DP MJCCSW 4.10_EN - copie - Maison de la France
DP MJCCSW 4.10_EN - copie - Maison de la France
DP MJCCSW 4.10_EN - copie - Maison de la France
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
October 2009<br />
Construction work begins<br />
15 January 2011<br />
Completion of earthworks and structural work<br />
February 2011<br />
Second expert analysis of Severin Wun<strong>de</strong>rman’s collection<br />
October 2011<br />
Final inspection of the building and the museographic <strong>de</strong>sign<br />
6 November 2011<br />
The museum opens to the public<br />
Finance<br />
Total project cost €11,780,000<br />
Contribution from the town of Menton of €5,380,000, 46% of the total<br />
Contribution from the Conseil Général <strong>de</strong>s Alpes-‐Maritimes of €4,000,000, 34% of the total<br />
Contribution from the Provence-‐Alpes Côte d’Azur Region of €1,200,000, 10% of the total<br />
Contribution from the State via the DRAC, of €1,200,000, 10% of the total<br />
7