30.07.2013 Views

SERVICE BULLETIN REFRIGERATION

SERVICE BULLETIN REFRIGERATION

SERVICE BULLETIN REFRIGERATION

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

f) Solder the two cables.<br />

h) Insert the cables of the new temperature<br />

sensor into the two 15 mm heat shrink<br />

tubings.<br />

g) Insert the cable into the 50 mm heat shrink<br />

tubing.<br />

i) Solder the cables of the new temperature<br />

sensor with the cables of the cable pulled out<br />

before.<br />

j) Warm up the two heat shrink tubings to<br />

k) Warm up the 50 mm heat shrink tubing to<br />

insulate the 2 soldered junctions.<br />

insulate the cables with the junctions.<br />

FAULTY TEMPERATURE SENSOR 38/39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!