Double-hinged door for reduced plantroom space and easy maintenance<br />

Instead of a normally hinged door, the <strong>Mini</strong>-3 has a proven double hinged door allowing<br />

problem-free extraction and swivelling out of long burner heads, typically associated<br />

with low NOx burners.<br />

Opening and swivelling out is also no longer hindered by adjacent walls or other burners<br />

in a multi-boiler system. (See space requirments below).<br />

The opening direction of the double hinged door can be easily reversed on the boilers.<br />

Regular boiler cleaning will contribute <strong>to</strong>wards the lowest possible energy consumption.<br />

The <strong>Mini</strong>-3 double-hinged door enables the boiler <strong>to</strong> be opened for cleaning without the<br />

need for the burner <strong>to</strong> be dismantled.<br />

A further advantage of the double-hinged door is that, in contrast <strong>to</strong> traditionally hinged<br />

doors, it makes uniformly even contact on all sides, thereby achieving absolute gas<br />

tightness. It is therefore not necessary <strong>to</strong> adjust the hinges <strong>to</strong> give a gas tight seal.<br />

Space requirements<br />

The boiler should be sited on a flat, level and fireproof floor / base. A plinth is not<br />

necessary as the boiler sits on a channel base.<br />

Wherever possible space should be left around the boiler <strong>to</strong> enable all parts <strong>to</strong> be examined<br />

and the cubicle casings <strong>to</strong> be fitted or removed easily.<br />

Back clearance is required for the system connections, flue connections and access <strong>to</strong><br />

the cleaning door.<br />

Front clearance is required <strong>to</strong> swivel the boiler door, including burner, by 90 o , (standard <strong>to</strong><br />

the right, optional <strong>to</strong> left).<br />

Space requirements <strong>to</strong> right when right hinged 80mm (plus burner length).<br />

Space requirement at front where possible should allow for extraction of retarders etc.<br />

(nominally 500mm from boiler door).<br />

Controls<br />

The standard control panel incorporates:<br />

n flow thermometer<br />

n temperature control thermostat<br />

n on/off switch<br />

n high temperature limit thermostat<br />

with manual reset<br />

n excess temperature indica<strong>to</strong>r<br />

(The panel can be <strong>to</strong>p or side mounted depending on the boiler model selected) For<br />

combination boilers additional temperature control and temperature indication is included.<br />

Each control panel is equipped for two stage burner operation for matching<br />

seasonal load requirements on low fire rating option. TopTronic controller(s), volt free<br />

contacts and an hours run meter can be supplied as optional items. If TopTronic controller(s)<br />

are required the control panel, as shown, is utilised.<br />

TopTronic control<br />

The TopTronic control system brings<br />

<strong>to</strong>gether Hoval’s considerable experience in the field of heating & hot water control,<br />

<strong>to</strong>gether with a high performance micro-processor controls package. The result is a<br />

simple user-friendly operating platform that controls individual heating and hot water<br />

systems and optimises energy conservation.<br />

Databus connections<br />

Optional TopTronic controllers can be fitted directly in<strong>to</strong> the boiler control panel (as shown)<br />

enabling control of up <strong>to</strong> two variable temperature, one constant temperature and one<br />

calorifier primary circuits. These are linked <strong>to</strong>gether by databus connections. Please<br />

refer <strong>to</strong> our separate TopTronic leaflet for further information.<br />

Electrical supply<br />

230V 50 Hz single phase mains supply should be connected <strong>to</strong> the boiler control panel via<br />

a fused isola<strong>to</strong>r.<br />

Delivery and assembly<br />

The <strong>Mini</strong>-3 & <strong>Mini</strong>-3H heating only boilers are supplied fully assembled and cased. Delivered<br />

shrink wrapped on a pallet for ease of handling on site. Control panels & burners are<br />

supplied separate for fitting by the installer.<br />

The <strong>Mini</strong>-3H combination units are supplied with boiler, burner, calorifier, pump & pipework<br />

and control panel separate for site assembly.