Download PDF - ChartNexus
Download PDF - ChartNexus
Download PDF - ChartNexus
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
annual report | 2012 Gunung Capital Berhad (330171-P)<br />
66<br />
NOTES TO THE FINANCIAL STATEMENTS (cont’d)<br />
31 DECEMBER 2012<br />
4 PROPERTY PLANT AND EQUIPMENT (cont’d)<br />
Carrying Amount<br />
At valuation:<br />
Buildings 2,441,469 2,504,591<br />
Long leasehold land 1,250,926 1,279,267<br />
3,692,395 3,783,858<br />
At cost:<br />
Buildings 2,301,241 2,368,778<br />
Long leasehold land 2,771,429 2,790,734<br />
Plant and machinery 146,581 160,203<br />
Motor vehicles 71,169,882 83,812,541<br />
Furniture, fittings and equipment 539,770 669,903<br />
2012<br />
RM<br />
2011<br />
RM<br />
76,928,903 89,802,159<br />
Total 80,621,298 93,586,017<br />
Company<br />
As at<br />
01.01.2012<br />
RM<br />
Additions<br />
RM<br />
Disposals<br />
RM<br />
As at<br />
01.01.2012<br />
RM<br />
Cost<br />
Furniture, fittings and equipment 26,129 - - 26,129<br />
As at<br />
01.01.2012<br />
RM<br />
Charge<br />
for the year<br />
RM<br />
Disposals<br />
RM<br />
As at<br />
01.01.2012<br />
RM<br />
Accumulated Depreciation<br />
Furniture, fittings and equipment 24,702 1,427 - 26,129<br />
Carrying Amount<br />
Furniture, fittings and equipment - 1,427<br />
The revalued long leasehold land and buildings of the Group are stated at valuation based on their existing use basis<br />
valued by independent professional valuers on fair market value basis.<br />
Had the Group’s long leasehold land and buildings which are carried at valuation been stated at cost, their carrying<br />
amounts as at the end of the reporting period would have been RM3,023,500 (2011: RM3,100,563)<br />
Included in property, plant and equipment are motor vehicles with carrying amount of RM62,497,791 (2011: RM72,352,851)<br />
held under finance lease and hire purchase arrangements.<br />
2012<br />
RM<br />
2011<br />
RM