23.07.2013 Views

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.2.3 Retort<br />

The retort system is designed to treat spent activated carbon and filter cake from the calomel<br />

treatment caustic leach circuit discussed in Section 1.2.2 above. The retort system and its<br />

location in the Process Area are shown below (Figure 1.2-4).<br />

Figure 1.2-4: Retort and Location in Process Area<br />

PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page 24<br />

JBR Environmental Consultants, Inc. | HATCH March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!