23.07.2013 Views

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PMR Nevada <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong> - Completeness Checklist<br />

ITEM # REGULATIONS GENERAL DESCRIPTION<br />

LOCATION IN<br />

APPLICATION<br />

Not Applicable,<br />

B-11 270.14(b)(11)(iv) If facility is located in 100-year floodplain:<br />

Plans and schedule for future compliance [Applicable for<br />

Appendix 11-A<br />

B-11 270.14(b)(11)(v) existing facilities not in compliance with 40 CFR 264.18(b).] Not Applicable, 11.2<br />

B-12 270.14(b)(12) Training programs in compliance with 264.16 12.0<br />

B-12<br />

270.14(b)(12)<br />

264.16(a)(1)<br />

Outline of Introductory and Continuing Training Programs<br />

[Facility personnel must successfully complete classroom or onthe-job<br />

training which will allow them to responsibly perform in<br />

their positions.] Appendix 12-A<br />

B-12 264.16(a)(1), (2) Relevance of training to job tasks Appendix 12-A<br />

B-12 264.16(a)(2)<br />

Training Director [Program must be directed by person<br />

trained in HW procedures.] Appendix 120-A<br />

B-12 264.16(a)(3)<br />

Training for Emergency Response [At a minimum, personnel<br />

must be made familiar with emergency procedures,<br />

equipment, and systems.] 12.0, Appendix 12-A<br />

B-12 264.16(a)(b) Training within 6 months of hire. 12.0, Appendix 12-A<br />

B-12 264.16(a)(c) Annual review 12.0, Appendix 12-A<br />

B-12 264.16(d), (e) Maintenance of training records 12.0, Appendix 12-A<br />

B-11 264.3 Applicability 7.0<br />

B-11 264.31 Design and operation of the facility 1.0<br />

B-13 270.14(b)(13) A copy of the closure plan and, if applicable, post closure plan 13.0, Appendix 13-A<br />

B-13 264.111 Closure Performance Standard 13.1<br />

B-13 264.111(a) Further maintenance [Minimize need] 13.1.1<br />

B-13 264.111(b) Post-Closure Escape [Control, Minimize, Eliminate] 13.1.2<br />

B-13 264.111(c) Unit-specific closure requirements 13.1.3<br />

B-13 264.111(b) Steps for Partial and/or Final Closure at any point 13.1.4<br />

B-13 264.112(b)(1)<br />

Description of how each HWMU will be closed in accordance<br />

with 264.111<br />

Final closure of the facility, in accordance with 264.11.<br />

[Identify the max extent of the operations which will be<br />

Appendix 13-A<br />

B-13 264.112(b)(2)<br />

unclosed during the active life of the facility.] Appendix 13-A<br />

B-13 264.112(b)(3) Max inventory of HW ever on-site 13.4<br />

ADMIN<br />

COMPLETE<br />

(Y / N / NA)<br />

TECH<br />

COMPLETE<br />

(Y / N / NA)<br />

COMMENTS<br />

Page 8 of 18<br />

March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!