Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
Precious Metals Recovery LLC RCRA Permit Application Dry Hills ... Precious Metals Recovery LLC RCRA Permit Application Dry Hills ...
PREPAINTED METAL SANDWICH PANEL ROOF WITH R20 RIGID INSULATION STRUCTURAL TRUSS EPOXY COATING ON 2" THICK INSULATED METAL SANDWICH PANEL CEILING METAL CORNER PIECE 8" CONCRETE BLOCK WALL EPOXY PAINTED INTERIOR FACE DETAIL INTERIOR BLOCK WALL & ROOF SCALE 3/4" = 1'-0" 4 1/4" DESCRIPTION: INTERIOR BLOCK WALL & ROOF PROJECT: CONTINUOUS EPOXY CAULKING AT METAL CORNER PIECE BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON FIRE RATED CAULKING 3" x 4" x 0.25 ANGLES FIRE RATED CAULKING AROUND BEAM AT WALL PENETRATON THE BLOCK WALLS SHALL BE REINFORCED BASED ON THE REQUIREMENTS BELOW: A. HORIZONTAL REINFORCEMENT SHALL CONSIST OF AT LEAST TWO LONGITUDINAL WIRES OF W1.7 BED JOINT REINFORCEMENT SPACED NOT MORE THAN 16 INCHES ON CENTER . B. VERTICAL REINFORCEMENT SHALL CONSIST OF ONE NO. 5 REBAR IN GROUTED CELLS SPACED NOT MORE THAN 48 INCHES ON CENTER. C. BOTH HORIZONTAL AND VERTICAL REINFORCEMENT SHALL BE LOCATED WITHIN 16 INCHES OF THE ENDS OF BLOCK WALLS. PROJECT NO. H340940 DRAWING NO. SK-2 DATE: REV.O APPROVED: 2012/07/02 E
8" THICK INSULATED PRECAST CONCRETE PANEL SEALANT AND BACKER ROD AT FRONT AND BACK OF JOINT CONTINUOUS 3" x 4" x 0.25 STEEL ANGLE EMBEDED IN FOUNDATION WALL 12" CONCRETE FOUNDATION WALL DETAIL OF PRECAST WALL PANEL AT COLUMN SCALE 3/4" = 1'-0" DESCRIPTION: COLUMN AT PRECAST WALL PROJECT: SEALANT AND BACKER ROD AT FRONT AND BACK OF JOINT EPOXY PAINTED INTERIOR FACE CONTINUOUS COMPRESSIBLE BUTYL STRIP BETWEEN PANELS 2 1/2" BARRICK GOLDSTRIKE MINES PRECIOUS METALS RECOVERY PROJECT MERCURY TSDF BUILDING SCALE: DESIGN: DRAWN: 3/4" = 1'-0" T. JACKSON T. JACKSON 1'-3 1/2" 1'-0" 3'-11 3/4" STANDARD PANEL WIDTH PROJECT NO. H340940 DRAWING NO. SK-3 DATE: REV.O APPROVED: 2012/07/02 E
- Page 235 and 236: A B C D EF $ $ W A TERMARKA1$$ H340
- Page 237 and 238: A B C D E F $$W ATERMARKD$$ H340940
- Page 239 and 240: A B C D E F $$W ATERMARKD$$ H340940
- Page 241 and 242: A B C D E F $$W ATERMARKD$$ H340940
- Page 243 and 244: A B C D E F $$W ATERMARKD$$ H340940
- Page 245 and 246: A B C D E F $$W ATERMARKD$$ H340940
- Page 247 and 248: A B C D E F $$W ATERMARKD$$ H340940
- Page 249 and 250: A B C D E F $$W ATERMARKD$$ NOTE: 1
- Page 251 and 252: A B C D E F $$W ATERMARKD$$ H340940
- Page 253 and 254: B A B C D E F $$W ATERMARKD$$ H3409
- Page 255 and 256: A B C D E F $$W ATERMARKD$$ H340940
- Page 257 and 258: A B C D E F $$W ATERMARKD$$ H340940
- Page 259 and 260: APPENDIX 1-C Process Flow Diagrams
- Page 261 and 262: A B C D E F $$W ATERMARKD$$ 1 2 3 4
- Page 263 and 264: A B C D E F $$W ATERMARKD$$ H340940
- Page 265 and 266: A B C D E F $$W ATERMARKD$$ H340940
- Page 267 and 268: A B C D E F $$W ATERMARKD$$ H340940
- Page 269 and 270: A B C D E F $$W ATERMARKD$$ H340940
- Page 271 and 272: A B C D E F $$W ATERMARKD$$ H340940
- Page 273 and 274: H - 340940 Precious Metals Recovery
- Page 275 and 276: H - 340940 Precious Metals Recovery
- Page 277 and 278: H - 340940 Precious Metals Recovery
- Page 279 and 280: H - 340940 Precious Metals Recovery
- Page 281 and 282: H - 340940 Precious Metals Recovery
- Page 283 and 284: APPENDIX 1-D Floor and Wall Sealant
- Page 285: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 289 and 290: C8 x 11.5 EPOXY COATING ON 2" THICK
- Page 291 and 292: 2. PRODUCTS 2.1 Stonclad GS Stoncla
- Page 293 and 294: APPENDIX 2-A Waste Analysis Plan
- Page 295 and 296: WASTE ANALYSIS PLAN 1 PURPOSE AND S
- Page 297 and 298: Table 1: Analytical Methods for the
- Page 299 and 300: All wastes received will have been
- Page 301 and 302: Waste will not be accepted until th
- Page 303 and 304: Table 3: Waste Sampling Matrix Type
- Page 305 and 306: 9 LDR TREATMENT STANDARDS Waste Des
- Page 307 and 308: Drummed consolidation waste will be
- Page 309 and 310: eevaluated whenever the process tha
- Page 311 and 312: ATTACHMENT 2-A-1 Profile Instructio
- Page 313 and 314: PMR LLC 460 W. 50 North Suite 500 S
- Page 315 and 316: • Is the waste pyrophoric? a See
- Page 317 and 318: EPA's Chemical Compatibility Chart
- Page 319 and 320: 1.0 SCOPE AND APPLICATION METHOD 90
- Page 321 and 322: 7.2.3 Adjust the electrodes in the
- Page 323 and 324: METHOD 9045D SOIL AND WASTE pH 9045
- Page 325 and 326: NOTE: Combination electrodes incorp
- Page 327 and 328: 10.0 REFERENCES 1. National Bureau
- Page 329 and 330: 1.0 SCOPE AND APPLICATION METHOD 13
- Page 331 and 332: 4.2.2 Bottle Extraction Vessel. Whe
- Page 333 and 334: 4.10 Watchglass, appropriate diamet
- Page 335 and 336: 7.0 PROCEDURE 7.1 Preliminary Evalu
8" THICK INSULATED PRECAST<br />
CONCRETE PANEL<br />
SEALANT AND BACKER ROD AT FRONT<br />
AND BACK OF JOINT<br />
CONTINUOUS 3" x 4" x 0.25<br />
STEEL ANGLE EMBEDED<br />
IN FOUNDATION WALL<br />
12" CONCRETE FOUNDATION WALL<br />
DETAIL OF PRECAST WALL PANEL AT COLUMN<br />
SCALE 3/4" = 1'-0"<br />
DESCRIPTION:<br />
COLUMN AT PRECAST WALL<br />
PROJECT:<br />
SEALANT AND BACKER ROD AT FRONT<br />
AND BACK OF JOINT<br />
EPOXY PAINTED INTERIOR FACE<br />
CONTINUOUS COMPRESSIBLE BUTYL<br />
STRIP BETWEEN PANELS<br />
2 1/2"<br />
BARRICK GOLDSTRIKE MINES<br />
PRECIOUS METALS RECOVERY PROJECT<br />
MERCURY TSDF BUILDING<br />
SCALE:<br />
DESIGN: DRAWN:<br />
3/4" = 1'-0" T. JACKSON T. JACKSON<br />
1'-3 1/2"<br />
1'-0"<br />
3'-11 3/4"<br />
STANDARD PANEL WIDTH<br />
PROJECT NO.<br />
H340940<br />
DRAWING NO.<br />
SK-3<br />
DATE: REV.O<br />
APPROVED:<br />
2012/07/02 E