27.09.2012 - Indian Bureau of Mines
27.09.2012 - Indian Bureau of Mines
27.09.2012 - Indian Bureau of Mines
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MCDR INSPECTION REPORT<br />
INDIAN BUREAU OF MINES<br />
MINES CONTROL AND CONSERVATION OF MINERALS DIVISION<br />
BHUBANESWAR REGIONAL OFFICE<br />
Mine file no. ORI/MN/KJR/MCDR-39/BBS<br />
Mine code No. 30 ORI 08035<br />
1) Name <strong>of</strong> Inspecting <strong>of</strong>ficer : Mr. Prem Prakash<br />
2) Designation : Sr.Assistant Controller <strong>of</strong> <strong>Mines</strong><br />
3) Accompanying mine <strong>of</strong>ficial with designation: Mr. T K Jena ,Manager <strong>Mines</strong><br />
4) Date <strong>of</strong> Inspection : <strong>27.09.2012</strong><br />
5) Date <strong>of</strong> Previous Inspection : 15.06.2011<br />
PART –I GENERAL INFORMATION<br />
1. (a) Name <strong>of</strong> the Mine : Katamati Iron Mine<br />
(b) Name <strong>of</strong> Lessee :Tata Steel Ltd.<br />
(c ) Category <strong>of</strong> Mine : A-Fully Mechanized.<br />
(d) Mode <strong>of</strong> working : OC<br />
(e) Location <strong>of</strong> Mine<br />
State : Odisha<br />
District : Keonjhar<br />
Tehsil/Taluka : Barbil<br />
Police Station : Joda<br />
Village : Deojhar<br />
Post/Pin Code : Deojhar/758038<br />
(f) Date <strong>of</strong> first opening : May 1934<br />
(g) Weekly day <strong>of</strong> rest : Sunday<br />
(h) Status <strong>of</strong> Mine :Working<br />
(i) Mine Correspondence address:-<br />
Phone : 9234301340<br />
Fax : 06596-290737<br />
E-Mail : gm.<strong>of</strong>fice@tatasteel.com<br />
2. Lease No.<br />
a. Lease area in ha with forest area, if any:<br />
Lease area – 403.3238 ha<br />
Forest – 199.1720 ha<br />
Non Forest –204.1518 ha<br />
b. Period <strong>of</strong> lease : 20 years (17.01.83 to 16.01.03)<br />
c..In case <strong>of</strong> forest area if the permission has been taken,<br />
its details like area permitted to be worked and letter no. etc.: the forest clearance has not<br />
yet granted<br />
d If the area is worked on any interim<br />
Govt. order, or court order, its details. : N/A<br />
e. Date <strong>of</strong> Expiry : 16.1.2003 (Under Deemed Renewal)<br />
3. (a)Mineral(s) included in the lease deed: Iron Ore<br />
(b) Mineral worked :Iron Ore<br />
4. Name and address <strong>of</strong> (incl.FAX, E-Mail, if any)<br />
a) Lessee address 24,Homi Modi street, Fort<br />
Bombay house,Mumbai-400001<br />
b) i)Nominated owner with address Mr. H M Nerurkar<br />
M.D. Tata Steel, Jamshedpur<br />
ii)Date <strong>of</strong> appointment 09.04.2009
c) i)Name <strong>of</strong> Agent with address Mr. S.Kuchroo<br />
Tata Steel Ltd., Noamundi<br />
Singhbhum west, Jharkhand<br />
ii) Date <strong>of</strong> appointment 1.08.2010<br />
d) i)Mining engineer(whole/part time)<br />
Mr Tapan kumar Jena<br />
Phone/fax nos<br />
Mob.09234554362<br />
ii)Education Qualification B.E(Mining)<br />
iii)Date <strong>of</strong> appointment 6.6.2011<br />
e) i)Manager Mr Tapan kumar Jena<br />
ii)Education Qualification B.E(Mining)<br />
iii)Date <strong>of</strong> appointment 6.6.2011<br />
f ) i)Geologist Vijay A Verlekar<br />
ii)Education Qualification MSc geology<br />
iii)Date <strong>of</strong> appointment 15.6.2011<br />
5. Details about Mining plan/Mining Scheme<br />
a) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />
plan<br />
b) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />
scheme<br />
c) Condition while approving the MP/MS/<br />
Modification<br />
d) Period <strong>of</strong> mining plan/mining scheme in<br />
force:<br />
-- 314(3)/ 2000/MCCM(C)/MP-14<br />
DT: 06.07.2001<br />
-- 29.09.2009<br />
-- General<br />
-- From 2008-2009 to 2012-13<br />
(Financial Year)<br />
PART II-Technical details/ documen<br />
1. Details about employment.<br />
Maximum number <strong>of</strong> persons employed on any day during the year(i) below ground (ii) above ground<br />
and (iii) in all in the mines. 146 on 28.02.2012<br />
Classification Average daily employment Average No. <strong>of</strong><br />
Direct Contract Total days worked in<br />
a year<br />
OPENCAST<br />
a) Managerial person 7 - 7 312<br />
b) Supervisory persons 2 - 2<br />
c) Workers 44 - 44<br />
d) Ministerial persons 6 - 6<br />
c) Employment in plant - 35 35<br />
f) Others - 2 2<br />
UNDERGROUND<br />
- - -<br />
Remarks<br />
a) Managerial person* - - -<br />
b) Supervisory persons - - -<br />
c) Workers - - -<br />
d) Ministerial persons - - -<br />
c) Employment in plant - - -<br />
f) Others - - - * If common,<br />
please state
S.No<br />
.<br />
2. Community Development Plan (in and around the mines) :<br />
Proposed action<br />
towards<br />
Socioeconomic<br />
development<br />
during t the year<br />
General<br />
Development in<br />
area<br />
Expenditure<br />
proposed for<br />
the year<br />
2011-12<br />
Expenditure<br />
incurred in<br />
2011-12<br />
Expenditure<br />
proposed for<br />
the year<br />
2012-13<br />
Expenditure<br />
actually<br />
incurred upto<br />
Aug'12 for<br />
the year<br />
2012-13<br />
Remarks<br />
1 a) Housing<br />
b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />
c) Sanitaion 102 2.81 10.00 0.00<br />
d) Health 48.6 1.5 8.00 0.20<br />
2 Training 11.29 0.7 25.00<br />
3<br />
4<br />
Employment to<br />
local inhabitants<br />
inhabitants 7.036 1.26<br />
Infrastrucure<br />
(Civil jobs<br />
14.00 1.75<br />
including roads) 529 434.2 140.00 81.85<br />
a)Constructional<br />
work(School<br />
,Community<br />
Centre etc)<br />
Health camps,medicine<br />
distribution<br />
Mason,carpentary,winding,w<br />
elding<br />
Kharif seeds, grocery,<br />
fingerlings, Pady fan,<br />
Sprayer machine<br />
Construction community<br />
centre & Boundary wall<br />
0.90 School building<br />
b)Irrigation 2.9 Ponds<br />
5 Education 0.03 23.00 1.13<br />
6 Sports Activities<br />
Environment<br />
1.5 1.34 5.00 0.20<br />
7 Management 3.75 2.00<br />
Gross Total 928.176 573.31 292.00 94.73<br />
Distribution <strong>of</strong> stationeries in<br />
schools, Coaching classes for<br />
8th to 10th std.<br />
Inter village Football<br />
Tounament<br />
3. Status <strong>of</strong> compliance <strong>of</strong> MCDR.88 including therewith the rectification <strong>of</strong> outstanding violation <strong>of</strong> the<br />
rules.<br />
Date <strong>of</strong> last<br />
inspection<br />
Violation pointed out Compliance reported<br />
15.06.2011 Rule 13 (1), 16 (1) & 33(2) complied<br />
During current inspection, No serious/ major violation <strong>of</strong> MCDR’88 was observed.<br />
4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 13(2) or prohibition <strong>of</strong><br />
deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.:<br />
Not recommended
(b) If rule 13(2) or 56 has been imposed in the past, its details needs to be included specially giving reasons<br />
and letter number. : NA<br />
5.Scientific mining (As per latest approved mining plan/scheme)<br />
Item Proposal Actual work done Remarks<br />
i) Exploration (Rule 13)<br />
(2011-12) (2011-12)<br />
a) Type <strong>of</strong> prospecting and exploration i.e. drilling,<br />
NIL proposed bore<br />
pitting, drilling etc.<br />
15m,750m<br />
holes were in<br />
b) Total area covered<br />
ii) Workings (Rule 13)<br />
16 ha NIL forest area and the<br />
forest clearance has<br />
not yet granted/<br />
obtained<br />
a) Opencast/ underground Opencast Opencast<br />
b) Manual/ mechanized Mechanized Mechanized<br />
c) No. and size <strong>of</strong> each pit (L x W x H) one one<br />
d) Bench size (1 x w x h) length can be Width:25m Width:25m<br />
defined as regular or irregular<br />
Height:12m approx<br />
Regular<br />
Height:12m<br />
appreox<br />
Regular<br />
e) Ore to waste ratio pit wise if possible<br />
otherwise for mine.<br />
1:0.11 1:0.14<br />
f) Total area covered under excavation/pits Not specific for the<br />
year<br />
--g)<br />
Production<br />
iii) Waste disposal (Rule 13)<br />
7.02 mill. te 4.42 mill. te<br />
a) Location <strong>of</strong> dumps Dump no.3 Dump no.3 .<br />
b) Method <strong>of</strong> dumping whether advancing/<br />
retreat<br />
Retreating Retreating<br />
c) Total area covered under waste dump Not specific for the<br />
year<br />
--d)<br />
No. & size <strong>of</strong> each waste dump with<br />
number <strong>of</strong> steps lift/ bench.<br />
02 nos. 02 nos.<br />
e) Yearly generation <strong>of</strong> waste quantity. 630000 348000<br />
f) Year-wise quantity <strong>of</strong> top soil removed,<br />
utilized & stacked.<br />
NIL NIL<br />
6.Conservation <strong>of</strong> mineral-both quantitative and qualitative.<br />
i) Mineral (Rule 15)<br />
A1 No benches in ore and waste waste-2, Ore-5<br />
A2 Percentage <strong>of</strong> recovery <strong>of</strong> ore pit –wise w.r.t. ROM Total About 95 %<br />
materials<br />
ii) Sub grade mineral / fines ( Rule 16 )<br />
B1 Separate stacking from waste Separate Subgrade Dump is<br />
maintained<br />
B2 Location <strong>of</strong> stacking 11900E to 12250E and 9850N<br />
to 10250N<br />
B3 Total area covered for stacking 8.02 ha<br />
B4 No. & size <strong>of</strong> each stack 1, 360x400, 3 steps<br />
B5 Quantity <strong>of</strong> Yearly generation utilisation & total quantity<br />
Available during inspection with grade<br />
252887 tonnes(FY’2011-12),
iii)Beneficiation ( Rule 20 )<br />
C1 Efforts for improving<br />
low grade & sub grade<br />
mineral<br />
C2 Efforts for improving<br />
percentage <strong>of</strong> recovery<br />
<strong>of</strong> ore<br />
7. Environment Management both quantitative & qualitative:<br />
A Land Environment<br />
A1) Landscape : Hilly<br />
A2) Aesthetic Environment: Satisfactory<br />
ROM is despatched to Noamundi wet Processing plant for<br />
beneficiation <strong>of</strong> low grade & subgrade ore .<br />
Hydrocyclone & jigging plant is introduced at Noamundi Processing<br />
plant to improve recovery <strong>of</strong> iron values from fines.<br />
A3) Soil & land use pattern: Top soil is stored separately & subsequently used for plantation.<br />
A4) Agriculture: No Agriculture land was there within the lease<br />
A5) Forest (Flora & fauna) :Diversified flora species & fauna exist inside the lease.<br />
A6) Vegetation: vegetation disturbed only in broken area.<br />
A7) Public building, places & monuments (protected monument & historical monument),<br />
Places <strong>of</strong> worship & places <strong>of</strong> tourist interest. : No monuments within the lease.<br />
B Water Environment:<br />
B1) Surface water: Toewall,garland drain etc. are provided around the<br />
dump to prevent the contamination <strong>of</strong> surface water.<br />
B2 ) Ground water : Ground Water table not intercepted yet due to opencast working.<br />
B3) Quality <strong>of</strong> water: The water quality is monitored regularly and all the parameters are<br />
within the permissible limit.<br />
C) Air Environment :<br />
C1) Noise : Monitoring is done regularly & noise levels are within the permissible limit.<br />
C2) Air : Monitoring is done regularly & parameters are within the permissible limit.<br />
C3) Climatic condition : Sub-tropical<br />
D) Socio economic environment:<br />
D1) Social & demographic pr<strong>of</strong>ile : Within the colony there is presence <strong>of</strong> people <strong>of</strong> different<br />
region and religion and <strong>of</strong> varied demographic.<br />
D2) Recommending health & safety : OHSAS-18001 system is in place and hence OHS aspect<br />
is taken care.<br />
D3) Human settlement :Within the ML area there is a colony for employees.<br />
D4)Recreational facility : recreational facilities being provided for the<br />
employee like parks ,garden,club,fountain park etc<br />
8. Sensitive technical items on conservation <strong>of</strong> mineral, scientific mining and protection <strong>of</strong> Environment: Is<br />
being taken care as per mining plan (Specific issues that are required to be kept in focus for examination &<br />
monitoring should be stated here) : There is no specific issues.
9. Scrutiny <strong>of</strong> annual return on cost <strong>of</strong> operation. Reserves, production, pit mouth value, stock, land use<br />
pattern and fixe assets for the year 2011-12.:<br />
(revised annual return for the year 2011-12 submitted to this <strong>of</strong>fice and available in the file is referred)<br />
a) Production:2011-12 -- 4419000 Tons (ROM)<br />
b) Cost <strong>of</strong> operation Rs 571.76 per ton<br />
c) Pit’s Mouth Value Rs 571.76 per ton (captive Mine)<br />
d) Reserves 50.50 million tonnes (cat.111)<br />
e) Stock at <strong>Mines</strong> head 337874.485 tonnes (ROM)<br />
f) Land Use Mining & allied activities.<br />
PART - III – PERFORMANCE OF MINES – NA<br />
PART - IV – PROPOSAL FOR FURTHER ACTION FOR<br />
a) <strong>Indian</strong> <strong>Bureau</strong>e <strong>of</strong> <strong>Mines</strong> (Any issue related to CGPB,SGPB, assistance,consultancy, annual<br />
programme and studies etc.) :Nil<br />
b) The state government(Illegal mining, mining dispute, infrastructure, mineral based industry,<br />
mineral policy etc) : nil<br />
c) The central govt. (infrastructure development, mineral policy and legislation, mineral based<br />
industry etc.) : Nil<br />
MCDR DATABASE<br />
Prem Prakash<br />
Senior Assistant Controller <strong>of</strong> <strong>Mines</strong><br />
INDIAN BUREAUE OF MINES.
1. Mine Details 2. Inspection details<br />
Name <strong>of</strong> Mine Katamati Iron Mine Mine file No.<br />
Name <strong>of</strong> the lessee M/S-TATA STEEL Mine Code No 301807035<br />
Lease Area 403.3238 Ha Date <strong>of</strong> first opening May 1934<br />
Date <strong>of</strong> execution 27.10.84 Date <strong>of</strong> inspection 15.6.11<br />
Expiry Date 16.1.2003(Under Deemed Earlier two dates <strong>of</strong> inspection 3.8.2010 &<br />
Renewal)<br />
15.06.2011<br />
State Odisha Name & Designation <strong>of</strong> the Mr. Prem Prakash<br />
inspecting <strong>of</strong>ficer<br />
Sr. ACOM<br />
District<br />
Keonjhar<br />
ID <strong>of</strong> inspecting <strong>of</strong>ficer<br />
MCDR Inspection<br />
Police Station<br />
Joda<br />
Type <strong>of</strong> inspection<br />
Post Deojhar Name & designation <strong>of</strong> mine<br />
Official accompanying)<br />
Village Deojhar Weekly day <strong>of</strong> rest Sunday<br />
Pin Code 758038 Type <strong>of</strong> Mine(OC,UG, BOTH) OC<br />
Phone Category <strong>of</strong> mines (A-Mech, A1-<br />
Manual, B-Manual, B1-Very<br />
small)<br />
A-Mech<br />
3. LAND DETAILS ( WITHIN LEASE AREA )<br />
Mr. T K Jena<br />
Mgr.(<strong>Mines</strong>),<br />
Mr. Indranil<br />
Saha,(geologist)<br />
Mr.Rajesh Kumar<br />
(Sr.Mgr.Operations)
Code Type <strong>of</strong> land Area ha Code Type <strong>of</strong> land Area ha<br />
1 Reserve forest 57.5520 18 Degraded by dump 8.0169<br />
2 Protected forest 141.6200 19 Degraded land by pit in forest 17.6022<br />
3 Forest unclassified 0 20 Degtraded land by dump in forest 0<br />
4 Forest sanctuary 0 21 Degraded land by pit in non forest 33.7716<br />
5 Forest National Park 0 22 Degraded land by dump in non forest 8.0169<br />
6 Forest Mineralized 23 Degraded land by road in forest 4.9535<br />
7 Forest Non Mineralized 24 Degraded land by road in non forest 0<br />
8 Non-Forest Pvt. Land 0.077 25 Degraded land by plant, building, town<br />
in forest<br />
0<br />
9 Non-Forest Agricultural 0 26 Degraded land by plant, building, town 7.3299<br />
Irrigated land<br />
in non forest<br />
10 Non-Forest agricultural non<br />
irrigated land<br />
70.9212 27 Degraded by tailing pond in Forest 5.1434<br />
11 Non-Forest private , other land 0 28 Degraded by tailing pond in non Forest 21.8141<br />
12 Non-Forest Govt. grazing land. 0 29 Degraded land others in forest(railway<br />
abandoned)<br />
3.48<br />
13 Non- Forest Govt. waste land 129.119 30 Degraded land others in non<br />
forest(railway abandoned)<br />
3.00<br />
14 Non-forest Govt. other land 4.0347 31 Forest land acquired 199.1720<br />
15 Non Forest Mineralised. 32 Non forest land acquired 193.77<br />
16 Non Forest non mineralized land 33 Area in forest 199.1720<br />
17 Degraded land by pit 51.3738 34 Area in Non forest 204.1518<br />
4. Mineral:<br />
Main<br />
Mineral(s)<br />
Associated<br />
Mineral(s)<br />
Captive<br />
use<br />
End<br />
Product<br />
Non-captive use<br />
Domestic Export<br />
Yes No Yes No<br />
Iron Ore Yes Steel Yes<br />
5. MINING PLAN/MINING SCHEME<br />
Date <strong>of</strong> approval <strong>of</strong> mining plan with<br />
no<br />
No. 314(3)/2000-MCCM(C)/MP14.<br />
Dated 6.7.2001 valid from 2001-02 to<br />
2007-08<br />
Mining plan modified vide letter<br />
No.314(3)/ 2007- MCCM(C)/MP-2<br />
Dated: 19.7.07 valid from<br />
2006-07 to 2007-08<br />
6. NOMINATED OWNER /AGENT DATA<br />
Additional<br />
conditions<br />
Approval<br />
letter<br />
attached<br />
Approval<br />
letter<br />
attached<br />
Date <strong>of</strong> approval<br />
<strong>of</strong> mining scheme<br />
Ist Scheme <strong>of</strong> Mining<br />
314(3)/2009/MCCM(C)/MS/19<br />
dated 29.09.2009 valid from 2008-<br />
09 to 2012-13<br />
A. Lessee B. Owner C. Agent<br />
Name <strong>of</strong> TATA STEEL H. M. Nerurkar S . Kuchroo<br />
Date <strong>of</strong> nomination 09.04.2009 1.8.2010<br />
Postal address,State Jharkhand Jharkhand<br />
District E.Singhbhum W.Singhbhum<br />
Village & Post Jamshedpur Noamundi<br />
Pin Code 831001 833217<br />
Remarks<br />
Remarks
Fax<br />
E-mail<br />
Phone<br />
7. MINING ENGINER /GEOLOGIST DATA (APPOINTED UNDER RULE 42 OF MCDR,1988)<br />
AND MINES MANAGER ( APPOINTED UNDER MMR ,1961 )<br />
Status Name Designation Educational Date <strong>of</strong><br />
Qualification appointment<br />
Mining Tapan Kumar Head, B. E (Mining) 6/6/2011<br />
Engineer/ Jena Katamati<br />
Geologist Viraj A<br />
Verlekar<br />
Geologist M.Sc.(Geology) 15/6/2011<br />
Manager Tapan Kumar Head, B. E (Mining) 6/6/2011<br />
Jena Katamati<br />
8.EXPLORATION:<br />
a)Cumulative exlploration as on 1.4.2011<br />
No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />
Grid Interval (m) 100x100,<br />
200x200<br />
Max Depth(m) 166m Max Depth(m) Max length(m)<br />
Min depth(m) 2.3m In-depth(m) Min.length(m)<br />
Total meterage 6000.43 Total meterage Total length<br />
b) Exploration carried out during the year 2011-12<br />
No <strong>of</strong> boreholes NIL* Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />
Grid Interval (m)<br />
Max Depth(m)<br />
NA Max Length(m)<br />
Max Depth(m) NIL<br />
Min depth(m) NIL In-depth(m) Min.length(m)<br />
Total meterage NIL Total meterage Total length(m)<br />
Remarks<br />
*- all the proposed holes were planned in forest area withnan anticipation to get forest clearance but no<br />
exploration could be carried out due to forest clearance not accorded<br />
c) Cumulative Exploration carried out as on date <strong>of</strong> inspection<br />
No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />
Grid Interval (m) 100x100,<br />
200x200<br />
Max Depth(m) 166m In-depth(m) Max Length(m)<br />
Min. depth(m) 2.3m Min depth(m) Min length(m)<br />
Total meterage 6000.43 Total meterage Total length(m)
9. EXPLORATORY MINING YEAR: No proposal made.<br />
10. EXTENT OF OPEN – PIT DEVELOPMENT<br />
Pit size No. <strong>of</strong><br />
OB<br />
benches<br />
600m x<br />
800m<br />
Ht<br />
bench(m)<br />
Width<br />
(m)<br />
No. <strong>of</strong><br />
benches’<br />
in ore<br />
Ht.(m) Width(m) Pit<br />
depth<br />
(m)<br />
Top<br />
RL<br />
(m)<br />
Bottom<br />
RL (m)<br />
Overall<br />
pit<br />
slope<br />
2 6-12 20-50 5 6-12 20-50 70 712 642
A Mineral Reserve<br />
(1) Proved Mineral Reserve(111)<br />
(2) Probable Mineral Reserve(121 and 122)<br />
B Remaining Resources<br />
(1) Feasibility Mineral Resource(211)<br />
(2) Pre-feasibility Mineral Resource(221 and 222)<br />
(3) Measured Mineral Resource(331)<br />
(4) Indicated Mineral Resource(332)<br />
(5) Inferred Mineral Resource(333)<br />
(6) Reconnaissance Mineral Resource(334)<br />
ii) Annual Production<br />
50.50<br />
-<br />
58.18<br />
-<br />
-<br />
-<br />
-<br />
4.71<br />
Fe > 58%<br />
Fe > 58%<br />
Year Mineral Production (t) Closing stock (t)<br />
2011-12 Iron Ore (ROM) 4419000 327874.485<br />
17. SALE OF MINERAL PRODUCT (MINERAL –WISE )<br />
Sale <strong>of</strong> mineral in the year 2011-12: NIL<br />
Whole ROM is dispatched to Noamundi plant for processing. No sale <strong>of</strong> mineral product is there.<br />
18. SUBGRADE MINERAL AND MINERAL REJECT<br />
a) Sub –grade mineral<br />
Name <strong>of</strong><br />
Mineral<br />
Hematite Cumulative<br />
as on<br />
01.04.2012<br />
During the<br />
year 2011-<br />
12<br />
During the<br />
year 2012-<br />
13<br />
Comm as on<br />
date <strong>of</strong><br />
insecption<br />
b) Mineral reject: NIL<br />
Quantity Quantity % Quantity Nature <strong>of</strong> Grade <strong>of</strong><br />
generated Consumed utilisation Stacked utilisation subgrade<br />
4130077 NIL 0 4130077 NA >45% Fe,<br />
Name <strong>of</strong><br />
Mineral<br />
Cumulative<br />
as on<br />
01.04.<br />
2012<br />
During<br />
previous<br />
year 2011-<br />
12<br />
During the<br />
year 2012-<br />
13<br />
Cumm as<br />
on date <strong>of</strong><br />
inspection<br />
Quantity<br />
generated<br />
Quantity<br />
consumed<br />
Quantity<br />
stacked<br />
19. RECLAMATION / REHABILITATION OF WASTE DUMP:<br />
Nature <strong>of</strong><br />
utilisation<br />
Remarks<br />
No waste dump is existing in the mines. However the details <strong>of</strong> subgrade dump is mentioned below.<br />
Year Qty. <strong>of</strong> S.G.<br />
(tonnes)<br />
Cumula<br />
tive as<br />
on<br />
01.04.<br />
2012<br />
During<br />
previou<br />
s year<br />
2011-12<br />
During<br />
the year<br />
2012-13<br />
Cumm<br />
as on<br />
date <strong>of</strong><br />
Excavate Dump<br />
d ed<br />
4130077 41300<br />
77<br />
252887 25288<br />
7<br />
296042 29604<br />
2<br />
4426119 44261<br />
19<br />
Total area<br />
occupied by<br />
dumps (ha)<br />
Area<br />
stabilized<br />
(ha)<br />
Dead Aliv De Alive Ht An<br />
e ad<br />
gle<br />
5.04 42 37.<br />
5<br />
5.04 42 37.<br />
5<br />
5.04 42 37.<br />
5<br />
5.04 42 37.<br />
5<br />
Dump design (Max-ht,<br />
angle)<br />
Method<br />
<strong>of</strong><br />
stabilisati<br />
on<br />
No. <strong>of</strong><br />
terrace<br />
3 Plantatio<br />
n<br />
3 Plantatio<br />
n<br />
3 Plantatio<br />
n<br />
3 Plantatio<br />
n<br />
No. <strong>of</strong><br />
dump<br />
stabilised<br />
The dump<br />
is active<br />
The dump<br />
is active<br />
The dump<br />
is active<br />
The dump<br />
is active
inspecti<br />
on<br />
20. RECLAMATION /REHABILITATION OF TAILING PONDS<br />
No proposal for reclamation <strong>of</strong> tailing pond was made.<br />
Year Area occupied<br />
Area stabilised/<br />
Means <strong>of</strong> rehabilitation<br />
(ha)<br />
rehabilitated<br />
Cumulative as on 01.04. 34.9744 0 No proposal for<br />
2012<br />
stabilization. The<br />
During previous year<br />
2011-12<br />
34.9744 0<br />
tailing pond is still active.<br />
During the year 2012-13 34.9744 0<br />
Cumm as on date <strong>of</strong><br />
inspection<br />
34.9744 0<br />
Name<br />
<strong>of</strong> the<br />
new<br />
macine<br />
Name<br />
<strong>of</strong> the<br />
new<br />
macine<br />
21. INPUT /OUTPUT OF MACHINERY PERFORMANCE<br />
A. New Machinery<br />
Sector<br />
Private<br />
/Public<br />
Sub<br />
type<br />
Electric<br />
/diesel<br />
B. Write <strong>of</strong>f machinery<br />
Sector<br />
Private<br />
/Public<br />
Sub<br />
type<br />
Electric<br />
/diesel<br />
Specification<br />
capacity<br />
Specification<br />
capacity<br />
Capacity<br />
unit<br />
Capacity<br />
unit<br />
No.<strong>of</strong><br />
new<br />
items<br />
No.<strong>of</strong><br />
new<br />
items<br />
removed<br />
Origin<br />
Indigenous<br />
/ imported<br />
Origin<br />
Indigenous<br />
/ imported<br />
Purchace<br />
date<br />
Write<br />
<strong>of</strong>f<br />
date<br />
C. Machinery on site<br />
Name <strong>of</strong><br />
machine<br />
Specification Capacity unit No. <strong>of</strong><br />
machine<br />
% <strong>of</strong> availability % <strong>of</strong><br />
utilization<br />
Shovel EX-1100 5.7 cum 2 86% 49%<br />
Shovel EX-1200 5.9 cum 1 86% 47%<br />
Dumper KOMATSU 100 T 7 90% 59%<br />
Drill IDM-30,45 ;ROC<br />
L8<br />
150mm 3 77% 47%<br />
Dozer Komatsu 410hp 1 72% 36%<br />
Grader CAT 280 hp 1 96% 12%<br />
Water<br />
Sprinkler<br />
28KL 1 51% 22%<br />
Cost Commisioning<br />
date<br />
Write<br />
<strong>of</strong>f<br />
Values<br />
22. PLANTATION<br />
Plantation Inside mining lease Outside mining lease<br />
No. <strong>of</strong> trees Area in Rate <strong>of</strong> No. <strong>of</strong> trees Area in<br />
hect survival<br />
hect<br />
Remark<br />
s<br />
Rate <strong>of</strong><br />
survival
Cumulative as on 01.04.<br />
2012<br />
1500 0.5 71.5%<br />
During previous year 2011-<br />
12<br />
1500 0.5 75%<br />
During the year 2012-13 5000 1.5 -<br />
Cumm as on date <strong>of</strong><br />
inspection<br />
6500 2.0 73%<br />
In addition,about 15000 grass plantation is done in 0.07ha area in Fy’12.<br />
23. EMP DATA:Last Month Monitoring Data Enclosed<br />
a) Soil data<br />
(Attached as Annexure-I)<br />
Station no. Type <strong>of</strong> area<br />
Agriculture<br />
Season Physical Chemical Remarks<br />
Station<br />
no.<br />
b) Air Data<br />
(Attached as Annexure-II)<br />
Season<br />
Summer<br />
/Winter<br />
Monsoon<br />
/Post<br />
Monsoon<br />
c) Noise Data<br />
(Attached as Annexure-III)<br />
Station no. Station<br />
Name<br />
d) Water Data<br />
(Attached as Annexure-IV)<br />
i) Discharge place ( Agriculture<br />
land/Forest<br />
land/Wasteland/Nallah/River<br />
SPM Pb So2 NOX CO Free<br />
silica<br />
Season Type <strong>of</strong> area ( Industrial<br />
commercial/residential<br />
/Silence zone<br />
Rpm Rate <strong>of</strong><br />
dust<br />
fall<br />
Rem<br />
arks<br />
Day time Night time Remarks<br />
ii) Water management in ababdoned quarries<br />
Year Quarry Reservace Quarry Capacity Capacity Period Period Water Remarks
S.No<br />
.<br />
1<br />
pit ID Yes/No size min. max. capacity<br />
min.<br />
iii) Water data details<br />
Year Station<br />
no.<br />
Station<br />
name<br />
Station<br />
type(coloney<br />
,pit,river,dow<br />
n stream)<br />
Seas<br />
on<br />
iv) Vibration Data<br />
(Attached as Annexure-V)<br />
Station no. Station Season<br />
name (Summer/Winter/Monso<br />
on/Post Monsoon)<br />
Elements(<br />
drinking/E<br />
ffluent)<br />
Par<br />
am<br />
eter<br />
na<br />
me<br />
Peak particle<br />
velocity<br />
Paramete<br />
r value<br />
capacity<br />
max.<br />
Air over<br />
pressure<br />
Excess<br />
value<br />
utilization<br />
Re<br />
ma<br />
rks<br />
Freque<br />
ncy<br />
Exce<br />
ss<br />
value<br />
Rermarks<br />
24. COMMUNITY DEVELOPMENT:<br />
(a) FACILITIES MADE AVAILABLE TO THE COMMUNITY INSIDE & OUTSIDE CORE ZONE<br />
(LEASE AREA)<br />
Proposed action<br />
towards<br />
Socioeconomic<br />
development<br />
during the<br />
month<br />
General<br />
Development in<br />
area<br />
Expenditure<br />
proposed for<br />
the year<br />
2011-12<br />
Expenditure<br />
incurred in<br />
2011-12<br />
Expenditure<br />
proposed for<br />
the year<br />
2012-13<br />
Expenditure<br />
actually<br />
incurred upto<br />
Aug'12 for<br />
the year<br />
2012-13<br />
Remarks<br />
a) Housing<br />
b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />
c) Sanitaion 102 2.81 10.00 0.00<br />
d) Health 48.6 1.5 8.00 0.20<br />
2 Training 11.29 0.7 25.00<br />
3<br />
4<br />
Employment to<br />
local inhabitants<br />
inhabitants 7.036 1.26<br />
Infrastrucure<br />
(Civil jobs<br />
14.00 1.75<br />
including roads) 529 434.2 140.00 81.85<br />
a)Constructional<br />
work(School<br />
,Community<br />
Centre etc)<br />
Health camps,medicine<br />
distribution<br />
Mason,carpentary,winding,w<br />
elding<br />
Kharif seeds, grocery,<br />
fingerlings, Pady fan,<br />
Sprayer machine<br />
Construction community<br />
centre & Boundary wall<br />
0.90 School building<br />
b)Irrigation 2.9 Ponds
5 Education 0.03 23.00 1.13<br />
6 Sports Activities<br />
Environment<br />
1.5 1.34 5.00 0.20<br />
7 Management 3.75 2.00<br />
Gross Total 928.176 573.31 292.00 94.73<br />
25. PROPOSAL FOR FURTHER ACTION<br />
a) <strong>Indian</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Mines</strong> (any issue related to CGPB, SGPB, assistance, consultancy,<br />
annual programme and studies etc.<br />
b) The State Government (illegal mining, mining dispute, infrastructure, mineral based<br />
industry, mineral policy & etc.)<br />
c) The Central Government (infrastructure development, mineral policy and legislation,<br />
mineral based industry & etc.)<br />
SALIENT ACHIEVEMENTS<br />
SYSTEMATIC DEVELOPMENT OF MINERAL<br />
2011-12 2012-13<br />
As per approved Mining Scheme As per approved Mining Scheme<br />
PROTECTION OF ENVIRONMENT<br />
2011-12 2012-13<br />
As per approved Mining Scheme As per approved Mining Scheme<br />
CONSERVATION OF MINERALS<br />
2011-12 2012-13<br />
As per approved Mining Scheme As per approved Mining Scheme<br />
Date: Signature <strong>of</strong> Mine Manager/ Mining Engineer<br />
Distribution <strong>of</strong> stationeries in<br />
schools, Coaching classes for<br />
8th to 10th std.<br />
Inter village Football<br />
Tounament