SERVICE BULLETIN REFRIGERATION
SERVICE BULLETIN REFRIGERATION
SERVICE BULLETIN REFRIGERATION
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
j) Connect the cables of the new connector of<br />
the sensor to the soldered cables.<br />
Note: before soldering, fit the two 15 mm<br />
heat shrink tubings to the cables of the new<br />
connector.<br />
l) Connect the connectors to the new power board.<br />
View of the power board (from the component side)<br />
J1 wiring connector (5 pin)<br />
J3 temperature sensor connector (6 pin)<br />
k) Warm up the two heat shrink tubings to insulate<br />
the 2 soldered junctions.<br />
FAULTY TEMPERATURE SENSOR 28/39