CONTINUOUS LAYER OF BUTYL SEALANT OR GROUT EPOXY PAINT ON PRECAST EPOXY CAULKING BACKER ROD EPOXY CAULKING BACKER ROD 8" THICK INSULATED PRECAST CONCRETE PANEL EPOXY PAINTED INTERIOR FACE DETAIL OF PRECAST WALL PANEL AT FOUNDATION WALL SCALE 3/4" = 1'-0" DESCRIPTION: PRECAST AT FOUNDATION WALL PROJECT: 2 1/2" BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON 1'-3 1/2" 1'-0" 1" EPOXY SEALANT 1'-0" PROJECT NO. H340940 DRAWING NO. SK-4 DATE: REV.O APPROVED: 2012/07/02 E

C8 x 11.5 EPOXY COATING ON 2" THICK INSULATED METAL SANDWICH PANEL CEILING PREPAINTED METAL SANDWICH PANEL ROOF WITH R20 RIGID INSULATION W8 x 31" BEAM ALL PANEL JOINTS SEALED W8 x 31 W8 x 31 SEALANT TO FILL VOIDS BETWEEN PRECAST CONCRETE, STEEL BEAM AND ROOF PANELS METAL CORNER PIECE 8" THICK INSULATED PRECAST CONCRETE PANEL EPOXY PAINTED INTERIOR FACE DETAIL OF ROOF, WALL & CEILING CONSTRUCTION - PROCESS AREA SCALE 3/4" = 1'-0" DESCRIPTION: ROOF, WALL & CEILING IN PROCESS AREA PROJECT: BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON W10 x 49 1'-3 1/2" 22 GA. PREFINISHED METAL FLASHING CONTINUOUS EPOXY CAULKING AT METAL CORNER PIECE PROJECT NO. H340940 DRAWING NO. SK-5 DATE: REV.O APPROVED: 2012/07/02 E

CONTINUOUS<br />

LAYER OF BUTYL<br />

SEALANT OR GROUT<br />

EPOXY PAINT ON<br />

PRECAST<br />

EPOXY CAULKING<br />

BACKER ROD<br />

EPOXY<br />

CAULKING<br />

BACKER ROD<br />

8" THICK INSULATED PRECAST<br />

CONCRETE PANEL<br />

EPOXY PAINTED INTERIOR FACE<br />

DETAIL OF PRECAST WALL PANEL AT FOUNDATION WALL<br />

SCALE 3/4" = 1'-0"<br />

DESCRIPTION:<br />

PRECAST AT FOUNDATION WALL<br />

PROJECT:<br />

2 1/2"<br />

BARRICK GOLDSTRIKE MINES<br />

PRECIOUS METALS RECOVERY PROJECT<br />

MERCURY TSDF BUILDING<br />

SCALE:<br />

DESIGN: DRAWN:<br />

3/4" = 1'-0" T. JACKSON T. JACKSON<br />

1'-3 1/2"<br />

1'-0"<br />

1"<br />

EPOXY SEALANT<br />

1'-0"<br />

PROJECT NO.<br />

H340940<br />

DRAWING NO.<br />

SK-4<br />

DATE: REV.O<br />

APPROVED:<br />

2012/07/02 E