23.07.2013 Views

Facilities Development Plan - The University of Nebraska Kearney

Facilities Development Plan - The University of Nebraska Kearney

Facilities Development Plan - The University of Nebraska Kearney

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Facilities</strong> <strong>Development</strong> <strong>Plan</strong><br />

INSTITUTIONAL SUPPORT<br />

Most nonacademic student services are<br />

located on the eastern part <strong>of</strong> main campus,<br />

in our residential core. Founders Hall, the<br />

Memorial Student Affairs Building, and the<br />

<strong>Nebraska</strong>n Student Union house the bulk<br />

<strong>of</strong> these services, although the Intramural<br />

Sports <strong>of</strong>fi ce is located in Cushing Coliseum<br />

and the Offi ce <strong>of</strong> Residential and Greek life is<br />

located in the basement <strong>of</strong> Conrad Hall. While<br />

it would be possible to improve operations in<br />

some cases by reconfi guring these buildings<br />

or altering space assignments internally,<br />

with two exceptions we would not anticipate<br />

relocating these services. <strong>The</strong> fi rst exception is<br />

the Offi ce <strong>of</strong> Undergraduate Recruitment and<br />

Admissions, which is housed in the Memorial<br />

Student Affairs Building. This <strong>of</strong>fi ce would be<br />

better located on the eastern edge <strong>of</strong> campus,<br />

near a prominent campus entrance and more<br />

50<br />

2006 - 2015<br />

parking capacity. <strong>The</strong> second exception is<br />

the Offi ce <strong>of</strong> Residential and Greek Life,<br />

whose quarters in Conrad Hall are not easily<br />

accessible to some physically handicapped<br />

students.<br />

<strong>The</strong> Campus Utilities Master <strong>Plan</strong> provides<br />

the planning for the extension <strong>of</strong> the chilled<br />

water and steam infrastructure to the entire<br />

campus, and is included as Appendix I-6. <strong>The</strong><br />

main boiler and chiller plant will be relocated<br />

to the site east <strong>of</strong> the Tail Race. <strong>The</strong> existing<br />

campus storage buildings north <strong>of</strong> the Frank<br />

House and the <strong>Facilities</strong> Building/ Motor<br />

Pool building north <strong>of</strong> the campus main<br />

street will be relocated to the existing West<br />

Boiler plant site. <strong>The</strong> relocations will remove<br />

these industrial support uses from key future<br />

building sites within west campus.<br />

CHAPTER 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!