31.07.2013 Views

27.09.2012 - Indian Bureau of Mines

27.09.2012 - Indian Bureau of Mines

27.09.2012 - Indian Bureau of Mines

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MCDR INSPECTION REPORT<br />

INDIAN BUREAU OF MINES<br />

MINES CONTROL AND CONSERVATION OF MINERALS DIVISION<br />

BHUBANESWAR REGIONAL OFFICE<br />

Mine file no. ORI/MN/KJR/MCDR-39/BBS<br />

Mine code No. 30 ORI 08035<br />

1) Name <strong>of</strong> Inspecting <strong>of</strong>ficer : Mr. Prem Prakash<br />

2) Designation : Sr.Assistant Controller <strong>of</strong> <strong>Mines</strong><br />

3) Accompanying mine <strong>of</strong>ficial with designation: Mr. T K Jena ,Manager <strong>Mines</strong><br />

4) Date <strong>of</strong> Inspection : <strong>27.09.2012</strong><br />

5) Date <strong>of</strong> Previous Inspection : 15.06.2011<br />

PART –I GENERAL INFORMATION<br />

1. (a) Name <strong>of</strong> the Mine : Katamati Iron Mine<br />

(b) Name <strong>of</strong> Lessee :Tata Steel Ltd.<br />

(c ) Category <strong>of</strong> Mine : A-Fully Mechanized.<br />

(d) Mode <strong>of</strong> working : OC<br />

(e) Location <strong>of</strong> Mine<br />

State : Odisha<br />

District : Keonjhar<br />

Tehsil/Taluka : Barbil<br />

Police Station : Joda<br />

Village : Deojhar<br />

Post/Pin Code : Deojhar/758038<br />

(f) Date <strong>of</strong> first opening : May 1934<br />

(g) Weekly day <strong>of</strong> rest : Sunday<br />

(h) Status <strong>of</strong> Mine :Working<br />

(i) Mine Correspondence address:-<br />

Phone : 9234301340<br />

Fax : 06596-290737<br />

E-Mail : gm.<strong>of</strong>fice@tatasteel.com<br />

2. Lease No.<br />

a. Lease area in ha with forest area, if any:<br />

Lease area – 403.3238 ha<br />

Forest – 199.1720 ha<br />

Non Forest –204.1518 ha<br />

b. Period <strong>of</strong> lease : 20 years (17.01.83 to 16.01.03)<br />

c..In case <strong>of</strong> forest area if the permission has been taken,<br />

its details like area permitted to be worked and letter no. etc.: the forest clearance has not<br />

yet granted<br />

d If the area is worked on any interim<br />

Govt. order, or court order, its details. : N/A<br />

e. Date <strong>of</strong> Expiry : 16.1.2003 (Under Deemed Renewal)<br />

3. (a)Mineral(s) included in the lease deed: Iron Ore<br />

(b) Mineral worked :Iron Ore<br />

4. Name and address <strong>of</strong> (incl.FAX, E-Mail, if any)<br />

a) Lessee address 24,Homi Modi street, Fort<br />

Bombay house,Mumbai-400001<br />

b) i)Nominated owner with address Mr. H M Nerurkar<br />

M.D. Tata Steel, Jamshedpur<br />

ii)Date <strong>of</strong> appointment 09.04.2009


c) i)Name <strong>of</strong> Agent with address Mr. S.Kuchroo<br />

Tata Steel Ltd., Noamundi<br />

Singhbhum west, Jharkhand<br />

ii) Date <strong>of</strong> appointment 1.08.2010<br />

d) i)Mining engineer(whole/part time)<br />

Mr Tapan kumar Jena<br />

Phone/fax nos<br />

Mob.09234554362<br />

ii)Education Qualification B.E(Mining)<br />

iii)Date <strong>of</strong> appointment 6.6.2011<br />

e) i)Manager Mr Tapan kumar Jena<br />

ii)Education Qualification B.E(Mining)<br />

iii)Date <strong>of</strong> appointment 6.6.2011<br />

f ) i)Geologist Vijay A Verlekar<br />

ii)Education Qualification MSc geology<br />

iii)Date <strong>of</strong> appointment 15.6.2011<br />

5. Details about Mining plan/Mining Scheme<br />

a) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

plan<br />

b) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

scheme<br />

c) Condition while approving the MP/MS/<br />

Modification<br />

d) Period <strong>of</strong> mining plan/mining scheme in<br />

force:<br />

-- 314(3)/ 2000/MCCM(C)/MP-14<br />

DT: 06.07.2001<br />

-- 29.09.2009<br />

-- General<br />

-- From 2008-2009 to 2012-13<br />

(Financial Year)<br />

PART II-Technical details/ documen<br />

1. Details about employment.<br />

Maximum number <strong>of</strong> persons employed on any day during the year(i) below ground (ii) above ground<br />

and (iii) in all in the mines. 146 on 28.02.2012<br />

Classification Average daily employment Average No. <strong>of</strong><br />

Direct Contract Total days worked in<br />

a year<br />

OPENCAST<br />

a) Managerial person 7 - 7 312<br />

b) Supervisory persons 2 - 2<br />

c) Workers 44 - 44<br />

d) Ministerial persons 6 - 6<br />

c) Employment in plant - 35 35<br />

f) Others - 2 2<br />

UNDERGROUND<br />

- - -<br />

Remarks<br />

a) Managerial person* - - -<br />

b) Supervisory persons - - -<br />

c) Workers - - -<br />

d) Ministerial persons - - -<br />

c) Employment in plant - - -<br />

f) Others - - - * If common,<br />

please state


S.No<br />

.<br />

2. Community Development Plan (in and around the mines) :<br />

Proposed action<br />

towards<br />

Socioeconomic<br />

development<br />

during t the year<br />

General<br />

Development in<br />

area<br />

Expenditure<br />

proposed for<br />

the year<br />

2011-12<br />

Expenditure<br />

incurred in<br />

2011-12<br />

Expenditure<br />

proposed for<br />

the year<br />

2012-13<br />

Expenditure<br />

actually<br />

incurred upto<br />

Aug'12 for<br />

the year<br />

2012-13<br />

Remarks<br />

1 a) Housing<br />

b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />

c) Sanitaion 102 2.81 10.00 0.00<br />

d) Health 48.6 1.5 8.00 0.20<br />

2 Training 11.29 0.7 25.00<br />

3<br />

4<br />

Employment to<br />

local inhabitants<br />

inhabitants 7.036 1.26<br />

Infrastrucure<br />

(Civil jobs<br />

14.00 1.75<br />

including roads) 529 434.2 140.00 81.85<br />

a)Constructional<br />

work(School<br />

,Community<br />

Centre etc)<br />

Health camps,medicine<br />

distribution<br />

Mason,carpentary,winding,w<br />

elding<br />

Kharif seeds, grocery,<br />

fingerlings, Pady fan,<br />

Sprayer machine<br />

Construction community<br />

centre & Boundary wall<br />

0.90 School building<br />

b)Irrigation 2.9 Ponds<br />

5 Education 0.03 23.00 1.13<br />

6 Sports Activities<br />

Environment<br />

1.5 1.34 5.00 0.20<br />

7 Management 3.75 2.00<br />

Gross Total 928.176 573.31 292.00 94.73<br />

Distribution <strong>of</strong> stationeries in<br />

schools, Coaching classes for<br />

8th to 10th std.<br />

Inter village Football<br />

Tounament<br />

3. Status <strong>of</strong> compliance <strong>of</strong> MCDR.88 including therewith the rectification <strong>of</strong> outstanding violation <strong>of</strong> the<br />

rules.<br />

Date <strong>of</strong> last<br />

inspection<br />

Violation pointed out Compliance reported<br />

15.06.2011 Rule 13 (1), 16 (1) & 33(2) complied<br />

During current inspection, No serious/ major violation <strong>of</strong> MCDR’88 was observed.<br />

4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 13(2) or prohibition <strong>of</strong><br />

deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.:<br />

Not recommended


(b) If rule 13(2) or 56 has been imposed in the past, its details needs to be included specially giving reasons<br />

and letter number. : NA<br />

5.Scientific mining (As per latest approved mining plan/scheme)<br />

Item Proposal Actual work done Remarks<br />

i) Exploration (Rule 13)<br />

(2011-12) (2011-12)<br />

a) Type <strong>of</strong> prospecting and exploration i.e. drilling,<br />

NIL proposed bore<br />

pitting, drilling etc.<br />

15m,750m<br />

holes were in<br />

b) Total area covered<br />

ii) Workings (Rule 13)<br />

16 ha NIL forest area and the<br />

forest clearance has<br />

not yet granted/<br />

obtained<br />

a) Opencast/ underground Opencast Opencast<br />

b) Manual/ mechanized Mechanized Mechanized<br />

c) No. and size <strong>of</strong> each pit (L x W x H) one one<br />

d) Bench size (1 x w x h) length can be Width:25m Width:25m<br />

defined as regular or irregular<br />

Height:12m approx<br />

Regular<br />

Height:12m<br />

appreox<br />

Regular<br />

e) Ore to waste ratio pit wise if possible<br />

otherwise for mine.<br />

1:0.11 1:0.14<br />

f) Total area covered under excavation/pits Not specific for the<br />

year<br />

--g)<br />

Production<br />

iii) Waste disposal (Rule 13)<br />

7.02 mill. te 4.42 mill. te<br />

a) Location <strong>of</strong> dumps Dump no.3 Dump no.3 .<br />

b) Method <strong>of</strong> dumping whether advancing/<br />

retreat<br />

Retreating Retreating<br />

c) Total area covered under waste dump Not specific for the<br />

year<br />

--d)<br />

No. & size <strong>of</strong> each waste dump with<br />

number <strong>of</strong> steps lift/ bench.<br />

02 nos. 02 nos.<br />

e) Yearly generation <strong>of</strong> waste quantity. 630000 348000<br />

f) Year-wise quantity <strong>of</strong> top soil removed,<br />

utilized & stacked.<br />

NIL NIL<br />

6.Conservation <strong>of</strong> mineral-both quantitative and qualitative.<br />

i) Mineral (Rule 15)<br />

A1 No benches in ore and waste waste-2, Ore-5<br />

A2 Percentage <strong>of</strong> recovery <strong>of</strong> ore pit –wise w.r.t. ROM Total About 95 %<br />

materials<br />

ii) Sub grade mineral / fines ( Rule 16 )<br />

B1 Separate stacking from waste Separate Subgrade Dump is<br />

maintained<br />

B2 Location <strong>of</strong> stacking 11900E to 12250E and 9850N<br />

to 10250N<br />

B3 Total area covered for stacking 8.02 ha<br />

B4 No. & size <strong>of</strong> each stack 1, 360x400, 3 steps<br />

B5 Quantity <strong>of</strong> Yearly generation utilisation & total quantity<br />

Available during inspection with grade<br />

252887 tonnes(FY’2011-12),


iii)Beneficiation ( Rule 20 )<br />

C1 Efforts for improving<br />

low grade & sub grade<br />

mineral<br />

C2 Efforts for improving<br />

percentage <strong>of</strong> recovery<br />

<strong>of</strong> ore<br />

7. Environment Management both quantitative & qualitative:<br />

A Land Environment<br />

A1) Landscape : Hilly<br />

A2) Aesthetic Environment: Satisfactory<br />

ROM is despatched to Noamundi wet Processing plant for<br />

beneficiation <strong>of</strong> low grade & subgrade ore .<br />

Hydrocyclone & jigging plant is introduced at Noamundi Processing<br />

plant to improve recovery <strong>of</strong> iron values from fines.<br />

A3) Soil & land use pattern: Top soil is stored separately & subsequently used for plantation.<br />

A4) Agriculture: No Agriculture land was there within the lease<br />

A5) Forest (Flora & fauna) :Diversified flora species & fauna exist inside the lease.<br />

A6) Vegetation: vegetation disturbed only in broken area.<br />

A7) Public building, places & monuments (protected monument & historical monument),<br />

Places <strong>of</strong> worship & places <strong>of</strong> tourist interest. : No monuments within the lease.<br />

B Water Environment:<br />

B1) Surface water: Toewall,garland drain etc. are provided around the<br />

dump to prevent the contamination <strong>of</strong> surface water.<br />

B2 ) Ground water : Ground Water table not intercepted yet due to opencast working.<br />

B3) Quality <strong>of</strong> water: The water quality is monitored regularly and all the parameters are<br />

within the permissible limit.<br />

C) Air Environment :<br />

C1) Noise : Monitoring is done regularly & noise levels are within the permissible limit.<br />

C2) Air : Monitoring is done regularly & parameters are within the permissible limit.<br />

C3) Climatic condition : Sub-tropical<br />

D) Socio economic environment:<br />

D1) Social & demographic pr<strong>of</strong>ile : Within the colony there is presence <strong>of</strong> people <strong>of</strong> different<br />

region and religion and <strong>of</strong> varied demographic.<br />

D2) Recommending health & safety : OHSAS-18001 system is in place and hence OHS aspect<br />

is taken care.<br />

D3) Human settlement :Within the ML area there is a colony for employees.<br />

D4)Recreational facility : recreational facilities being provided for the<br />

employee like parks ,garden,club,fountain park etc<br />

8. Sensitive technical items on conservation <strong>of</strong> mineral, scientific mining and protection <strong>of</strong> Environment: Is<br />

being taken care as per mining plan (Specific issues that are required to be kept in focus for examination &<br />

monitoring should be stated here) : There is no specific issues.


9. Scrutiny <strong>of</strong> annual return on cost <strong>of</strong> operation. Reserves, production, pit mouth value, stock, land use<br />

pattern and fixe assets for the year 2011-12.:<br />

(revised annual return for the year 2011-12 submitted to this <strong>of</strong>fice and available in the file is referred)<br />

a) Production:2011-12 -- 4419000 Tons (ROM)<br />

b) Cost <strong>of</strong> operation Rs 571.76 per ton<br />

c) Pit’s Mouth Value Rs 571.76 per ton (captive Mine)<br />

d) Reserves 50.50 million tonnes (cat.111)<br />

e) Stock at <strong>Mines</strong> head 337874.485 tonnes (ROM)<br />

f) Land Use Mining & allied activities.<br />

PART - III – PERFORMANCE OF MINES – NA<br />

PART - IV – PROPOSAL FOR FURTHER ACTION FOR<br />

a) <strong>Indian</strong> <strong>Bureau</strong>e <strong>of</strong> <strong>Mines</strong> (Any issue related to CGPB,SGPB, assistance,consultancy, annual<br />

programme and studies etc.) :Nil<br />

b) The state government(Illegal mining, mining dispute, infrastructure, mineral based industry,<br />

mineral policy etc) : nil<br />

c) The central govt. (infrastructure development, mineral policy and legislation, mineral based<br />

industry etc.) : Nil<br />

MCDR DATABASE<br />

Prem Prakash<br />

Senior Assistant Controller <strong>of</strong> <strong>Mines</strong><br />

INDIAN BUREAUE OF MINES.


1. Mine Details 2. Inspection details<br />

Name <strong>of</strong> Mine Katamati Iron Mine Mine file No.<br />

Name <strong>of</strong> the lessee M/S-TATA STEEL Mine Code No 301807035<br />

Lease Area 403.3238 Ha Date <strong>of</strong> first opening May 1934<br />

Date <strong>of</strong> execution 27.10.84 Date <strong>of</strong> inspection 15.6.11<br />

Expiry Date 16.1.2003(Under Deemed Earlier two dates <strong>of</strong> inspection 3.8.2010 &<br />

Renewal)<br />

15.06.2011<br />

State Odisha Name & Designation <strong>of</strong> the Mr. Prem Prakash<br />

inspecting <strong>of</strong>ficer<br />

Sr. ACOM<br />

District<br />

Keonjhar<br />

ID <strong>of</strong> inspecting <strong>of</strong>ficer<br />

MCDR Inspection<br />

Police Station<br />

Joda<br />

Type <strong>of</strong> inspection<br />

Post Deojhar Name & designation <strong>of</strong> mine<br />

Official accompanying)<br />

Village Deojhar Weekly day <strong>of</strong> rest Sunday<br />

Pin Code 758038 Type <strong>of</strong> Mine(OC,UG, BOTH) OC<br />

Phone Category <strong>of</strong> mines (A-Mech, A1-<br />

Manual, B-Manual, B1-Very<br />

small)<br />

A-Mech<br />

3. LAND DETAILS ( WITHIN LEASE AREA )<br />

Mr. T K Jena<br />

Mgr.(<strong>Mines</strong>),<br />

Mr. Indranil<br />

Saha,(geologist)<br />

Mr.Rajesh Kumar<br />

(Sr.Mgr.Operations)


Code Type <strong>of</strong> land Area ha Code Type <strong>of</strong> land Area ha<br />

1 Reserve forest 57.5520 18 Degraded by dump 8.0169<br />

2 Protected forest 141.6200 19 Degraded land by pit in forest 17.6022<br />

3 Forest unclassified 0 20 Degtraded land by dump in forest 0<br />

4 Forest sanctuary 0 21 Degraded land by pit in non forest 33.7716<br />

5 Forest National Park 0 22 Degraded land by dump in non forest 8.0169<br />

6 Forest Mineralized 23 Degraded land by road in forest 4.9535<br />

7 Forest Non Mineralized 24 Degraded land by road in non forest 0<br />

8 Non-Forest Pvt. Land 0.077 25 Degraded land by plant, building, town<br />

in forest<br />

0<br />

9 Non-Forest Agricultural 0 26 Degraded land by plant, building, town 7.3299<br />

Irrigated land<br />

in non forest<br />

10 Non-Forest agricultural non<br />

irrigated land<br />

70.9212 27 Degraded by tailing pond in Forest 5.1434<br />

11 Non-Forest private , other land 0 28 Degraded by tailing pond in non Forest 21.8141<br />

12 Non-Forest Govt. grazing land. 0 29 Degraded land others in forest(railway<br />

abandoned)<br />

3.48<br />

13 Non- Forest Govt. waste land 129.119 30 Degraded land others in non<br />

forest(railway abandoned)<br />

3.00<br />

14 Non-forest Govt. other land 4.0347 31 Forest land acquired 199.1720<br />

15 Non Forest Mineralised. 32 Non forest land acquired 193.77<br />

16 Non Forest non mineralized land 33 Area in forest 199.1720<br />

17 Degraded land by pit 51.3738 34 Area in Non forest 204.1518<br />

4. Mineral:<br />

Main<br />

Mineral(s)<br />

Associated<br />

Mineral(s)<br />

Captive<br />

use<br />

End<br />

Product<br />

Non-captive use<br />

Domestic Export<br />

Yes No Yes No<br />

Iron Ore Yes Steel Yes<br />

5. MINING PLAN/MINING SCHEME<br />

Date <strong>of</strong> approval <strong>of</strong> mining plan with<br />

no<br />

No. 314(3)/2000-MCCM(C)/MP14.<br />

Dated 6.7.2001 valid from 2001-02 to<br />

2007-08<br />

Mining plan modified vide letter<br />

No.314(3)/ 2007- MCCM(C)/MP-2<br />

Dated: 19.7.07 valid from<br />

2006-07 to 2007-08<br />

6. NOMINATED OWNER /AGENT DATA<br />

Additional<br />

conditions<br />

Approval<br />

letter<br />

attached<br />

Approval<br />

letter<br />

attached<br />

Date <strong>of</strong> approval<br />

<strong>of</strong> mining scheme<br />

Ist Scheme <strong>of</strong> Mining<br />

314(3)/2009/MCCM(C)/MS/19<br />

dated 29.09.2009 valid from 2008-<br />

09 to 2012-13<br />

A. Lessee B. Owner C. Agent<br />

Name <strong>of</strong> TATA STEEL H. M. Nerurkar S . Kuchroo<br />

Date <strong>of</strong> nomination 09.04.2009 1.8.2010<br />

Postal address,State Jharkhand Jharkhand<br />

District E.Singhbhum W.Singhbhum<br />

Village & Post Jamshedpur Noamundi<br />

Pin Code 831001 833217<br />

Remarks<br />

Remarks


Fax<br />

E-mail<br />

Phone<br />

7. MINING ENGINER /GEOLOGIST DATA (APPOINTED UNDER RULE 42 OF MCDR,1988)<br />

AND MINES MANAGER ( APPOINTED UNDER MMR ,1961 )<br />

Status Name Designation Educational Date <strong>of</strong><br />

Qualification appointment<br />

Mining Tapan Kumar Head, B. E (Mining) 6/6/2011<br />

Engineer/ Jena Katamati<br />

Geologist Viraj A<br />

Verlekar<br />

Geologist M.Sc.(Geology) 15/6/2011<br />

Manager Tapan Kumar Head, B. E (Mining) 6/6/2011<br />

Jena Katamati<br />

8.EXPLORATION:<br />

a)Cumulative exlploration as on 1.4.2011<br />

No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m) 100x100,<br />

200x200<br />

Max Depth(m) 166m Max Depth(m) Max length(m)<br />

Min depth(m) 2.3m In-depth(m) Min.length(m)<br />

Total meterage 6000.43 Total meterage Total length<br />

b) Exploration carried out during the year 2011-12<br />

No <strong>of</strong> boreholes NIL* Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m)<br />

Max Depth(m)<br />

NA Max Length(m)<br />

Max Depth(m) NIL<br />

Min depth(m) NIL In-depth(m) Min.length(m)<br />

Total meterage NIL Total meterage Total length(m)<br />

Remarks<br />

*- all the proposed holes were planned in forest area withnan anticipation to get forest clearance but no<br />

exploration could be carried out due to forest clearance not accorded<br />

c) Cumulative Exploration carried out as on date <strong>of</strong> inspection<br />

No <strong>of</strong> boreholes 139 Nos <strong>of</strong> pits Nos <strong>of</strong> trenches<br />

Grid Interval (m) 100x100,<br />

200x200<br />

Max Depth(m) 166m In-depth(m) Max Length(m)<br />

Min. depth(m) 2.3m Min depth(m) Min length(m)<br />

Total meterage 6000.43 Total meterage Total length(m)


9. EXPLORATORY MINING YEAR: No proposal made.<br />

10. EXTENT OF OPEN – PIT DEVELOPMENT<br />

Pit size No. <strong>of</strong><br />

OB<br />

benches<br />

600m x<br />

800m<br />

Ht<br />

bench(m)<br />

Width<br />

(m)<br />

No. <strong>of</strong><br />

benches’<br />

in ore<br />

Ht.(m) Width(m) Pit<br />

depth<br />

(m)<br />

Top<br />

RL<br />

(m)<br />

Bottom<br />

RL (m)<br />

Overall<br />

pit<br />

slope<br />

2 6-12 20-50 5 6-12 20-50 70 712 642


A Mineral Reserve<br />

(1) Proved Mineral Reserve(111)<br />

(2) Probable Mineral Reserve(121 and 122)<br />

B Remaining Resources<br />

(1) Feasibility Mineral Resource(211)<br />

(2) Pre-feasibility Mineral Resource(221 and 222)<br />

(3) Measured Mineral Resource(331)<br />

(4) Indicated Mineral Resource(332)<br />

(5) Inferred Mineral Resource(333)<br />

(6) Reconnaissance Mineral Resource(334)<br />

ii) Annual Production<br />

50.50<br />

-<br />

58.18<br />

-<br />

-<br />

-<br />

-<br />

4.71<br />

Fe > 58%<br />

Fe > 58%<br />

Year Mineral Production (t) Closing stock (t)<br />

2011-12 Iron Ore (ROM) 4419000 327874.485<br />

17. SALE OF MINERAL PRODUCT (MINERAL –WISE )<br />

Sale <strong>of</strong> mineral in the year 2011-12: NIL<br />

Whole ROM is dispatched to Noamundi plant for processing. No sale <strong>of</strong> mineral product is there.<br />

18. SUBGRADE MINERAL AND MINERAL REJECT<br />

a) Sub –grade mineral<br />

Name <strong>of</strong><br />

Mineral<br />

Hematite Cumulative<br />

as on<br />

01.04.2012<br />

During the<br />

year 2011-<br />

12<br />

During the<br />

year 2012-<br />

13<br />

Comm as on<br />

date <strong>of</strong><br />

insecption<br />

b) Mineral reject: NIL<br />

Quantity Quantity % Quantity Nature <strong>of</strong> Grade <strong>of</strong><br />

generated Consumed utilisation Stacked utilisation subgrade<br />

4130077 NIL 0 4130077 NA >45% Fe,<br />


Name <strong>of</strong><br />

Mineral<br />

Cumulative<br />

as on<br />

01.04.<br />

2012<br />

During<br />

previous<br />

year 2011-<br />

12<br />

During the<br />

year 2012-<br />

13<br />

Cumm as<br />

on date <strong>of</strong><br />

inspection<br />

Quantity<br />

generated<br />

Quantity<br />

consumed<br />

Quantity<br />

stacked<br />

19. RECLAMATION / REHABILITATION OF WASTE DUMP:<br />

Nature <strong>of</strong><br />

utilisation<br />

Remarks<br />

No waste dump is existing in the mines. However the details <strong>of</strong> subgrade dump is mentioned below.<br />

Year Qty. <strong>of</strong> S.G.<br />

(tonnes)<br />

Cumula<br />

tive as<br />

on<br />

01.04.<br />

2012<br />

During<br />

previou<br />

s year<br />

2011-12<br />

During<br />

the year<br />

2012-13<br />

Cumm<br />

as on<br />

date <strong>of</strong><br />

Excavate Dump<br />

d ed<br />

4130077 41300<br />

77<br />

252887 25288<br />

7<br />

296042 29604<br />

2<br />

4426119 44261<br />

19<br />

Total area<br />

occupied by<br />

dumps (ha)<br />

Area<br />

stabilized<br />

(ha)<br />

Dead Aliv De Alive Ht An<br />

e ad<br />

gle<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

5.04 42 37.<br />

5<br />

Dump design (Max-ht,<br />

angle)<br />

Method<br />

<strong>of</strong><br />

stabilisati<br />

on<br />

No. <strong>of</strong><br />

terrace<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

3 Plantatio<br />

n<br />

No. <strong>of</strong><br />

dump<br />

stabilised<br />

The dump<br />

is active<br />

The dump<br />

is active<br />

The dump<br />

is active<br />

The dump<br />

is active


inspecti<br />

on<br />

20. RECLAMATION /REHABILITATION OF TAILING PONDS<br />

No proposal for reclamation <strong>of</strong> tailing pond was made.<br />

Year Area occupied<br />

Area stabilised/<br />

Means <strong>of</strong> rehabilitation<br />

(ha)<br />

rehabilitated<br />

Cumulative as on 01.04. 34.9744 0 No proposal for<br />

2012<br />

stabilization. The<br />

During previous year<br />

2011-12<br />

34.9744 0<br />

tailing pond is still active.<br />

During the year 2012-13 34.9744 0<br />

Cumm as on date <strong>of</strong><br />

inspection<br />

34.9744 0<br />

Name<br />

<strong>of</strong> the<br />

new<br />

macine<br />

Name<br />

<strong>of</strong> the<br />

new<br />

macine<br />

21. INPUT /OUTPUT OF MACHINERY PERFORMANCE<br />

A. New Machinery<br />

Sector<br />

Private<br />

/Public<br />

Sub<br />

type<br />

Electric<br />

/diesel<br />

B. Write <strong>of</strong>f machinery<br />

Sector<br />

Private<br />

/Public<br />

Sub<br />

type<br />

Electric<br />

/diesel<br />

Specification<br />

capacity<br />

Specification<br />

capacity<br />

Capacity<br />

unit<br />

Capacity<br />

unit<br />

No.<strong>of</strong><br />

new<br />

items<br />

No.<strong>of</strong><br />

new<br />

items<br />

removed<br />

Origin<br />

Indigenous<br />

/ imported<br />

Origin<br />

Indigenous<br />

/ imported<br />

Purchace<br />

date<br />

Write<br />

<strong>of</strong>f<br />

date<br />

C. Machinery on site<br />

Name <strong>of</strong><br />

machine<br />

Specification Capacity unit No. <strong>of</strong><br />

machine<br />

% <strong>of</strong> availability % <strong>of</strong><br />

utilization<br />

Shovel EX-1100 5.7 cum 2 86% 49%<br />

Shovel EX-1200 5.9 cum 1 86% 47%<br />

Dumper KOMATSU 100 T 7 90% 59%<br />

Drill IDM-30,45 ;ROC<br />

L8<br />

150mm 3 77% 47%<br />

Dozer Komatsu 410hp 1 72% 36%<br />

Grader CAT 280 hp 1 96% 12%<br />

Water<br />

Sprinkler<br />

28KL 1 51% 22%<br />

Cost Commisioning<br />

date<br />

Write<br />

<strong>of</strong>f<br />

Values<br />

22. PLANTATION<br />

Plantation Inside mining lease Outside mining lease<br />

No. <strong>of</strong> trees Area in Rate <strong>of</strong> No. <strong>of</strong> trees Area in<br />

hect survival<br />

hect<br />

Remark<br />

s<br />

Rate <strong>of</strong><br />

survival


Cumulative as on 01.04.<br />

2012<br />

1500 0.5 71.5%<br />

During previous year 2011-<br />

12<br />

1500 0.5 75%<br />

During the year 2012-13 5000 1.5 -<br />

Cumm as on date <strong>of</strong><br />

inspection<br />

6500 2.0 73%<br />

In addition,about 15000 grass plantation is done in 0.07ha area in Fy’12.<br />

23. EMP DATA:Last Month Monitoring Data Enclosed<br />

a) Soil data<br />

(Attached as Annexure-I)<br />

Station no. Type <strong>of</strong> area<br />

Agriculture<br />

Season Physical Chemical Remarks<br />

Station<br />

no.<br />

b) Air Data<br />

(Attached as Annexure-II)<br />

Season<br />

Summer<br />

/Winter<br />

Monsoon<br />

/Post<br />

Monsoon<br />

c) Noise Data<br />

(Attached as Annexure-III)<br />

Station no. Station<br />

Name<br />

d) Water Data<br />

(Attached as Annexure-IV)<br />

i) Discharge place ( Agriculture<br />

land/Forest<br />

land/Wasteland/Nallah/River<br />

SPM Pb So2 NOX CO Free<br />

silica<br />

Season Type <strong>of</strong> area ( Industrial<br />

commercial/residential<br />

/Silence zone<br />

Rpm Rate <strong>of</strong><br />

dust<br />

fall<br />

Rem<br />

arks<br />

Day time Night time Remarks<br />

ii) Water management in ababdoned quarries<br />

Year Quarry Reservace Quarry Capacity Capacity Period Period Water Remarks


S.No<br />

.<br />

1<br />

pit ID Yes/No size min. max. capacity<br />

min.<br />

iii) Water data details<br />

Year Station<br />

no.<br />

Station<br />

name<br />

Station<br />

type(coloney<br />

,pit,river,dow<br />

n stream)<br />

Seas<br />

on<br />

iv) Vibration Data<br />

(Attached as Annexure-V)<br />

Station no. Station Season<br />

name (Summer/Winter/Monso<br />

on/Post Monsoon)<br />

Elements(<br />

drinking/E<br />

ffluent)<br />

Par<br />

am<br />

eter<br />

na<br />

me<br />

Peak particle<br />

velocity<br />

Paramete<br />

r value<br />

capacity<br />

max.<br />

Air over<br />

pressure<br />

Excess<br />

value<br />

utilization<br />

Re<br />

ma<br />

rks<br />

Freque<br />

ncy<br />

Exce<br />

ss<br />

value<br />

Rermarks<br />

24. COMMUNITY DEVELOPMENT:<br />

(a) FACILITIES MADE AVAILABLE TO THE COMMUNITY INSIDE & OUTSIDE CORE ZONE<br />

(LEASE AREA)<br />

Proposed action<br />

towards<br />

Socioeconomic<br />

development<br />

during the<br />

month<br />

General<br />

Development in<br />

area<br />

Expenditure<br />

proposed for<br />

the year<br />

2011-12<br />

Expenditure<br />

incurred in<br />

2011-12<br />

Expenditure<br />

proposed for<br />

the year<br />

2012-13<br />

Expenditure<br />

actually<br />

incurred upto<br />

Aug'12 for<br />

the year<br />

2012-13<br />

Remarks<br />

a) Housing<br />

b) Water Supply 225 131.47 65.00 5.80 Tube well,Open well,<br />

c) Sanitaion 102 2.81 10.00 0.00<br />

d) Health 48.6 1.5 8.00 0.20<br />

2 Training 11.29 0.7 25.00<br />

3<br />

4<br />

Employment to<br />

local inhabitants<br />

inhabitants 7.036 1.26<br />

Infrastrucure<br />

(Civil jobs<br />

14.00 1.75<br />

including roads) 529 434.2 140.00 81.85<br />

a)Constructional<br />

work(School<br />

,Community<br />

Centre etc)<br />

Health camps,medicine<br />

distribution<br />

Mason,carpentary,winding,w<br />

elding<br />

Kharif seeds, grocery,<br />

fingerlings, Pady fan,<br />

Sprayer machine<br />

Construction community<br />

centre & Boundary wall<br />

0.90 School building<br />

b)Irrigation 2.9 Ponds


5 Education 0.03 23.00 1.13<br />

6 Sports Activities<br />

Environment<br />

1.5 1.34 5.00 0.20<br />

7 Management 3.75 2.00<br />

Gross Total 928.176 573.31 292.00 94.73<br />

25. PROPOSAL FOR FURTHER ACTION<br />

a) <strong>Indian</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Mines</strong> (any issue related to CGPB, SGPB, assistance, consultancy,<br />

annual programme and studies etc.<br />

b) The State Government (illegal mining, mining dispute, infrastructure, mineral based<br />

industry, mineral policy & etc.)<br />

c) The Central Government (infrastructure development, mineral policy and legislation,<br />

mineral based industry & etc.)<br />

SALIENT ACHIEVEMENTS<br />

SYSTEMATIC DEVELOPMENT OF MINERAL<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

PROTECTION OF ENVIRONMENT<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

CONSERVATION OF MINERALS<br />

2011-12 2012-13<br />

As per approved Mining Scheme As per approved Mining Scheme<br />

Date: Signature <strong>of</strong> Mine Manager/ Mining Engineer<br />

Distribution <strong>of</strong> stationeries in<br />

schools, Coaching classes for<br />

8th to 10th std.<br />

Inter village Football<br />

Tounament

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!