Figure 1.5-2: Preliminary Control System Architecture<br />

1.5.3 Compressed Air/Gas Supply<br />

Compressed Air<br />

Compressed air will be supplied by a rotary screw air compressor in the Utility Building separate<br />

from the proposed TSF Building. Piping will be run using a rack between the Utility Building<br />

and the proposed TSF Building.<br />

Air will be dried, oil-free, filtered for particulates, and delivered at approximately 130 psig at the<br />

compressor discharge (see Appendix 1-B Piping and Instrumentation Diagrams). The air receiver<br />

PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page 42<br />