

13<br />

Comm as on<br />

date <strong>of</strong><br />

insecption<br />

b) Mineral reject: NIL<br />

Quantity Quantity % Quantity Nature <strong>of</strong> Grade <strong>of</strong><br />

generated Consumed utilisation Stacked utilisation subgrade<br />

4130077 NIL 0 4130077 NA >45% Fe,<br />


Name <strong>of</strong><br />

Mineral<br />

Cumulative<br />

as on<br />

01.04.<br />

2012<br />

During<br />

previous<br />

year 2011-<br />

12<br />

During the<br />

year 2012-<br />

13<br />

Cumm as<br />

on date <strong>of</strong><br />

inspection<br />

Quantity<br />

generated<br />

Quantity<br />

consumed<br />

Quantity<br />

stacked<br />

19. RECLAMATION / REHABILITATION OF WASTE DUMP:<br />

Nature <strong>of</strong><br />

utilisation<br />

Remarks<br />

No waste dump is existing in the mines. However the details <strong>of</strong> subgrade dump is mentioned below.<br />

Year Qty. <strong>of</strong> S.G.<br />

(tonnes)<br />

Cumula<br />

tive as<br />

on<br />

01.04.<br />

2012<br />

During<br />

previou<br />

s year<br />

2011-12<br />

During<br />

the year<br />

2012-13<br />

Cumm<br />

as on<br />

date <strong>of</strong><br />

Excavate Dump<br />

d ed<br />

4130077 41300<br />

77<br />

252887 25288<br />

7<br />

296042 29604<br />

2<br />

4426119 44261<br />

19<br />

Total area<br />

occupied by<br />

dumps (ha)<br />

Area<br />

stabilized<br />

(ha)<br />

Dead Aliv De Alive Ht An<br />

e ad<br />

gle<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

Dump design (Max-ht,<br />

angle)<br />

Method<br />

<strong>of</strong><br />

stabilisati<br />

on<br />

No. <strong>of</strong><br />

terrace<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

No. <strong>of</strong><br />

dump<br />

stabilised<br />

The dump<br />

is active<br />

The dump<br />

is active<br />

The dump<br />

is active<br />

The dump<br />

is active


inspecti<br />

on<br />

20. RECLAMATION /REHABILITATION OF TAILING PONDS<br />

No proposal for reclamation <strong>of</strong> tailing pond was made.<br />

Year Area occupied<br />

Area stabilised/<br />

Means <strong>of</strong> rehabilitation<br />

(ha)<br />

rehabilitated<br />

Cumulative as on 01.04. 34.9744 0 No proposal for<br />

2012<br />

stabilization. The<br />

During previous year<br />

2011-12<br />

34.9744 0<br />

tailing pond is still active.<br />

During the year 2012-13 34.9744 0<br />

Cumm as on date <strong>of</strong><br />

inspection<br />

34.9744 0<br />

Name<br />

<strong>of</strong> the<br />

new<br />

macine<br />

Name<br />

<strong>of</strong> the<br />

new<br />

macine<br />

21. INPUT /OUTPUT OF MACHINERY PERFORMANCE<br />

A. New Machinery<br />

Sector<br />

Private<br />

/Public<br />

Sub<br />

type<br />

Electric<br />

/diesel<br />

B. Write <strong>of</strong>f machinery<br />

Sector<br />

Private<br />

/Public<br />

Sub<br />

type<br />

Electric<br />

/diesel<br />

Specification<br />

capacity<br />

Specification<br />

capacity<br />

Capacity<br />

unit<br />

Capacity<br />

unit<br />

No.<strong>of</strong><br />

new<br />

items<br />

No.<strong>of</strong><br />

new<br />

items<br />

removed<br />

Origin<br />

Indigenous<br />

/ imported<br />

Origin<br />

Indigenous<br />

/ imported<br />

Purchace<br />

date<br />

Write<br />

<strong>of</strong>f<br />

date<br />

C. Machinery on site<br />

Name <strong>of</strong><br />

machine<br />

Specification Capacity unit No. <strong>of</strong><br />

machine<br />

% <strong>of</strong> availability % <strong>of</strong><br />

utilization<br />

Shovel EX-1100 5.7 cum 2 86% 49%<br />

Shovel EX-1200 5.9 cum 1 86% 47%<br />

Dumper KOMATSU 100 T 7 90% 59%<br />

Drill IDM-30,45 ;ROC<br />

L8<br />

150mm 3 77% 47%<br />

Dozer Komatsu 410hp 1 72% 36%<br />

Grader CAT 280 hp 1 96% 12%<br />

Water<br />

Sprinkler<br />

28KL 1 51% 22%<br />

Cost Commisioning<br />

date<br />

Write<br />

<strong>of</strong>f<br />

Values<br />

22. PLANTATION<br />

Plantation Inside mining lease Outside mining lease<br />

No. <strong>of</strong> trees Area in Rate <strong>of</strong> No. <strong>of</strong> trees Area in<br />

hect survival<br />

hect<br />

Remark<br />

s<br />

Rate <strong>of</strong><br />

survival


Cumulative as on 01.04.<br />

2012<br />

1500 0.5 71.5%<br />

During previous year 2011-<br />

12<br />

1500 0.5 75%<br />

During the year 2012-13 5000 1.5 -<br />

Cumm as on date <strong>of</strong><br />

inspection<br />

6500 2.0 73%<br />

In addition,about 15000 grass plantation is done in 0.07ha area in Fy’12.<br />

23. EMP DATA:Last Month Monitoring Data Enclosed<br />

a) Soil data<br />

(Attached as Annexure-I)<br />

Station no. Type <strong>of</strong> area<br />

Agriculture<br />

Season Physical Chemical Remarks<br />

Station<br />

no.<br />

b) Air Data<br />

(Attached as Annexure-II)<br />

Season<br />

Summer<br />

/Winter<br />

Monsoon<br />

/Post<br />

Monsoon<br />

c) Noise Data<br />

(Attached as Annexure-III)<br />

Station no. Station<br />

Name<br />

d) Water Data<br />

(Attached as Annexure-IV)<br />

i) Discharge place ( Agriculture<br />

land/Forest<br />

land/Wasteland/Nallah/River<br />

SPM Pb So2 NOX CO Free<br />

silica<br />

Season Type <strong>of</strong> area ( Industrial<br />

commercial/residential<br />

/Silence zone<br />

Rpm Rate <strong>of</strong><br />

dust<br />

fall<br />

Rem<br />

arks<br />

Day time Night time Remarks<br />

ii) Water management in ababdoned quarries<br />

Year Quarry Reservace Quarry Capacity Capacity Period Period Water Remarks


S.No<br />

.<br />

1<br />

pit ID Yes/No size min. max. capacity<br />

min.<br />

iii) Water data details<br />

Year Station<br />

no.<br />

Station<br />

name<br />

Station<br />

type(coloney<br />

,pit,river,dow<br />

n stream)<br />

Seas<br />

on<br />

iv) Vibration Data<br />

(Attached as Annexure-V)<br />

Station no. Station Season<br />

name (Summer/Winter/Monso<br />

on/Post Monsoon)<br />

Elements(<br />

drinking/E<br />

ffluent)<br />

Par<br />

am<br />

eter<br />

na<br />

me<br />

Peak particle<br />

velocity<br />

Paramete<br />

r value<br />

capacity<br />

max.<br />

Air over<br />

pressure<br />

Excess<br />

value<br />

utilization<br />

Re<br />

ma<br />

rks<br />

Freque<br />

ncy<br />

Exce<br />

ss<br />

value<br />

Rermarks<br />

24. COMMUNITY DEVELOPMENT:<br />

(a) FACILITIES MADE AVAILABLE TO THE COMMUNITY INSIDE & OUTSIDE CORE ZONE<br />

(LEASE AREA)<br />

Proposed action<br />

towards<br />

Socioeconomic<br />

development<br />

during the<br />

month<br />

General<br />

Development in<br />

area<br />

Expenditure<br />

proposed for<br />

the year<br />

2011-12<br />

Expenditure<br />

incurred in<br />

2011-12<br />

Expenditure<br />

proposed for<br />

the year<br />

2012-13<br />

Expenditure<br />

actually<br />

incurred upto<br />

Aug'12 for<br />

the year<br />

2012-13<br />

Remarks<br />

a) Housing<br />

b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />

c) Sanitaion 102 2.81 10.00 0.00<br />

d) Health 48.6 1.5 8.00 0.20<br />

2 Training 11.29 0.7 25.00<br />

3<br />

4<br />

Employment to<br />

local inhabitants<br />

inhabitants 7.036 1.26<br />

Infrastrucure<br />

(Civil jobs<br />

14.00 1.75<br />

including roads) 529 434.2 140.00 81.85<br />

a)Constructional<br />

work(School<br />

,Community<br />

Centre etc)<br />

Health camps,medicine<br />

distribution<br />

Mason,carpentary,winding,w<br />

elding<br />

Kharif seeds, grocery,<br />

fingerlings, Pady fan,<br />

Sprayer machine<br />

Construction community<br />

centre & Boundary wall<br />

0.90 School building<br />

b)Irrigation 2.9 Ponds


5 Education 0.03 23.00 1.13<br />

6 Sports Activities<br />

Environment<br />

1.5 1.34 5.00 0.20<br />

7 Management 3.75 2.00<br />

Gross Total 928.176 573.31 292.00 94.73<br />

25. PROPOSAL FOR FURTHER ACTION<br />

a) <strong>Indian</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Mines</strong> (any issue related to CGPB, SGPB, assistance, consultancy,<br />

annual programme and studies etc.<br />

b) The State Government (illegal mining, mining dispute, infrastructure, mineral based<br />

industry, mineral policy & etc.)<br />

c) The Central Government (infrastructure development, mineral policy and legislation,<br />

mineral based industry & etc.)<br />

SALIENT ACHIEVEMENTS<br />

SYSTEMATIC DEVELOPMENT OF MINERAL<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

PROTECTION OF ENVIRONMENT<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

CONSERVATION OF MINERALS<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

Date: Signature <strong>of</strong> Mine Manager/ Mining Engineer<br />

Distribution <strong>of</strong> stationeries in<br />

schools, Coaching classes for<br />

8th to 10th std.<br />

Inter village Football<br />

Tounament

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!