Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
CONTINUOUS LAYER OF BUTYL SEALANT OR GROUT EPOXY PAINT ON PRECAST EPOXY CAULKING BACKER ROD EPOXY CAULKING BACKER ROD 8" THICK INSULATED PRECAST CONCRETE PANEL EPOXY PAINTED INTERIOR FACE DETAIL OF PRECAST WALL PANEL AT FOUNDATION WALL SCALE 3/4" = 1'-0" DESCRIPTION: PRECAST AT FOUNDATION WALL PROJECT: 2 1/2" BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON 1'-3 1/2" 1'-0" 1" EPOXY SEALANT 1'-0" PROJECT NO. H340940 DRAWING NO. SK-4 DATE: REV.O APPROVED: 2012/07/02 E
C8 x 11.5 EPOXY COATING ON 2" THICK INSULATED METAL SANDWICH PANEL CEILING PREPAINTED METAL SANDWICH PANEL ROOF WITH R20 RIGID INSULATION W8 x 31" BEAM ALL PANEL JOINTS SEALED W8 x 31 W8 x 31 SEALANT TO FILL VOIDS BETWEEN PRECAST CONCRETE, STEEL BEAM AND ROOF PANELS METAL CORNER PIECE 8" THICK INSULATED PRECAST CONCRETE PANEL EPOXY PAINTED INTERIOR FACE DETAIL OF ROOF, WALL & CEILING CONSTRUCTION - PROCESS AREA SCALE 3/4" = 1'-0" DESCRIPTION: ROOF, WALL & CEILING IN PROCESS AREA PROJECT: BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON W10 x 49 1'-3 1/2" 22 GA. PREFINISHED METAL FLASHING CONTINUOUS EPOXY CAULKING AT METAL CORNER PIECE PROJECT NO. H340940 DRAWING NO. SK-5 DATE: REV.O APPROVED: 2012/07/02 E
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
- Page 285 and 286: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 287: 8" THICK INSULATED PRECAST CONCRETE
- Page 291 and 292: 2. PRODUCTS 2.1 Stonclad GS Stoncla
- Page 293 and 294: APPENDIX 2-A Waste Analysis Plan
- Page 295 and 296: WASTE ANALYSIS PLAN 1 PURPOSE AND S
- Page 297 and 298: Table 1: Analytical Methods for the
- Page 299 and 300: All wastes received will have been
- Page 301 and 302: Waste will not be accepted until th
- Page 303 and 304: Table 3: Waste Sampling Matrix Type
- Page 305 and 306: 9 LDR TREATMENT STANDARDS Waste Des
- Page 307 and 308: Drummed consolidation waste will be
- Page 309 and 310: eevaluated whenever the process tha
- Page 311 and 312: ATTACHMENT 2-A-1 Profile Instructio
- Page 313 and 314: PMR LLC 460 W. 50 North Suite 500 S
- Page 315 and 316: • Is the waste pyrophoric? a See
- Page 317 and 318: EPA's Chemical Compatibility Chart
- Page 319 and 320: 1.0 SCOPE AND APPLICATION METHOD 90
- Page 321 and 322: 7.2.3 Adjust the electrodes in the
- Page 323 and 324: METHOD 9045D SOIL AND WASTE pH 9045
- Page 325 and 326: NOTE: Combination electrodes incorp
- Page 327 and 328: 10.0 REFERENCES 1. National Bureau
- Page 329 and 330: 1.0 SCOPE AND APPLICATION METHOD 13
- Page 331 and 332: 4.2.2 Bottle Extraction Vessel. Whe
- Page 333 and 334: 4.10 Watchglass, appropriate diamet
- Page 335 and 336: 7.0 PROCEDURE 7.1 Preliminary Evalu
- Page 337 and 338: determine whether the solid materia
CONTINUOUS<br />
LAYER OF BUTYL<br />
SEALANT OR GROUT<br />
EPOXY PAINT ON<br />
PRECAST<br />
EPOXY CAULKING<br />
BACKER ROD<br />
EPOXY<br />
CAULKING<br />
BACKER ROD<br />
8" THICK INSULATED PRECAST<br />
CONCRETE PANEL<br />
EPOXY PAINTED INTERIOR FACE<br />
DETAIL OF PRECAST WALL PANEL AT FOUNDATION WALL<br />
SCALE 3/4" = 1'-0"<br />
DESCRIPTION:<br />
PRECAST AT FOUNDATION WALL<br />
PROJECT:<br />
2 1/2"<br />
BARRICK GOLDSTRIKE MINES<br />
PRECIOUS METALS RECOVERY PROJECT<br />
MERCURY TSDF BUILDING<br />
SCALE:<br />
DESIGN: DRAWN:<br />
3/4" = 1'-0" T. JACKSON T. JACKSON<br />
1'-3 1/2"<br />
1'-0"<br />
1"<br />
EPOXY SEALANT<br />
1'-0"<br />
PROJECT NO.<br />
H340940<br />
DRAWING NO.<br />
SK-4<br />
DATE: REV.O<br />
APPROVED:<br />
2012/07/02 E