Level 2 Level 2 will include the operator interaction to process plant (its control) through dedicated Human Machine Interfaces (HMI) located in the control room. The control Network will be based on Ethernet/IP. Level 0 through 2 will be what is commonly referred to as the Process Control System (PCS). Level 2 will also provide means of data acquisition and archiving. Level 3 Level 3 refers to the operational systems that will be used throughout the facility. Due to the nature of the proposed TSF, these systems will not be limited to those required only for process operations, but will also include all operational systems used across the entire facility. The data historian will be used to collect data throughout the facility, which will be provided in the Level 3 systems. The following provides a summary list of the Level 3 operational systems for the proposed TSF: Level 4 Data Historian. Environmental Monitoring and Reporting. Production Management and Reporting. Water, Wastewater Monitoring and Reporting. Fuel and Consumables Management and Reporting. Laboratory Information Management. Alarm and Event Management and Reporting. Level 4 refers to the Business Systems Layer. The Business Systems Layer falls under the responsibility of BGNA. The proposed TSF will incorporate BGNA’s well-established Business Systems Layer into the proposed TSF’s process controls. For effective and safe operation of the proposed TSF, specific systems in the Business Layer will be integrated with the proposed TSF’s Level 3 systems. Integration between Level 3 and Level 4 systems will be focused on systems related to Supply Chain Management (logistics and materials management) and Maintenance. The Systems Network Architecture is illustrated by the diagram included in Appendix 1-A (H340940-0000-75-004-0009). The architecture depicts the Process Control Network (Level 0, 1, and 2), the Production & Process Network (Level 3), and the Information Technologies, Business and North America Regional Business Unit (NARBU) network (Level 4). PMR RCRA Permit Application, Dry Hills Facility Page 40 JBR Environmental Consultants, Inc. | HATCH March 2013
Control System Architecture The plant control hardware and operator interface terminals are collectively referred to as the PCS. The PCS will connect the elements of control at remote locations by the control network. The PCS will be used to control and monitor the equipment and information that will be displayed on the HMI. All motor starters, variable speed drives (VSDs) and field device signals will be connected to the PLC. The PCS will perform all the motor control logics and interlocks as well as all the analog scaling and loop control. Vendor supplied control systems for the equipment will be connected to the PCS. The control system and instrumentation will be designed to enable an orderly and safe shutdown sequence of the equipment. The PCS/Systems architecture (Figure 1.5-2) will be structured as a standard hierarchy, consisting of the following: PMR RCRA Permit Application, Dry Hills Facility Page 41 JBR Environmental Consultants, Inc. | HATCH March 2013
- Page 41 and 42: 19.0 APPROVAL OF PETITION FOR EXTEN
- Page 43 and 44: LIST OF TABLES Table 1.2-1 Secondar
- Page 45 and 46: Figure 23.1-1 Decomposition & Waste
- Page 47 and 48: Section 10 Appendices 10-A Figures
- Page 49 and 50: HVAC Heating, Ventilation, and Air
- Page 51 and 52: GLOSSARY OF SELECTED TERMS [Authori
- Page 53 and 54: INTRODUCTION Precious Metals Recove
- Page 55 and 56: Pre-application Public Meeting - 40
- Page 57 and 58: (Purity ≥ 99.5%, Directly Stored)
- Page 59 and 60: Administration (MSHA) document, Con
- Page 61 and 62: Fire Doors/Emergency Exit Doors Pr
- Page 63 and 64: When leaving the plant spaces, work
- Page 65 and 66: Infiltration Air Office Area Pig Pi
- Page 67 and 68: personnel will be trained in respon
- Page 69 and 70: Figure 1.2-1: Elemental Mercury Tra
- Page 71 and 72: Tanks Or Containers Carbon Drums (n
- Page 73 and 74: Figure 1.2-2: Calomel Feed Preparat
- Page 75 and 76: Figure 1.2-3: Filter Press and Loca
- Page 77 and 78: Activated carbon is used in the air
- Page 79 and 80: Figure 1.2-5: SO2 Scrubber and Loca
- Page 81 and 82: Above the retort tray/drum transfer
- Page 83 and 84: Figure 1.2-8: Carbon Filter and Loc
- Page 85 and 86: Figure 1.2-10: Overall Ventilation
- Page 87 and 88: Wash water from open sumps. Safety
- Page 89 and 90: 1.3 Elemental Mercury Storage - 40
- Page 91: The following items are located out
- Page 95 and 96: will be supplied in accordance with
- Page 97 and 98: Outdoor Material Storage A list of
- Page 99 and 100: It is recognized that the fire prot
- Page 101 and 102: Outdoor Areas Hydrants and hose bo
- Page 103 and 104: the event of a security violation,
- Page 105 and 106: 2.3 Determination of Treatment Para
- Page 107 and 108: Table 2.5-2: Test Methods Parameter
- Page 109 and 110: Sampling Containerized Waste The te
- Page 111 and 112: Process Waste Solution A discrete p
- Page 113 and 114: ii. The sampling person removes a s
- Page 115 and 116: 2.9 Screening for Ignitable, Reacti
- Page 117 and 118: 3.0 SECURITY PLAN - 40 CFR 270.14(b
- Page 119 and 120: 4.0 INSPECTION PLAN - 40 CFR 270.14
- Page 121 and 122: TSF, associated hazards, places whe
- Page 123 and 124: Outside of working hours, a notific
- Page 125 and 126: Damaged containers will be placed i
- Page 127 and 128: 7.0 PREVENTION AND SAFETY PROCEDURE
- Page 129 and 130: 8.0 PREVENTION OF ACCIDENTAL IGNITI
- Page 131 and 132: 10.0 TRAFFIC - 40 CFR 270.14(b)(10)
- Page 133 and 134: Delivery frequency of reagents will
- Page 135 and 136: 10.3 Traffic Control Signs Traffic
- Page 137 and 138: 11.4 Surrounding Land Use - 40 CFR
- Page 139 and 140: 12.0 PERSONNEL TRAINING PLAN - 40 C
- Page 141 and 142: that are not land based. Closure of
Control System Architecture<br />
The plant control hardware and operator interface terminals are collectively referred to as the<br />
PCS. The PCS will connect the elements of control at remote locations by the control network.<br />
The PCS will be used to control and monitor the equipment and information that will be<br />
displayed on the HMI.<br />
All motor starters, variable speed drives (VSDs) and field device signals will be connected to the<br />
PLC. The PCS will perform all the motor control logics and interlocks as well as all the analog<br />
scaling and loop control.<br />
Vendor supplied control systems for the equipment will be connected to the PCS.<br />
The control system and instrumentation will be designed to enable an orderly and safe shutdown<br />
sequence of the equipment.<br />
The PCS/Systems architecture (Figure 1.5-2) will be structured as a standard hierarchy,<br />
consisting of the following:<br />