Insulation The following insulation values will be provided in the building of the proposed TSF: Roof R = 20 Walls R = 13 Walls Below Grade R = 7.5 Unheated Slabs R = 10 Note: R-value is a measure of insulation resistivity. Secondary Partitions Secondary partitions within the storage area will be insulated sheet metal wall panels. The wall height will be from floor to the bottom chord of the roof trusses. All joints will be sealed with flexible seal materials and finished with an epoxy coating. The surfaces will be coated with epoxy enamel. Secondary partitions within the office/washrooms areas will be concrete wall and sealed with epoxy coating. Personnel Doors Exterior and interior personnel doors within the facility will be constructed of a pressed steel frame and a door, both coated with epoxy enamel. A glazed panel will be inset at eye level wherever practical and necessary. The industrial doors throughout the building are described below. Exterior over-head doors Structural steel channel frame coated with epoxy enamel. Insulated, hurricane resistant roll-up metal sectional door coated with epoxy enamel. Motorized. Weather sealed. Safety reversing edges. Interior Roll-up Doors Structural steel channel frame coated with epoxy enamel. Metal door coated with epoxy enamel. Motorized. Safety reversing edges. PMR RCRA Permit Application, Dry Hills Facility Page 8 JBR Environmental Consultants, Inc. | HATCH March 2013

Fire Doors/Emergency Exit Doors Pressed steel frame and doors with UL fire resistance rating with glazed panel at eye level. Motorized roll-up curtain door coated with epoxy enamel and with steel slats and fusible links. Door Glazed Panels Hardware Windows Fire doors/Emergency exit doors: 6 millimeters (mm) thick, wired clear glazing with steel wire mesh 13 mm on center for fire rated doors. Interior doors: 6 mm thick, clear tempered glass Hardware, including panic hardware, for both interior/exterior personnel doors will be extra heavy-duty, industrial type. Key system will be based on a grand master, sub-master, and individual areas as required by industry standards. Exterior Windows: steel industrial frame with opening section, double-glazed units with paint finish. Interior Windows: steel industrial frame with sliding section and single-glazed units with paint finish. Floor Finishes Concrete floors in all process and storage areas: coated with epoxy enamel. Clean and dirty locker rooms, washrooms, janitors’ room, laundry room, and lunch room: non-slip ceramic or quarry tile. Offices and entrance lobby: sheet vinyl or vinyl composite tile. Concrete floors in service rooms: coated with epoxy enamel. Wall Finishes Concrete walls in all process and storage areas: coated with epoxy enamel. Offices and entrance lobby: painted concrete. Clean and dirty locker rooms, washrooms: ceramic tile on concrete walls. PMR RCRA Permit Application, Dry Hills Facility Page 9 JBR Environmental Consultants, Inc. | HATCH March 2013

Fire Doors/Emergency Exit Doors<br />

Pressed steel frame and doors with UL fire resistance rating with glazed panel at eye<br />

level.<br />

Motorized roll-up curtain door coated with epoxy enamel and with steel slats and<br />

fusible links.<br />

Door Glazed Panels<br />

Hardware<br />

Windows<br />

Fire doors/Emergency exit doors: 6 millimeters (mm) thick, wired clear glazing with<br />

steel wire mesh 13 mm on center for fire rated doors.<br />

Interior doors: 6 mm thick, clear tempered glass<br />

Hardware, including panic hardware, for both interior/exterior personnel doors will be<br />

extra heavy-duty, industrial type.<br />

Key system will be based on a grand master, sub-master, and individual areas as<br />

required by industry standards.<br />

Exterior Windows: steel industrial frame with opening section, double-glazed units<br />

with paint finish.<br />

Interior Windows: steel industrial frame with sliding section and single-glazed units<br />

with paint finish.<br />

Floor Finishes<br />

Concrete floors in all process and storage areas: coated with epoxy enamel.<br />

Clean and dirty locker rooms, washrooms, janitors’ room, laundry room, and lunch<br />

room: non-slip ceramic or quarry tile.<br />

Offices and entrance lobby: sheet vinyl or vinyl composite tile.<br />

Concrete floors in service rooms: coated with epoxy enamel.<br />

Wall Finishes<br />

Concrete walls in all process and storage areas: coated with epoxy enamel.<br />

Offices and entrance lobby: painted concrete.<br />

Clean and dirty locker rooms, washrooms: ceramic tile on concrete walls.<br />

PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page 9<br />

JBR Environmental Consultants, Inc. | HATCH March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!