Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
TABLE OF CONTENTS INTRODUCTION .......................................................................................................................... 1 1.0 FACILITY DESCRIPTION – 40 CFR 270.14(b)(1) ........................................................... 4 1.1 Building Design – 40 CFR 270.14(b)(1) & 264.31 .................................................. 5 1.2 Facility Operation and Process Descriptions – 40 CFR 270.14(b)(1) & 264.31 .... 14 1.3 Elemental Mercury Storage – 40 CFR 270.14(b)(1) .............................................. 37 1.4 Emergency Power – 40 CFR 270.14(b)(1) ............................................................. 38 1.5 Utilities and Services – 40 CFR 270.14(b)(1) ........................................................ 38 1.6 Parking.................................................................................................................... 50 1.7 Security Systems – 40 CFR 270.14(b)(4) .............................................................. 51 2.0 WASTE CHARACTERISTICS ......................................................................................... 52 2.1 Purpose – 40 CFR 270.14(b)(3) ............................................................................. 52 2.2 Waste Analysis Plan – 40 CFR 270.14(b)(3) ......................................................... 52 2.3 Determination of Treatment Parameters – 40 CFR 270.14(b)(3) & 264.13(b)(1) . 53 2.4 Rationale for Parameter Selection - 40 CFR 270.14(b)(3) & 264.13(b)(1) ........... 53 2.5 Analytical Test Methods - 40 CFR 264.13(b)(2) and 264.13(b)(3) ....................... 54 2.6 Sampling Methods - 40 CFR 264.13(b)(2) & 40 CFR 264.13(b)(3) ..................... 55 2.7 Frequency of Analysis - 40 CFR 270.14(b)(2) & 264.13(b)(4) ............................. 57 2.8 Off-site Generated Wastes – 40 CFR 270.14(b)(3), 264.13(b)(5), & 264.13(c) .... 59 2.9 Screening for Ignitable, Reactive, or Incompatible Wastes ................................... 63 2.10 Bulk Liquids and Containerized Liquids – 40 CFR 270.14(b)(3), 264.13(b)(6), & 264.314 ................................................................................................................... 63 2.11 Requirements for Incinerators – 40 CFR 270.14(b)(3) & 264.13(b)(6) ................. 63 2.12 Requirements for Containment Buildings – 40 CFR 270.14(b)(3) & 264.1100 .... 64 2.13 Ensure Compliance with LDR Requirements – 40 CFR 270.14(b)(3), 264.13(b)(3), 264.73, & 268 ......................................................................................................... 64 3.0 SECURITY PLAN – 40 CFR 270.14(b)(4) ....................................................................... 65 3.1 Facility Surveillance – 40 CFR 264.14(b)(1) ......................................................... 65 PMR RCRA Permit Application, Dry Hills Facility Page ii JBR Environmental Consultants, Inc. | HATCH March 2013
3.2 Barrier and Means to Control Entry – 40 CFR 264.14(a) & 264.14(b)(2)............. 65 3.3 Warning Signs – 40 CFR 264.14(c) ....................................................................... 66 4.0 INSPECTION PLAN – 40 CFR 270.14(b)(5) ................................................................... 67 5.0 COMMUNICATION PLAN – 40 CFR 264.34 ................................................................. 68 5.1 Internal Communications ....................................................................................... 68 5.2 External Communications ...................................................................................... 68 5.3 Non-Critical Alarms Communications Strategy .................................................... 69 5.4 Critical Alarms Communications Strategy ............................................................ 69 5.5 Required Equipment ............................................................................................... 71 5.6 Required Aisle Space – 40 CFR 264.35 ................................................................. 72 5.7 Maintenance and Normal Operation Procedures – 40 CFR 264.33 ....................... 72 6.0 CONTINGENCY PLAN – 40 CFR 270.14(b)(7) .............................................................. 74 7.0 PREVENTION AND SAFETY PROCEDURES – 40 CFR 264 Subpart C ..................... 75 7.1 Design and Operation of Facility – 40 CFR 264.31 ............................................... 75 8.0 PREVENTION OF ACCIDENTAL IGNITION, REACTION OF IGNITABLE, REACTIVE, INCOMPATIBLE WASTES – 40 CFR 270.14(b)(9).................................. 77 8.1 Precautions ................................................................................................................... 77 9.0 MANIFEST SYSTEM, RECORDKEEPING, AND REPORTING – 40 CFR 264 Subpart_E ........................................................................................................................... 78 10.0 TRAFFIC PATTERNS – 40 CFR 270.14(b)(10) .............................................................. 79 10.1 Traffic Patterns ....................................................................................................... 79 10.2 Estimated Traffic Volume ...................................................................................... 80 10.3 Traffic Control Signs .............................................................................................. 83 10.4 Road Surfaces and Load-Bearing Capacity ............................................................ 83 10.5 Road Surface Composition and Design Loading ................................................... 83 11.0 FACILITY LOCATION – 40 CFR 270.14(b)(11) & 264.18 ............................................ 84 11.1 Topographic Map – 40 CFR 270.14(b)(19) ........................................................... 84 11.2 Floodplain – 40 CFR 270.14(b)(11), 270.14(b)(19), & 264.18(b) ......................... 84 11.3 Surface Waters – 40 CFR 270.14(b)(19) & 264.18(b) ........................................... 84 11.4 Surrounding Land Use – 40 CFR 270.14(b)(19) & 264.18(c) ............................... 85 PMR RCRA Permit Application, Dry Hills Facility Page iii JBR Environmental Consultants, Inc. | HATCH March 2013
- Page 1 and 2: Precious Metals Recovery LLC RCRA P
- Page 3 and 4: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 5 and 6: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 7 and 8: PMR Nevada RCRA Permit Application
- Page 9 and 10: PMR Nevada RCRA Permit Application
- Page 11 and 12: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 13 and 14: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 15 and 16: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 17 and 18: ITEM # REGULATIONS GENERAL DESCRIPT
- Page 19 and 20: M-3 M-3 ITEM # REGULATIONS GENERAL
- Page 21 and 22: OMB# 2050-0024; Expires ___________
- Page 23 and 24: EPA ID Number OMB#: 2050-0024; Expi
- Page 25 and 26: EPA ID Number ADDENDUM TO THE SITE
- Page 27 and 28: EPA ID Number OMB#: 2050-0024; Expi
- Page 29 and 30: EPA ID Number OMB#: 2050-0024; Expi
- Page 31 and 32: EPA ID Number OMB#: 2050-0024; Expi
- Page 33 and 34: This document is for reference purp
- Page 35 and 36: A B C D E F $$W ATERMARKD$$ N 4,475
- Page 37: Precious Metals Recovery LLC Dry Hi
- Page 41 and 42: 19.0 APPROVAL OF PETITION FOR EXTEN
- Page 43 and 44: LIST OF TABLES Table 1.2-1 Secondar
- Page 45 and 46: Figure 23.1-1 Decomposition & Waste
- Page 47 and 48: Section 10 Appendices 10-A Figures
- Page 49 and 50: HVAC Heating, Ventilation, and Air
- Page 51 and 52: GLOSSARY OF SELECTED TERMS [Authori
- Page 53 and 54: INTRODUCTION Precious Metals Recove
- Page 55 and 56: Pre-application Public Meeting - 40
- Page 57 and 58: (Purity ≥ 99.5%, Directly Stored)
- Page 59 and 60: Administration (MSHA) document, Con
- Page 61 and 62: Fire Doors/Emergency Exit Doors Pr
- Page 63 and 64: When leaving the plant spaces, work
- Page 65 and 66: Infiltration Air Office Area Pig Pi
- Page 67 and 68: personnel will be trained in respon
- Page 69 and 70: Figure 1.2-1: Elemental Mercury Tra
- Page 71 and 72: Tanks Or Containers Carbon Drums (n
- Page 73 and 74: Figure 1.2-2: Calomel Feed Preparat
- Page 75 and 76: Figure 1.2-3: Filter Press and Loca
- Page 77 and 78: Activated carbon is used in the air
- Page 79 and 80: Figure 1.2-5: SO2 Scrubber and Loca
- Page 81 and 82: Above the retort tray/drum transfer
- Page 83 and 84: Figure 1.2-8: Carbon Filter and Loc
- Page 85 and 86: Figure 1.2-10: Overall Ventilation
- Page 87 and 88: Wash water from open sumps. Safety
TABLE OF CONTENTS<br />
INTRODUCTION .......................................................................................................................... 1<br />
1.0 FACILITY DESCRIPTION – 40 CFR 270.14(b)(1) ........................................................... 4<br />
1.1 Building Design – 40 CFR 270.14(b)(1) & 264.31 .................................................. 5<br />
1.2 Facility Operation and Process Descriptions – 40 CFR 270.14(b)(1) & 264.31 .... 14<br />
1.3 Elemental Mercury Storage – 40 CFR 270.14(b)(1) .............................................. 37<br />
1.4 Emergency Power – 40 CFR 270.14(b)(1) ............................................................. 38<br />
1.5 Utilities and Services – 40 CFR 270.14(b)(1) ........................................................ 38<br />
1.6 Parking.................................................................................................................... 50<br />
1.7 Security Systems – 40 CFR 270.14(b)(4) .............................................................. 51<br />
2.0 WASTE CHARACTERISTICS ......................................................................................... 52<br />
2.1 Purpose – 40 CFR 270.14(b)(3) ............................................................................. 52<br />
2.2 Waste Analysis Plan – 40 CFR 270.14(b)(3) ......................................................... 52<br />
2.3 Determination of Treatment Parameters – 40 CFR 270.14(b)(3) & 264.13(b)(1) . 53<br />
2.4 Rationale for Parameter Selection - 40 CFR 270.14(b)(3) & 264.13(b)(1) ........... 53<br />
2.5 Analytical Test Methods - 40 CFR 264.13(b)(2) and 264.13(b)(3) ....................... 54<br />
2.6 Sampling Methods - 40 CFR 264.13(b)(2) & 40 CFR 264.13(b)(3) ..................... 55<br />
2.7 Frequency of Analysis - 40 CFR 270.14(b)(2) & 264.13(b)(4) ............................. 57<br />
2.8 Off-site Generated Wastes – 40 CFR 270.14(b)(3), 264.13(b)(5), & 264.13(c) .... 59<br />
2.9 Screening for Ignitable, Reactive, or Incompatible Wastes ................................... 63<br />
2.10 Bulk Liquids and Containerized Liquids – 40 CFR 270.14(b)(3), 264.13(b)(6), &<br />
264.314 ................................................................................................................... 63<br />
2.11 Requirements for Incinerators – 40 CFR 270.14(b)(3) & 264.13(b)(6) ................. 63<br />
2.12 Requirements for Containment Buildings – 40 CFR 270.14(b)(3) & 264.1100 .... 64<br />
2.13 Ensure Compliance with LDR Requirements – 40 CFR 270.14(b)(3), 264.13(b)(3),<br />
264.73, & 268 ......................................................................................................... 64<br />
3.0 SECURITY PLAN – 40 CFR 270.14(b)(4) ....................................................................... 65<br />
3.1 Facility Surveillance – 40 CFR 264.14(b)(1) ......................................................... 65<br />
PMR <strong>RCRA</strong> <strong>Permit</strong> <strong>Application</strong>, <strong>Dry</strong> <strong>Hills</strong> Facility Page ii<br />
JBR Environmental Consultants, Inc. | HATCH March 2013